Ntorya 3 Ready To Spud in H2 2018, As Ntorya Field declared Commercial
Aminex has said it expects spud the Ntorya 3 well in Tanzania in H2 2018 with the well planned to drill to a total depth (TD) of approximately 3,000m. Ntorya … Read More
Aminex has said it expects spud the Ntorya 3 well in Tanzania in H2 2018 with the well planned to drill to a total depth (TD) of approximately 3,000m. Ntorya … Read More
The Amosing 7 appraisal well drilled using the Marriot Rig 46 has encountered 25 meters of net oil and gas pay concluding the 2017 exploration and appraisal drilling campaign on a … Read More
Blocks 10BB and 13T operator Tullow Oil has said it expects the Final Investment Decision for the Kenya Full Field Development by the end of 2018. According to the operator … Read More
by Andrew Kamau, PS Department of Petroleum; Ministry of Energy & Petroleum The last four years have been the most remarkable period in Kenya’s Oil and Gas industry since exploration … Read More