  • As previously communicated, production at Block G offshore Equatorial Guinea (Panoro 14.25 percent) has been impacted by unplanned facilities related downtime at the Ceiba field
  • Progress is being made with partial restoration of production at Ceiba achieved. Work will continue in 2026 to regain full potential and ensure reliability
  • Numerous ongoing productive and asset integrity projects will continue throughout 2026 and contribute to field life extension
  • The Joint Venture is evaluating the potential for future infill drilling campaigns in the Okume Complex, using a conventional jack-up rig in shallow water, and susbsea infill wells at the Ceiba field
  • At Block EG-23 offshore Equatorial Guinea (Panoro 80 percent, operator) seismic reprocessing and subsurface studies are ongoing with particular focus on existing discoveries (some of which have been tested) and surrounding prospectivity in shallow water depths of ~60 metres
    • Estrella discovery has been high-graded as a potential fast-track development candidate within tie-back distance to existing infrastructure (early concepts being evaluated)
    • Estrella-1 well discovered 60 metres net hydrocarbon pay in 2001 and was tested at 6,780 bopd (48 – 50° API) and 48.7 MMscfd
    • Six further oil, gas and gas/condensate discoveries have been made on the block

Gabon

  • Field delivery remains strong and steady at the Dussafu Marin Permit offshore Gabon (Panoro 17.5 percent)
  • Final Investment Decision (FID) was taken in H2 2025 for the MaBoMo Phase 2 drilling programme (previously Hibiscus Ruche Phase 2), comprising four planned development wells. First oil targeted in H2 2026
  • Bourdon discovery being matured towards FID with an expected initial three wells and a development cluster concept based on the MaBoMo blueprint 
  • Additional drilling targets have been identified in the vicinity of the Bourdon discovery which may add further upside
  • 3D seismic acquisition across the Niosi, Guduma (Panoro 25 percent) and Dussafu licenses has completed

Tunisia – TPS Assets

  • Production has remained stable at the TPS Assets in Tunisia (Panoro 49 percent) where ongoing workovers and upcoming optimisation campaigns are expected to positively impact production

Julien Balkany, Executive Chairman of Panoro, commented:

“Our average net production was 10,263 bopd for the full year, and is a new record high for Panoro. Our crude oil liftings of around 3.1 million barrels were in line with previously communicated expectations. In accordance with our 2025 shareholder returns policy the Company distributed a total of NOK 411 million to shareholders in the calendar year, with quarterly cash distributions amounting to NOK 320 million complemented with NOK 91 million through share buybacks. This brings the cumulative cash returned to shareholders through distributions and buybacks since March 2022 to NOK 795 million or approximately 36 per cent of Panoro’s market cap.

Looking ahead, we enter 2026 with significant exciting growth projects underway. As planned, we will resume drilling in Gabon with four new production wells at MaBoMo Phase 2 which we expect will increase gross production at Dussafu to the  nameplate capacity of around 40,000 bopd when all wells are onstream. Once processed and analysed the new state-of-the-art seismic data we have recently acquired covering the Niosi, Guduma and Dussafu blocks will allow us to confirm future high-impact drilling targets and further unlock the considerable upside potential of those blocks. In Equatorial Guinea we have high-graded the Estrella discovery on Block EG-23 as a potential fast-track appraisal and development project that could be tied back to existing infrastructure, and have an extensive inventory of additional prospects under evaluation.

With healthy cash position at 2025 year-end of approximately USD 78 million, we continue to be well positioned to deliver on our organic and external growth strategy coupled with our shareholder returns policy in order to maximise value for all our stakeholders.”

2025 Performance

Production

  • Group working interest production in Q4 and full-year 2025 was:
Average W.I. production – bopdQ4 2025FY 2025
Equatorial Guinea2,3742,919
Gabon5,3435,813
Tunisia1,5111,530
Total9,22810,263
  • 2026 production guidance will be provided at the Company’s full year 2025 results on 25 February 2026

Crude Oil Liftings

  • Crude oil volumes lifted and sold in Q4 and full-year 2025 were in line with previously communicated expectations:
 Q4 2025FY 2025
Volumes lifted1,050,138 barrels3,060,330 barrels
Average realised price after adjustments and customary feesUSD 60.66 / bblUSD 65.14 / bbl
ProceedsUSD 63.7 millionUSD 199.4 million

Note: Proceeds from oil sales differs to total reported revenue which includes a gross up for state profit oil in Gabon with a corresponding amount included as deemed income tax for reporting purposes

  • Panoro’s anticipated lifting schedule for 2026 is being finalised with partners and the Company will provide an update at its full year 2025 results on 25 February 2026