{"id":8457,"date":"2020-06-30T07:59:17","date_gmt":"2020-06-30T07:59:17","guid":{"rendered":"http:\/\/oilnewskenya.com\/?p=8457"},"modified":"2020-06-30T07:59:17","modified_gmt":"2020-06-30T07:59:17","slug":"suriname-maersk-drilling-secures-contract-for-semi-submersible-rig-maersk-developer","status":"publish","type":"post","link":"https:\/\/www.oilnewskenya.com\/index.php\/suriname-maersk-drilling-secures-contract-for-semi-submersible-rig-maersk-developer\/","title":{"rendered":"SURINAME: Maersk Drilling Secures Contract for Semi-submersible Rig M\u00e6rsk Developer"},"content":{"rendered":"<p>Maersk Drilling has secured a contract for the semi-submersible rig M\u00e6rsk Developer which will be employed by PETRONAS Suriname Exploration &amp; Production for a one-well exploration campaign in Block 52 offshore Suriname. The contract is expected to commence in Q3\/Q4 2020, with an estimated duration of 75 days. The value of the firm contract is approx. USD 20.4m, including integrated drilling services, mobilisation and demobilisation fees. The contract includes an additional one-well option.<\/p>\n<p><em>&#8216;It is great to work for PETRONAS again with a quick reactivation of M\u00e6rsk Developer for this campaign in the exciting Suriname-Guyana basin. This will showcase our ability to smoothly and efficiently establish operations in new jurisdictions, as M\u00e6rsk Developer will become the first of our rigs to operate offshore Suriname,&#8217;\u00a0<\/em>says COO Morten Kelstrup of Maersk Drilling.<\/p>\n<p>The <em>M\u00e6rsk Developer<\/em>\u00a0is a DSS-21 column-stabilised dynamically positioned semi-submersible rig, able to operate in water depths up to 10,000ft.\u00a0It is currently warm-stacked in Aruba after ending its latest contract offshore Trinidad and Tobago.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Maersk Drilling has secured a contract for the semi-submersible rig M\u00e6rsk Developer which will be employed by PETRONAS Suriname Exploration &amp; Production for a one-well exploration campaign in Block 52 &hellip; <a href=\"https:\/\/www.oilnewskenya.com\/index.php\/suriname-maersk-drilling-secures-contract-for-semi-submersible-rig-maersk-developer\/\" class=\"more-link\">Read More<\/a><\/p>\n","protected":false},"author":24,"featured_media":8458,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[7442,7444],"tags":[7704,1477,7702,7705,2024,7703],"class_list":["post-8457","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-countries","category-west-africa","tag-drilling-services","tag-maersk-drilling","tag-maersk-developer","tag-mobilisation","tag-petronas","tag-suriname-exploration-production","entry"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/06\/Maersk-Developer.jpg?fit=750%2C499&ssl=1","jetpack_shortlink":"https:\/\/wp.me\/p5JWkQ-2cp","jetpack-related-posts":[{"id":11010,"url":"https:\/\/www.oilnewskenya.com\/index.php\/angola-maersk-drilling-awarded-contract-extension-to-drill-world-record-well\/","url_meta":{"origin":8457,"position":0},"title":"ANGOLA: Maersk Drilling Awarded Contract Extension to Drill World Record Well","author":"","date":"October 18, 2021","format":false,"excerpt":"TotalEnergies E&P Angola has exercised an option for the 7th\u00a0generation drillship Maersk Voyager to drill the ultra-deepwater Ondjaba-1 exploration well in Angola\u2019s Block 48. The contract extension has an estimated duration of 54 days, which means that Maersk Voyager is now contracted until February 2022. The work on Ondjaba-1 commenced\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/10\/Maersk-Voyager.jpg?fit=1000%2C750&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/10\/Maersk-Voyager.jpg?fit=1000%2C750&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/10\/Maersk-Voyager.jpg?fit=1000%2C750&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/10\/Maersk-Voyager.jpg?fit=1000%2C750&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":9826,"url":"https:\/\/www.oilnewskenya.com\/index.php\/ghana-tullow-oil-awards-maersk-drilling-campaign-at-the-ten-and-jubilee-fields\/","url_meta":{"origin":8457,"position":1},"title":"GHANA: Tullow Oil Awards Maersk Drilling Campaign at the TEN and Jubilee fields","author":"","date":"February 4, 2021","format":false,"excerpt":"Maersk Drilling has received a conditional letter of award from Tullow Ghana Ltd.\u00a0 for the provision of the ultra-deepwater drillship Maersk Venturer and additional services for a development drilling campaign at the TEN and Jubilee fields offshore Ghana. The duration of the final contract is around four years with expected\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/02\/Maersk-Venturer.jpg?fit=979%2C539&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/02\/Maersk-Venturer.jpg?fit=979%2C539&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/02\/Maersk-Venturer.jpg?fit=979%2C539&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/02\/Maersk-Venturer.jpg?fit=979%2C539&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":1830,"url":"https:\/\/www.oilnewskenya.com\/index.php\/maersk-drilling-unveils-fourth-ultra-deepwater-drillship\/","url_meta":{"origin":8457,"position":2},"title":"Maersk Drilling unveils fourth ultra deepwater drillship","author":"Samuel Kamau Mbote","date":"September 26, 2014","format":false,"excerpt":"[twitter-follow screen_name='oilnewskenya'] Maersk Drilling\u2019s fourth ultra deepwater drillship was named yesterday\u00a0morning in a ceremony held at the Samsung Heavy Industries (SHI) shipyard in Geoje-Si, South Korea. Lene Berg, wife of Gregers Kudsk, Vice President in Maersk Drilling, had the honour of naming the drillship Maersk Voyager. Maersk Voyager is the\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/09\/maersk.png?fit=686%2C453&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/09\/maersk.png?fit=686%2C453&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/09\/maersk.png?fit=686%2C453&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":12292,"url":"https:\/\/www.oilnewskenya.com\/index.php\/angola-maersk-supply-service-wins-long-term-marine-services-contract\/","url_meta":{"origin":8457,"position":3},"title":"ANGOLA: Maersk Supply Service Wins Long-term Marine Services Contract","author":"","date":"May 26, 2022","format":false,"excerpt":"Maersk Supply Service has been awarded an integrated marine services contract by Esso Angola, for the provision of project management, engineering and marine services in support of the development of offshore drilling and production operations\u00a0offshore Angola in the Block 15. Maersk Forza, a Maersk Supply Service subsea support vessel, will\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/05\/Maersk-Supply-Line.jpg?fit=1200%2C675&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/05\/Maersk-Supply-Line.jpg?fit=1200%2C675&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/05\/Maersk-Supply-Line.jpg?fit=1200%2C675&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/05\/Maersk-Supply-Line.jpg?fit=1200%2C675&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/05\/Maersk-Supply-Line.jpg?fit=1200%2C675&ssl=1&resize=1050%2C600 3x"},"classes":[]},{"id":2579,"url":"https:\/\/www.oilnewskenya.com\/index.php\/maersk-training-offer-advanced-training-programs-bp-drilling-teams\/","url_meta":{"origin":8457,"position":4},"title":"Maersk Training to offer advanced training programs to BP drilling teams","author":"","date":"February 20, 2015","format":false,"excerpt":"BP will offer advanced training programs for its offshore drilling teams under a new global agreement with Maersk Training, further underscoring BP\u2019s commitment to safe and reliable operations. By 2016, Maersk Training, which currently is working with BP on training in Europe, plans to open a new state-of-the-art facility in\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/02\/BP-Simulator1.jpg?fit=700%2C335&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/02\/BP-Simulator1.jpg?fit=700%2C335&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/02\/BP-Simulator1.jpg?fit=700%2C335&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/02\/BP-Simulator1.jpg?fit=700%2C335&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":5049,"url":"https:\/\/www.oilnewskenya.com\/index.php\/africa-oil-has-spent-kshs-2-25-billion-in-exploration-development-expenses-in-kenyas-in-2016\/","url_meta":{"origin":8457,"position":5},"title":"Africa Oil Has Spent Kshs.2.25 Billion in Exploration, Development Expenses in Kenya in 2016","author":"","date":"August 15, 2016","format":false,"excerpt":"The Company incurred (Kshs2.25 billion) $22.5 million \u00a0of intangible exploration expenditures in Kenya for the six months ended June 30, 2016 according to the latest half year results by the company. Drilling and completion expenditures primarily relate to the Cheptuket-1 exploration well in Block 12A and costs associated with demobilizing\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2013\/12\/africaoil.png?fit=280%2C273&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]}],"jetpack_sharing_enabled":true,"jetpack_likes_enabled":true,"_links":{"self":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/8457","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/comments?post=8457"}],"version-history":[{"count":1,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/8457\/revisions"}],"predecessor-version":[{"id":8459,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/8457\/revisions\/8459"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media\/8458"}],"wp:attachment":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media?parent=8457"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/categories?post=8457"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/tags?post=8457"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}