Posted in Top News

KJV Plans 2 Phased Development in Kenya’s South Lokichar Fields

The Kenya joint venture partners (KJV) comprising of Tullow Oil, Africa Oil, Maersk O&G and the Kenya government are now…

Posted in Top News

New Assessment of Resources in South Lokichar Shows 25% lower Than Reported

A new full assessment of all the exploration and appraisal data, Tullow estimates that the South Lokichar basin contains the…

Posted in Top News

Tullow Oil announces $900M farm down of Uganda assets to Total

A Sale and Purchase Agreement with an effective date of 1 January 2017 has been signed in which Tullow has agreed…

Posted in Oil products Top News

Kenya’s Block 11B Loss Cost Bowleven $11.8 million in 2016

Bowleven has reported that the loss of its Kenyan acreage operated by Adamantine Energy resulted in unsuccessful exploration costs of…

Posted in Top News

Highlights of Tullow Oil, Total E&P Production Licences in Uganda

Duration: The Licences have been issued for a period of 25 years and can be renewed for an additional period…

Posted in Top News

Adamantine Energy, Bowleven Lose Kenya’s Block 11B

Kenya’s Block 11B operator Adamantine Energy and joint venture partner Bowleven will not be receiving an extension on their license…

Posted in Uncategorized

Adamantine Energy Kenya’s Block 11B License Expires

A PSC between Block 11B operator Adamantine Energy and the Republic of Kenya signed in June 2012 has expired with…

Posted in Top News

Bowleven awarded one year license extension Kenya block 11B

Bowleven has announced that it has received a license extension to enable evaluation ahead of second phase decision. Following the…

Posted in Elsewhere in Africa

Bowleven to start seismic testing in Kenya’s Block 11B

[twitter-follow screen_name=’oilnewskenya’] Bowleven is to soon start the 2D seismic testing in Block 11B after announcing that the seismic tender…