{"id":9646,"date":"2021-01-06T07:50:19","date_gmt":"2021-01-06T07:50:19","guid":{"rendered":"https:\/\/oilnewskenya.com\/?p=9646"},"modified":"2021-01-06T07:50:19","modified_gmt":"2021-01-06T07:50:19","slug":"ethiopia-siemens-gamesa-inks-first-wind-farm-project-in-assela","status":"publish","type":"post","link":"https:\/\/www.oilnewskenya.com\/index.php\/ethiopia-siemens-gamesa-inks-first-wind-farm-project-in-assela\/","title":{"rendered":"ETHIOPIA: Siemens Gamesa Inks First Wind Farm Project in Assela"},"content":{"rendered":"<p>Siemens Gamesa has signed its first wind power project in Ethiopia with state-owned electricity company Ethiopian Electric Power (EEP),strengthening its leadership in Africa as the country begins to expand its green energy capacity to meet ambitious renewable targets.<\/p>\n<p>The 100MW Assela wind farm will be located between the towns of Adama and Assela, approximately 150 km south of the capital, Addis Ababa, and will contributetoclean and affordable powerfor the country\u2019s electricity grid.<\/p>\n<p>The country has set an ambitious target to supply 100% of its domestic energy demand through renewable energy by 2030. According to the African Development Bank, Ethiopia has abundant resources, particularly wind with a potential 10GWof installation capacity andhaving installed 324MW at present.<\/p>\n<p>\u201cSiemens Gamesa is intent on expanding its leadership across Africa, and in turn help a growing transition to green energy across the continent. So, we are extremely pleased to begin work in Ethiopia and look forward to collaborating with both EEP and the country to continue to promote their drive to install more renewables and meet transformational energy targets,\u201d said Roberto Sabalza, CEO for Onshore Southern Europe and Africa at Siemens Gamesa.<\/p>\n<p>According to a Wood Mackenzie forecast, around 2GW of wind power would be installed in Ethiopia by 2029.<\/p>\n<p>The wind farm will be made up of 29 SG3.4-132 wind turbines and is expected to be commissioned by the start of 2023.The project will generate about 300,000 MWh per year. Siemens Gamesa will provide full engineering, procurement, and turnkey construction.<\/p>\n<p>The Assela wind project will be financed by the Danish Ministry of Foreign Affairs via Danida Business Finance (DBF) adding to a loan agreementsigned between the Ethiopian Ministry of Finance and Economic Cooperation (MoFEC) and Danske Bank A\/S.<\/p>\n<p>Ethiopia has many renewable resources covering wind, solar, geothermal, and biomass, and the country aspires to be a power hub and the battery for the Horn of Africa. The country\u2019s National Electrification Program, launched in 2017, outlines a plan to reach universal access by 2025 with the help of off-grid solutions for 35% of the population.<\/p>\n<p>Siemens Gamesa is among the global leaders in the wind power industry, with a strong presence in all facets of the renewable energy business: offshore, onshore, and services. With more than 107GW installed worldwide; Siemens Gamesa is an ideal partner for Ethiopia at this critical juncture in the East African nation\u2019s accelerating energy journey.<\/p>\n<p>*The order was signed in Q1 of fiscal year 2021.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Siemens Gamesa has signed its first wind power project in Ethiopia with state-owned electricity company Ethiopian Electric Power (EEP),strengthening its leadership in Africa as the country begins to expand its &hellip; <a href=\"https:\/\/www.oilnewskenya.com\/index.php\/ethiopia-siemens-gamesa-inks-first-wind-farm-project-in-assela\/\" class=\"more-link\">Read More<\/a><\/p>\n","protected":false},"author":24,"featured_media":9647,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[7442,7443,4746,4749],"tags":[8841,8842,8846,8843,8845,4793,8844,8840],"class_list":["post-9646","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-countries","category-eastern-africa","category-renewables-2","category-wind","tag-adama","tag-assela","tag-assela-wind-farm","tag-danida-business-finance","tag-danske-bank-a-s","tag-ethiopian-electric-power","tag-ethiopian-ministry-of-finance-and-economic-cooperation","tag-siemens-gamesa","entry"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/01\/siemens-gamesa-SG-34132.jpg?fit=1440%2C720&ssl=1","jetpack_shortlink":"https:\/\/wp.me\/p5JWkQ-2vA","jetpack-related-posts":[{"id":11275,"url":"https:\/\/www.oilnewskenya.com\/index.php\/egyptsiemens-gamesa-delivers-250-mw-of-energy-at-the-west-bakr-wind-farm\/","url_meta":{"origin":9646,"position":0},"title":"EGYPT:Siemens Gamesa Delivers 250 MW of Energy at the West Bakr Wind farm","author":"","date":"December 2, 2021","format":false,"excerpt":"Erection and commissioning of 96 SG 2.6-114 wind turbines in less than 10 months; Long term maintenance provided through a 15-year service agreement; Generation of 1,000 GWh per year increasing Egypt\u2019s installed wind energy capacity by 18%; First renewable energy project in Egypt to be energized through a 220kV Gas\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/12\/EGYPT-WIND-FARM-scaled.jpg?fit=1200%2C800&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/12\/EGYPT-WIND-FARM-scaled.jpg?fit=1200%2C800&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/12\/EGYPT-WIND-FARM-scaled.jpg?fit=1200%2C800&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/12\/EGYPT-WIND-FARM-scaled.jpg?fit=1200%2C800&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/12\/EGYPT-WIND-FARM-scaled.jpg?fit=1200%2C800&ssl=1&resize=1050%2C600 3x"},"classes":[]},{"id":4951,"url":"https:\/\/www.oilnewskenya.com\/index.php\/toshiba-concludes-mou-with-ethiopian-electric-power-on-geothermal-power-generation\/","url_meta":{"origin":9646,"position":1},"title":"Toshiba concludes MoU with Ethiopian Electric Power on geothermal power generation","author":"","date":"September 29, 2014","format":false,"excerpt":"Toshiba Corporation has announced that the company has concluded a memorandum of understanding (MOU) with Ethiopian Electric Power on a comprehensive partnership in geothermal power that will see the parties collaborate in power generation projects and personnel development. Ethiopian Electric Power (EEP), a publicly owned utility, engages in the development\u2026","rel":"","context":"In &quot;Geothermal&quot;","block_context":{"text":"Geothermal","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/renewables-2\/geothermal\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/08\/Toshiba-EEP_MOU.png?fit=519%2C332&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":12230,"url":"https:\/\/www.oilnewskenya.com\/index.php\/ethiopia-kengen-completes-drilling-the-seventh-geothermal-well-at-the-aluto-langano-geothermal-field\/","url_meta":{"origin":9646,"position":2},"title":"ETHIOPIA: KenGen Completes Drilling the Seventh Geothermal Well at the Aluto-Langano Geothermal field","author":"","date":"April 30, 2022","format":false,"excerpt":"Kenya Electricity Generating Company PLC (KenGen) has completed drilling of the seventh geothermal well in Ethiopia further bolstering the company\u2019s renewable energy footprint in the Horn of Africa. This latest announcement is from the Aluto-Langano geothermal site where KenGen is implementing a drilling consultancy project for the state-owned Ethiopian Electric\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/09\/Geothermal-OW-923.png?fit=631%2C344&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/09\/Geothermal-OW-923.png?fit=631%2C344&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/09\/Geothermal-OW-923.png?fit=631%2C344&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":5010,"url":"https:\/\/www.oilnewskenya.com\/index.php\/work-starts-on-kinangop-wind-farm-in-kenya\/","url_meta":{"origin":9646,"position":3},"title":"Work starts on Kinangop Wind Farm in Kenya","author":"","date":"May 14, 2014","format":false,"excerpt":"By Zak Mwangi Aurecon has been appointed as owner\u2019s engineer by the project company, Kinangop Wind Park Ltd (KWP), for the construction phase of the 60.8 megawatt wind farm in Kenya\u2019s Kinangop region.\u00a0 This project has African Infrastructure Investment Managers (AIIM) as the majority owner. The project has reached Financial\u2026","rel":"","context":"In &quot;Wind&quot;","block_context":{"text":"Wind","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/renewables-2\/wind\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/08\/kinangop-wind.jpg?fit=850%2C610&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/08\/kinangop-wind.jpg?fit=850%2C610&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/08\/kinangop-wind.jpg?fit=850%2C610&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/08\/kinangop-wind.jpg?fit=850%2C610&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":11131,"url":"https:\/\/www.oilnewskenya.com\/index.php\/ethiopia-kengen-completes-eeps-deepest-geothermal-well\/","url_meta":{"origin":9646,"position":4},"title":"Ethiopia KenGen Completes EEP&#8217;s Deepest Geothermal Well","author":"","date":"November 12, 2021","format":false,"excerpt":"Kenya Electricity Generating Company (KenGen) has announced the completion of a 3,000-meter geothermal well in Ethiopia, which exceeded the target of 2,750 meters. This is the second of eight wells it has been commissioned to drill by Ethiopian Electric Power Company (EEP) the state-owned electricity producer as Ethiopia seeks to\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/11\/KenGen-drilling-Aluto-Langano.jpeg?fit=800%2C599&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/11\/KenGen-drilling-Aluto-Langano.jpeg?fit=800%2C599&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/11\/KenGen-drilling-Aluto-Langano.jpeg?fit=800%2C599&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/11\/KenGen-drilling-Aluto-Langano.jpeg?fit=800%2C599&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":5943,"url":"https:\/\/www.oilnewskenya.com\/index.php\/ge-addis-ababa-institute-of-technology-sign-a-mou-to-enable-renewables-generation-skills-development-in-ethiopia\/","url_meta":{"origin":9646,"position":5},"title":"GE, Addis Ababa Institute of Technology Sign a MoU to enable Renewables Generation, Skills Development in Ethiopia","author":"","date":"May 15, 2017","format":false,"excerpt":"GE and Addis Ababa Institute of Technology have signed a MoU to enable Renewables Hydro\/Wind Power Generation Skills Development in Ethiopia. The ultimate vision of the collaboration between GE and AAIT is to develop a Renewables - Center of Excellence at AAIT to serve as a practical learning hub for\u2026","rel":"","context":"In &quot;Renewables 2&quot;","block_context":{"text":"Renewables 2","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/renewables-2\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2017\/05\/e307e645e4e88ddb824b7b1730b036c6.jpg?fit=800%2C534&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2017\/05\/e307e645e4e88ddb824b7b1730b036c6.jpg?fit=800%2C534&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2017\/05\/e307e645e4e88ddb824b7b1730b036c6.jpg?fit=800%2C534&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2017\/05\/e307e645e4e88ddb824b7b1730b036c6.jpg?fit=800%2C534&ssl=1&resize=700%2C400 2x"},"classes":[]}],"jetpack_sharing_enabled":true,"jetpack_likes_enabled":true,"_links":{"self":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/9646","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/comments?post=9646"}],"version-history":[{"count":1,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/9646\/revisions"}],"predecessor-version":[{"id":9648,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/9646\/revisions\/9648"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media\/9647"}],"wp:attachment":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media?parent=9646"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/categories?post=9646"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/tags?post=9646"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}