Skip to content
  • Home
  • Countries
  • Renewables
  • PSC’s
  • Tenders
  • Advertise
  • Shop
  • Events
  • Pump Prices
oilnewsafrica

oilnewsafrica

Africa's Oil, Gas and Energy News.

  • Home
  • Countries
  • Renewables
  • PSC’s
  • Tenders
  • Advertise
  • Shop
  • Events
  • Pump Prices

Flash News

BOTSWANA: TGS Prediktor Delivers PowerView™ SCADA for Scatec’s Mmadinare Solar Cluster

EGYPT: TAG Oil Provides Update on Drilling Operations at BED-1 Concession

EQUATORIAL GUINEA: Panoro Energy Reports Completion of Acquisition of Block G offshore

VAALCO Energy, Inc. Announces Exciting Operational Update in Offshore Gabon and in Egypt

ANGOLA: Kent awarded Construction Management Services contract by CABGOC

INAET’s third energy conference to convene in Abidjan, promoted by Eni, the World Bank Group and Luiss University

TGS Awarded Streamer 3D Contract in the Africa & Middle East Region

NAMIBIA: Shell announces New Oil Discovery in Orange Basin with Merlin-1X exploration well results

EQUATORIAL GUINEA: TGS Begins First Phase of Major Offshore Seismic Dataset off the Gulf of Guinea

GABON: Block Energy Expands with Strategic Entry into Gulf of Guinea Oil Sector

Wednesday, June 17, 2026

Tag: Early Production System

SOUTH AFRICA: Block 11B/12B JV Contemplating Early Production System for a Phased Development of the Paddavissie Fairway
Countries Southern Africa Top News

SOUTH AFRICA: Block 11B/12B JV Contemplating Early Production System for a Phased Development of the Paddavissie Fairway

November 10, 2021

Block 11B/12B joint venture partners are contemplating an early production system (EPS) for a phased development of the Paddavissie Fairway according to Africa Energy. Africa Energy says joint venture is … Read More

2D seismicAfrica EnergyAzinamBlock 11B/12BBlock 2BEarly Production SystemGazania-1 wellPaddavissie FairwaySouth Africa Comment on SOUTH AFRICA: Block 11B/12B JV Contemplating Early Production System for a Phased Development of the Paddavissie Fairway
Ntorya 3 Ready To Spud in H2 2018, As Ntorya Field declared Commercial
Uncategorized

Ntorya 3 Ready To Spud in H2 2018, As Ntorya Field declared Commercial

February 6, 2018

Aminex has said it expects spud the Ntorya 3 well in Tanzania in H2 2018 with the well planned to drill to a total depth (TD) of approximately 3,000m. Ntorya … Read More

Aminexcompetent person’s reportEarly Production SystemFull Field DevelopmentMadimba gas plantNtoryaNtorya 2Ntorya 3Ntorya-1RPS EnergyRuvuma PSAsolo oil Comment on Ntorya 3 Ready To Spud in H2 2018, As Ntorya Field declared Commercial

Cart

Contact US

Nairobi Office
Contact: Sam +254733897666,
Tel/ Whatsapp: +254724684368
Email:     sales@oilnewskenya.com
Find Us: 4th Floor, Piedmont Plaza, Ngong Road, Nairobi Kenya

Proudly powered by WordPress | Theme: TimesNews | By Theme Freesia.