GAMBIA: PetroNor Withdraws from Block A4
PetroNor E&P ASA advises that it is withdrawing from the exploration licence for Block A4 in The Gambia. This follows the expiry of the initial exploration phase of the licence … Read More
PetroNor E&P ASA advises that it is withdrawing from the exploration licence for Block A4 in The Gambia. This follows the expiry of the initial exploration phase of the licence … Read More
PetroNor E&P has announced that it had received, from the Government of The Gambia, a 30-day extension to the longstop date of the licence option. Following positive discussions with the Government, … Read More
A Memorandum of Understanding was signed tlast week between the Economic Community of West African States “ECOWAS”, represented by Mr. Sediko Douka, Commissioner of Infrastructure, Energy and Digitalization, the Federal … Read More
Through the Petroleum Commission, the Government of The Gambia has launched a Licensing Round, for the A1 Block, on the 7th of February 2022 which was originally announced at the … Read More
FAR has completed a review of the prospectivity of the A2 and A5 blocks offshore the Gambia, following the Bambo drilling campaign in late 2021. The drilling and logging data … Read More
Gambia’s Ministry of Petroleum and Energy has opened the ground for prospective bidders interested in Block A1 previously held by BP until August 2021. According to BP, the company exited … Read More
FAR concluded the drilling and formation evaluation operations for the Bambo-1 well and Bambo-1ST1 sidetrack well in Block A2, offshore The Gambia. Bambo-1 was initially drilled to a depth of … Read More
FAR has announced that it will plug and abandon Bambo-1 well and Bambo-1ST1 side-track well after drilling operations failed to encounter oil. Far said it had concluded the drilling and … Read More
PetroNor has announced that it has received, from the Government of The Gambia, a one-year extension to the Longstop date of the Licence until 18 October 2022, which will enable … Read More
FAR says operational and logistics planning for the drilling of the Bambo-1 well in offshore Block A2 are well advanced and the IceMax drillship is scheduled to be in Las … Read More