{"id":9903,"date":"2021-02-15T10:58:08","date_gmt":"2021-02-15T10:58:08","guid":{"rendered":"https:\/\/oilnewskenya.com\/?p=9903"},"modified":"2021-02-15T10:58:08","modified_gmt":"2021-02-15T10:58:08","slug":"djibouti-kengen-clinches-multi-well-geothermal-drilling-programme-contract","status":"publish","type":"post","link":"https:\/\/www.oilnewskenya.com\/index.php\/djibouti-kengen-clinches-multi-well-geothermal-drilling-programme-contract\/","title":{"rendered":"DJIBOUTI: KenGen Clinches Multi-well Geothermal drilling Programme Contract"},"content":{"rendered":"<p>Kenya Electricity Generating Company (KenGen) PLC has won yet another international contract to drill three geothermal wells in Djibouti.<\/p>\n<p>The company today signed a Ksh 709,822, 630 (USD 6,452,933) contract with Office Djiboutien De Development De lenergie Geothermique (Djiboutian Office of Geothermal Energy Development) (ODDEG).<\/p>\n<p>The ceremony, in Galla Le Koma, Djibouti, was attended by Kenya\u2019s Energy Cabinet Secretary, Hon. Charles Keter, and KenGen Managing Director &amp; CEO, Mrs. Rebecca Miano.<\/p>\n<p>Speaking during the event, Hon. Keter pointed out that African nations shared the common aspiration of delivering electricity to their people, which, he said, provided an opportunity to work together to meet the continent\u2019s energy needs. \u201cThe biggest challenge has remained access (to electricity) in remote areas, and in Sub-Saharan Africa with 573 million people not having access to this important commodity. Although energy access policies have continued to bear fruit, with 2019 data showing tremendous progress, we have seen the Coronavirus pandemic reverse the gains. We can only remain optimistic that things will change in 2021,\u201d the CS said.<\/p>\n<p>While highlighting Kenya\u2019s progress in achieving universal electricity access, he indicated that the country\u2019s National Electrification Strategy (KNES) launched in 2018 had played an important role in helping the nation achieve electrification in an economically viable manner.<\/p>\n<p>In 2019, Kenya\u2019s power installed capacity was 2,818.9 MW. Currently, the country\u2019s energy mix comprises geothermal (29%), hydro (29%), wind (12%), solar and others (2%) and thermal (28%).<\/p>\n<p>The CS said the country had made remarkable progress in increasing access to electric power as a result of deliberate government efforts and private sector investment.<\/p>\n<p>Kenya\u2019s journey towards harnessing geothermal energy, he added, started in the 1950s and assured Djibouti of support in enabling it to realise its geothermal potential. \u201cTo date, we have drilled more than 300 wells within the Olkaria field, which is the bedrock of Kenya\u2019s geothermal energy production. As a country, we have a geothermal energy potential of 10,000MW along the Rift Valley with the resource being harnessed in 23 sites,\u201d he said.<\/p>\n<p>For her part, Mrs. Miano expressed optimism that the three wells will be productive and enhance Djibouti\u2019s efforts towards growing its energy production.<\/p>\n<p>KenGen, which has embarked on a diversification strategy, leverages its expertise in geothermal energy by offering commercial drilling services, geothermal consulting and other energy-related services across Africa. Mrs. Miano said the company\u2019s strategic plan is to harness opportunities geared towards driving growth beyond Kenya. \u201cIt is therefore our desire that in the next couple of years, we shall have considerable presence in countries within the Continent. It is also worth noting that we are not only keen on increasing our presence in Africa, but also enhancing energy capacities across the region,\u201d she said.<\/p>\n<p>This is the third geothermal drilling contract that KenGen has won in Africa. In October 2019, the company secured a Ksh 5.8 billion contract to drill 12 geothermal wells in Ethiopia. The contract with an independent power producer includes installing a water supply system and equipment.<\/p>\n<p>In February 2019, KenGen won yet another contract for consultancy services and drilling geothermal wells. The contract is worth USD 76,801,344 (about Kshs 7.6 billion). It has also developed partnerships with countries such as Ethiopia and Rwanda in renewable energy development.<\/p>\n<p>KenGen has invested in experts with considerable experience in geothermal exploration and drilling and will build the capacities of teams from Djibouti who will be working on the project.<\/p>\n<p>Kenya is Africa\u2019s number one geothermal energy producer and among the top 10 in the world. KenGen has a geothermal installed capacity of 706 MW and is the leading geothermal power producer on the continent.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Kenya Electricity Generating Company (KenGen) PLC has won yet another international contract to drill three geothermal wells in Djibouti. The company today signed a Ksh 709,822, 630 (USD 6,452,933) contract &hellip; <a href=\"https:\/\/www.oilnewskenya.com\/index.php\/djibouti-kengen-clinches-multi-well-geothermal-drilling-programme-contract\/\" class=\"more-link\">Read More<\/a><\/p>\n","protected":false},"author":24,"featured_media":9904,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[7442,7443,4747,4746,11],"tags":[607,9037,990,1250,9036],"class_list":["post-9903","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-countries","category-eastern-africa","category-geothermal","category-renewables-2","category-top-news","tag-djibouti","tag-djiboutien-de-development-de-lenergie-geothermique","tag-geothermal","tag-kengen","tag-kenya-national-electrification-strategy","entry"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/02\/KenGen-Djibouti.jpg?fit=1024%2C602&ssl=1","jetpack_shortlink":"https:\/\/wp.me\/p5JWkQ-2zJ","jetpack-related-posts":[{"id":11239,"url":"https:\/\/www.oilnewskenya.com\/index.php\/djibouti-kengen-commences-multi-well-drilling-campaign\/","url_meta":{"origin":9903,"position":0},"title":"DJIBOUTI: KenGen Commences Multi-well Drilling Campaign","author":"","date":"November 25, 2021","format":false,"excerpt":"Kenya Electricity Generating Company (KenGen) PLC has commenced drilling of the first of three geothermal wells in Djibouti setting in motion a Ksh.0.7 billion contract signed in February this year. The drilling of the first well is expected to take about two months to complete as KenGen seeks to export\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/11\/KenGen-Djibouti.jpg?fit=720%2C540&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/11\/KenGen-Djibouti.jpg?fit=720%2C540&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/11\/KenGen-Djibouti.jpg?fit=720%2C540&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/11\/KenGen-Djibouti.jpg?fit=720%2C540&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":11131,"url":"https:\/\/www.oilnewskenya.com\/index.php\/ethiopia-kengen-completes-eeps-deepest-geothermal-well\/","url_meta":{"origin":9903,"position":1},"title":"Ethiopia KenGen Completes EEP&#8217;s Deepest Geothermal Well","author":"","date":"November 12, 2021","format":false,"excerpt":"Kenya Electricity Generating Company (KenGen) has announced the completion of a 3,000-meter geothermal well in Ethiopia, which exceeded the target of 2,750 meters. This is the second of eight wells it has been commissioned to drill by Ethiopian Electric Power Company (EEP) the state-owned electricity producer as Ethiopia seeks to\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/11\/KenGen-drilling-Aluto-Langano.jpeg?fit=800%2C599&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/11\/KenGen-drilling-Aluto-Langano.jpeg?fit=800%2C599&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/11\/KenGen-drilling-Aluto-Langano.jpeg?fit=800%2C599&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/11\/KenGen-drilling-Aluto-Langano.jpeg?fit=800%2C599&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":12230,"url":"https:\/\/www.oilnewskenya.com\/index.php\/ethiopia-kengen-completes-drilling-the-seventh-geothermal-well-at-the-aluto-langano-geothermal-field\/","url_meta":{"origin":9903,"position":2},"title":"ETHIOPIA: KenGen Completes Drilling the Seventh Geothermal Well at the Aluto-Langano Geothermal field","author":"","date":"April 30, 2022","format":false,"excerpt":"Kenya Electricity Generating Company PLC (KenGen) has completed drilling of the seventh geothermal well in Ethiopia further bolstering the company\u2019s renewable energy footprint in the Horn of Africa. This latest announcement is from the Aluto-Langano geothermal site where KenGen is implementing a drilling consultancy project for the state-owned Ethiopian Electric\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/09\/Geothermal-OW-923.png?fit=631%2C344&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/09\/Geothermal-OW-923.png?fit=631%2C344&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/09\/Geothermal-OW-923.png?fit=631%2C344&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":9042,"url":"https:\/\/www.oilnewskenya.com\/index.php\/east-african-countries-submit-17-expressions-of-interest-for-the-6th-grmf-application-round\/","url_meta":{"origin":9903,"position":3},"title":"East African Countries Submit 17 Expressions of Interest for the 6th GRMF Application Round","author":"","date":"September 2, 2020","format":false,"excerpt":"The AUC has acknowledged that on 29 July 2020 seventeen (17) Expressions of Interest (EoI)\u00a0for the Geothermal Risk Mitigation Facility\u2019s 6th Application Round were received on time and were accepted for bid opening, which took place on 3rd August 2020. According to the AUC the seventeen EoI consisted of ten\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/09\/Geothermal-OW-923.png?fit=631%2C344&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/09\/Geothermal-OW-923.png?fit=631%2C344&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/09\/Geothermal-OW-923.png?fit=631%2C344&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":12610,"url":"https:\/\/www.oilnewskenya.com\/index.php\/toshiba-ess-kengen-conclude-mou-on-om-services-for-geothermal-power-plants\/","url_meta":{"origin":9903,"position":4},"title":"Toshiba ESS, KenGen Conclude MoU on O&#038;M Services for Geothermal Power Plants","author":"","date":"September 1, 2022","format":false,"excerpt":"Kenya Electricity Generating Company\u00a0 (KenGen) and Toshiba Energy Systems & Solutions Corporation (Toshiba ESS) concluded a memorandum of understanding (MOU). The MOU anticipates a partnership of Operation and Maintenance (O&M) services for geothermal power plants in developing countries including \u00a0East African countries through a combination of KenGen and Toshiba ESS\u2019s\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/07\/KenGen-Olkaria-VI.jpg?fit=1200%2C801&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/07\/KenGen-Olkaria-VI.jpg?fit=1200%2C801&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/07\/KenGen-Olkaria-VI.jpg?fit=1200%2C801&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/07\/KenGen-Olkaria-VI.jpg?fit=1200%2C801&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/07\/KenGen-Olkaria-VI.jpg?fit=1200%2C801&ssl=1&resize=1050%2C600 3x"},"classes":[]},{"id":5720,"url":"https:\/\/www.oilnewskenya.com\/index.php\/kengen-awards-mitsubishi-corporation-contract-to-construct-olkaria-v-geothermal-plant\/","url_meta":{"origin":9903,"position":5},"title":"KenGen Awards Mitsubishi Corporation Contract to Construct Olkaria V Geothermal Plant","author":"","date":"February 28, 2017","format":false,"excerpt":"Mitsubishi Corporation (MC), together with Mitsubishi Hitachi Power Systems Ltd. (MHPS) and H Young & Co. (E.A.) Ltd. (HY), has been awarded a full turnkey contract by Kenya Electricity Generating Company Ltd. for the construction of a geothermal power plant (Olkaria V) in Kenya. The installment will be the fifth\u2026","rel":"","context":"In &quot;Geothermal&quot;","block_context":{"text":"Geothermal","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/renewables-2\/geothermal\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/08\/olkaria-plant-4.png?fit=505%2C320&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]}],"jetpack_sharing_enabled":true,"jetpack_likes_enabled":true,"_links":{"self":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/9903","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/comments?post=9903"}],"version-history":[{"count":1,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/9903\/revisions"}],"predecessor-version":[{"id":9905,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/9903\/revisions\/9905"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media\/9904"}],"wp:attachment":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media?parent=9903"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/categories?post=9903"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/tags?post=9903"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}