Technical Attributes Of East Africa Crude Oil Pipeline (Tanzania Segment)
Tanzania Pipeline Segment – Uganda Border to Chongoleani peninsula in Tanzania Marine Storage Terminal
– 1155 KM of 24” pipe = 96,250 joints : 177,627 Tons
– Divided into two Lots: Lot 2 = 614 km Lot 3 = 533 km
– 60 main line block valves for sectional isolation
– 62.8 KM of Temporary Access Roads
– 33.7 KM of Permanent Access Roads w/existing roads upgrades
– Ten (10) Temporary Pipeline Construction Camps
– 939 KM of 33 kV Power Cabling for Heat Trace power input- 1155 km of fiber optic cabling
– 3465 KM of 6.6 kV single phase EHT Cabling
Tanzania Pipeline Facilities
– 4 Crude Oil Pump Stations with capability of 216 kbopd
– 2 Pressure Reduction Stations
– Four (4) Temporary Construction Camps at Pump Stations
– One Temporary Construction Camp at the Marine Terminal One Temporary Construction Camp at the Marine Terminal
– Fifteen (15) Pre-Fabricated Engineered Electrical Heat Trace Substations
– Integrated SCADA/ICS system with redundant control functions at Tilenga and MST via fiber optic cabling & telecommunications
– 5 x 500k barrel crude oil storage tanks
– Marine Terminal with capability of exporting 1,000,000 barrel in 24 hours export to SUEZMAX class tanker 2 KM Offshore Jetty & Crude Oil Load Out Platform 28
– 2 KM Offshore Jetty & Crude Oil Load-Out Platform