{"id":8928,"date":"2020-08-20T10:41:13","date_gmt":"2020-08-20T10:41:13","guid":{"rendered":"http:\/\/oilnewskenya.com\/?p=8928"},"modified":"2020-08-20T20:07:21","modified_gmt":"2020-08-20T20:07:21","slug":"egypt-wepco-opens-the-el-hamra-shamandoura-crude-oil-pipeline","status":"publish","type":"post","link":"https:\/\/www.oilnewskenya.com\/index.php\/egypt-wepco-opens-the-el-hamra-shamandoura-crude-oil-pipeline\/","title":{"rendered":"EGYPT: WEPCO Opens the El-Hamra-Shamandoura Crude Oil Pipeline"},"content":{"rendered":"<div>\n<p>Egypt has opened the eight-kilometre El-Hamra-Shamandoura crude oil pipeline a key route for developing the capabilities of the El-Hamra Petroleum Port on the Mediterranean Sea.<\/p>\n<p>The eight-kilometre El-Hamra-Shamandoura crude oil pipeline which was inaugurated by Egyptian Prime Minister, Mostafa Madbouly was built at a cost of $100 million and is expected to increase the El-Hamra Petroleum Port&#8217;s shipping capacity\u00a0 to 1 million barrels of crude oil per day (bpd).<\/p>\n<p>A statement by the cabinet further says crude storage at El-Hamra has been increased by by 250,000 barrels to a total of 1.5 million barrels to accomodate crude oil from companies operating fields in the Western Desert.<\/p>\n<p>The El-Hamra terminal established in 1968 along the Mediterranean coast handles all west desert crude oil production which represents about 50% of the country&#8217;s crude oil production.\u00a0All Western Desert production is transported to ElHamra Terminal thru three main pipelines where these pipelines are automatically controlled and well monitored by metering stations. All received quantities are shipped to Refineries thru ElHamra\/Karir pipeline 20 inche diameter and to export tankers thru marine loading facilities.<\/p>\n<p>El-Hamra Petroleum Port, located in New Alamein City, is operated by Western Desert Operating Petroleum Company (WEPCO).<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Egypt has opened the eight-kilometre El-Hamra-Shamandoura crude oil pipeline a key route for developing the capabilities of the El-Hamra Petroleum Port on the Mediterranean Sea. The eight-kilometre El-Hamra-Shamandoura crude oil &hellip; <a href=\"https:\/\/www.oilnewskenya.com\/index.php\/egypt-wepco-opens-the-el-hamra-shamandoura-crude-oil-pipeline\/\" class=\"more-link\">Read More<\/a><\/p>\n","protected":false},"author":24,"featured_media":8930,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[7442,7446,11],"tags":[709,8263,8264,2042,8262,7610,8261],"class_list":["post-8928","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-countries","category-north-africa","category-top-news","tag-egypt","tag-el-hamra-petroleum-port","tag-el-hamra-shamandoura-crude-oil-pipeline","tag-pipeline","tag-wepco","tag-western-desert","tag-western-desert-operating-petroleum-company","entry"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/08\/Pipelines.jpg?fit=1920%2C1080&ssl=1","jetpack_shortlink":"https:\/\/wp.me\/p5JWkQ-2k0","jetpack-related-posts":[{"id":2931,"url":"https:\/\/www.oilnewskenya.com\/index.php\/search-east-africas-crude-oil-pipeline-builder-start-6-months\/","url_meta":{"origin":8928,"position":0},"title":"Search for East Africa\u2019s Crude Oil Pipeline Builder to start in 6 Months","author":"","date":"May 18, 2015","format":false,"excerpt":"The search for the builder for the 1300km pipeline running from Uganda\u2019s Hoima region through Lokichar in Turkana all the way to the Kenyan coast will commence in six months according to Ministry of Energy and Petroleum principal secretary Joseph Njoroge. This follows the completion of the feasibility studies by\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"Crude Oil Pipeline Map","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/05\/Crude-Oil-Pipeline-Map.png?resize=350%2C200","width":350,"height":200},"classes":[]},{"id":2922,"url":"https:\/\/www.oilnewskenya.com\/index.php\/kenya-oil-gas-upstream-sector-fact-file-shortened\/","url_meta":{"origin":8928,"position":1},"title":"Kenya Oil and Gas (upstream) sector fact file &#8211; shortened","author":"","date":"May 15, 2015","format":false,"excerpt":"Source: Ministry of Energy and Petroleum 1950-1992: \u00a030 wells drilled by international oil companies in Kenya\u2019s sedimentary basins. Two more wells drilled in the period stretching to 2010. None of them was a discovery. Basically 1992 to 2005 was a dormant period that saw zero wells drilled. 2012: Ngamia 1\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/04\/human-rights.jpg?fit=668%2C444&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/04\/human-rights.jpg?fit=668%2C444&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/04\/human-rights.jpg?fit=668%2C444&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":5324,"url":"https:\/\/www.oilnewskenya.com\/index.php\/oped-early-oil-pilot-scheme-eopsan-enabler-not-a-replacement-for-the-full-field-development\/","url_meta":{"origin":8928,"position":2},"title":"OpEd: Early Oil Pilot scheme (EOPS)an enabler, not a replacement for the Full Field Development","author":"","date":"October 21, 2016","format":false,"excerpt":"by Andrew Kamau, PS Department of Petroleum; Ministry of Energy & Petroleum The last four years have been the most remarkable period in Kenya\u2019s Oil and Gas industry since exploration began in the country in the early forties.\u00a0 During this period, over 45 Oil and Gas exploration wells have been\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/10\/IMG_5326.jpg?fit=1200%2C800&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/10\/IMG_5326.jpg?fit=1200%2C800&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/10\/IMG_5326.jpg?fit=1200%2C800&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/10\/IMG_5326.jpg?fit=1200%2C800&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/10\/IMG_5326.jpg?fit=1200%2C800&ssl=1&resize=1050%2C600 3x"},"classes":[]},{"id":6702,"url":"https:\/\/www.oilnewskenya.com\/index.php\/kenya-starts-search-design-contractor-2-billion-crude-oil-pipeline\/","url_meta":{"origin":8928,"position":3},"title":"Kenya starts Search for Design Contractor for its $2 billion Crude Oil Pipeline","author":"","date":"January 18, 2018","format":false,"excerpt":"The Ministry of Energy and Petroleum has invited eight bids from firms hoping to undertake the Front End Engineering Design (FEED) for the planned 892 kilometer crude oil pipeline between South Lokichar oil fields in Turkana and Lamu port. According to principal secretary in charge of the state department on\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/10\/Kenya-Uganda-pipeline-design-1.jpg?fit=900%2C610&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/10\/Kenya-Uganda-pipeline-design-1.jpg?fit=900%2C610&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/10\/Kenya-Uganda-pipeline-design-1.jpg?fit=900%2C610&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/10\/Kenya-Uganda-pipeline-design-1.jpg?fit=900%2C610&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":6452,"url":"https:\/\/www.oilnewskenya.com\/index.php\/kenya-joint-venture-partners-sign-joint-development-study-agreement-crude-oil-pipeline\/","url_meta":{"origin":8928,"position":4},"title":"Kenya Joint Venture Partners Sign the Joint Development Study Agreement for the Crude Oil Pipeline","author":"","date":"October 24, 2017","format":false,"excerpt":"The Lokichar-Lamu crude oil pipeline today took a significant step forward following the signing of a Joint Development Study Agreement (JDA) between the Government of Kenya and Tullow Oil, Africa Oil and Maersk Oil (KJV Partners), to carry out a study for\u00a0the proposed 820 km crude oil pipeline. The joint\u00a0development\u00a0\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2017\/10\/Energy-CS-Charles-Keter-right-signing-the-Joint-Development-Study-Agreement-JDA-for-the-proposed-Lokichar-Lamu-crude-oil-pipeline.-Left-Martin-Mbogo-Country-Manager-Tullow-Oil.jpg?fit=844%2C680&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2017\/10\/Energy-CS-Charles-Keter-right-signing-the-Joint-Development-Study-Agreement-JDA-for-the-proposed-Lokichar-Lamu-crude-oil-pipeline.-Left-Martin-Mbogo-Country-Manager-Tullow-Oil.jpg?fit=844%2C680&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2017\/10\/Energy-CS-Charles-Keter-right-signing-the-Joint-Development-Study-Agreement-JDA-for-the-proposed-Lokichar-Lamu-crude-oil-pipeline.-Left-Martin-Mbogo-Country-Manager-Tullow-Oil.jpg?fit=844%2C680&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2017\/10\/Energy-CS-Charles-Keter-right-signing-the-Joint-Development-Study-Agreement-JDA-for-the-proposed-Lokichar-Lamu-crude-oil-pipeline.-Left-Martin-Mbogo-Country-Manager-Tullow-Oil.jpg?fit=844%2C680&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":477,"url":"https:\/\/www.oilnewskenya.com\/index.php\/kenya-government-to-invite-bids-for-sh255-billion-crude-oil-pipeline\/","url_meta":{"origin":8928,"position":5},"title":"Kenya Government to Invite Bids for Sh255 Billion Crude Oil Pipeline","author":"Samuel Kamau Mbote","date":"February 9, 2014","format":false,"excerpt":"Kenya is set to invite international bids for the design and\u00a0construction\u00a0of a\u00a0crude oil\u00a0pipeline linking the oil fields in Turkana and the Port of Lamu. In the first\u00a0acknowledgement\u00a0by a government official, Energy Secretary Davis Chirchir said the country\u2019s oil resources have attained commercial thresholds and that it was time the country\u2026","rel":"","context":"In &quot;News by others&quot;","block_context":{"text":"News by others","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/news-by-others\/"},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]}],"jetpack_sharing_enabled":true,"jetpack_likes_enabled":true,"_links":{"self":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/8928","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/comments?post=8928"}],"version-history":[{"count":1,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/8928\/revisions"}],"predecessor-version":[{"id":8931,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/8928\/revisions\/8931"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media\/8930"}],"wp:attachment":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media?parent=8928"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/categories?post=8928"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/tags?post=8928"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}