{"id":8400,"date":"2020-06-23T10:47:50","date_gmt":"2020-06-23T10:47:50","guid":{"rendered":"http:\/\/oilnewskenya.com\/?p=8400"},"modified":"2020-06-23T10:47:50","modified_gmt":"2020-06-23T10:47:50","slug":"egypt-morocco-post-drilling-extension-of-plateau-production-at-south-disouq-and-de-risked-prospectivity-in-both-egypt-and-morocco","status":"publish","type":"post","link":"https:\/\/www.oilnewskenya.com\/index.php\/egypt-morocco-post-drilling-extension-of-plateau-production-at-south-disouq-and-de-risked-prospectivity-in-both-egypt-and-morocco\/","title":{"rendered":"EGYPT\/ MOROCCO: Post-drilling Extension of Plateau Production at South Disouq and De-risked Prospectivity in both Egypt and Morocco"},"content":{"rendered":"<p class=\"ed\"><strong><span class=\"eg\">Egypt<\/span><\/strong><\/p>\n<p class=\"eh\"><span class=\"ei\">\u00b7\u00a0\u00a0\u00a0\u00a0<\/span><span class=\"ef\">As a result of the Sobhi discovery in South Disouq (SDX Working Interest: 55% and operator), which SDX drilled at 100% Working Interest, gross plateau production of c.50 MMscfe\/d is now expected to be maintained for a further 18-24 months until mid-2023 with the potential for a further extension to mid-2026 depending on the results of planned future exploration drilling.<\/span><\/p>\n<p class=\"eh\"><span class=\"dh\">\u00b7\u00a0\u00a0\u00a0\u00a0<\/span><span class=\"ef\">Management estimates that\u00a0<\/span><span class=\"dk\">Sobhi<sup>1<\/sup>\u00a0will generate approximately\u00a0US$25.0 million\u00a0of undiscounted post-tax cash flow after capex to SDX, equivalent to\u00a0US$1.04\/Mcf.<\/span><\/p>\n<p class=\"eh\"><span class=\"ei\">\u00b7\u00a0\u00a0\u00a0\u00a0<\/span><span class=\"ef\">After integrating the results of the successful Sobhi well with the remapped 3D seismic over the South Disouq concession, management estimates that incremental prospective resources of c.100 bcf have been identified and de-risked across five prospects. Approximately 25% of this incremental prospectivity has been identified in a new Buried Hill play concept which is productive in a neighbouring field 10 km to the east. Management estimates that these follow on prospects are expected to have similar costs and post-tax cash flow profiles to Sobhi.<\/span><\/p>\n<p class=\"eh\"><span class=\"ei\">\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0<\/span><span class=\"ef\">8 to 10 wells are planned in the West Gharib (SDX Working Interest: 50%) concession between 2021 and 2023 for a gross cost of approximately\u00a0US$8.0-10.0 million\u00a0(SDX:\u00a0US$4.0-5.0 million) with the potential to increase gross production from c.3,200 &#8211; 3,300 bbl\/d to c.4,000 bbl\/d by 2022.<\/span><\/p>\n<p class=\"eh\"><span class=\"dh\">\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0<\/span><span class=\"dm\">After taking account of drilling and other infrastructure tie-in capex, this incremental production at West Gharib is expected to generate approximately\u00a0US$5.0-6.0 million\u00a0in low-risk, undiscounted post-tax cash flow net to SDX.<\/span><\/p>\n<p class=\"ed\"><span class=\"ej\">Note 1 &#8211; Sobhi is expected to commence production in Q1 2021 after completion of the standard Environmental Impact Assessment process, agreement of landowners&#8217; compensation, obtaining the necessary Military, Agricultural and Irrigation permits and completion of the pipeline tie-in.<\/span><\/p>\n<p class=\"ed\"><strong><span class=\"ek\">\u00a0<\/span><span class=\"eg\">Morocco<\/span><\/strong><\/p>\n<p class=\"eh\"><span class=\"ei\">\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0<\/span><span class=\"ef\">Post-drill analysis of the LMS-2 well at Lalla Mimouna (SDX Working Interest: 75% and operator) has identified similarities with the LAM-1 discovery made by the previous operator of the concession which flowed gas and condensate in 2015.<\/span><\/p>\n<p class=\"el\"><span class=\"em\">o\u00a0\u00a0<\/span><span class=\"ef\">Subject to successful testing, management estimates that LMS-2 could contain c.1.5 bcf and has the potential to de-risk a further 6.0 bcf in separate compartments within the same feature.<\/span><\/p>\n<p class=\"el\"><span class=\"em\">o\u00a0\u00a0<\/span><span class=\"ef\">Management also estimates that a further 3.4 bcf of close by prospective resources will be de-risked if LMS-2 tests successfully, increasing the overall prospective resource potential to 10.9 bcf.<\/span><\/p>\n<p class=\"el\"><span class=\"em\">o\u00a0\u00a0<\/span><span class=\"ef\">LMS-2 will be tested after the COVID-19 restrictions in\u00a0Morocco\u00a0enable perforation and testing crews to re-enter the country. The Company hopes that this will be late Q3\/early Q4 2020.<\/span><\/p>\n<p class=\"eh\"><span class=\"ei\">\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0<\/span><span class=\"ef\">In addition to the 10.9bcf of prospective resources that could be de-risked by LMS-2, management has identified a further 25.5 bcf of prospective resources in multiple prospects across the concession.<\/span><span class=\"db\">\u00a0<\/span><\/p>\n<p class=\"eo\"><span class=\"cz\">Mark Reid, CEO of SDX, commented: <\/span><span class=\"cx\">&#8220;After analysing the results of the recent drilling successes in\u00a0Egypt\u00a0and\u00a0Morocco, we are very excited about the future prospectivity identified from the Sobhi well in\u00a0Egypt\u00a0and from LMS-2 in\u00a0Morocco.<\/span><\/p>\n<p class=\"ep\"><span class=\"cx\">With Sobhi, we expect to extend our gross 50 MMscfe\/d plateau production by 18-24 months to 2023 and, with some follow on drilling success, this could be extended further into 2026. Sobhi has also helped us identify approximately 100 bcf of follow on, de-risked, incremental prospectivity in the South Disouq concession.<\/span><\/p>\n<p class=\"ep\"><span class=\"cx\">In\u00a0Morocco, a successful test in LMS-2 could create 1.5 bcf of 2P reserves and simultaneously de-risk 6.0 bcf of prospectivity in the same structure and a further 3.4 bcf nearby, enabling us then to investigate low cost, early monetisation options. In addition, a successful LMS-2 test will help us better understand an additional 25.5 bcf of prospectivity in multiple prospects identified across the broader Lalla Mimouna concession.<\/span><\/p>\n<p class=\"ep\"><span class=\"cx\">Finally, we are also looking forward to commencing our drilling campaign in West Gharib next year where we will be aiming to increase production in the Meseda and Rabul fields to approximately gross 4,000 bbls\/d by 2022.&#8221;<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Egypt \u00b7\u00a0\u00a0\u00a0\u00a0As a result of the Sobhi discovery in South Disouq (SDX Working Interest: 55% and operator), which SDX drilled at 100% Working Interest, gross plateau production of c.50 MMscfe\/d &hellip; <a href=\"https:\/\/www.oilnewskenya.com\/index.php\/egypt-morocco-post-drilling-extension-of-plateau-production-at-south-disouq-and-de-risked-prospectivity-in-both-egypt-and-morocco\/\" class=\"more-link\">Read More<\/a><\/p>\n","protected":false},"author":24,"featured_media":8402,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[7442,7446],"tags":[7351,709,7633,7634,7629,7627,1629,7628,7632,7636,7631,7635,7630,7626],"class_list":["post-8400","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-countries","category-north-africa","tag-covid-19","tag-egypt","tag-lalla-mimouna","tag-lam-1","tag-lms-2","tag-meseda","tag-morocco","tag-rabul","tag-sdx","tag-sdx-energy-plc","tag-sobhi","tag-sobhi-discovery","tag-south-disouq","tag-west-gharib","entry"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/06\/West-Gharib.jpg?fit=420%2C361&ssl=1","jetpack_shortlink":"https:\/\/wp.me\/p5JWkQ-2bu","jetpack-related-posts":[{"id":12219,"url":"https:\/\/www.oilnewskenya.com\/index.php\/egypt-sdx-energy-discovers-more-oil-in-the-sobhi-field\/","url_meta":{"origin":8400,"position":0},"title":"EGYPT: SDX Energy Discovers More Oil in the Sobhi Field","author":"","date":"May 3, 2022","format":false,"excerpt":"SDX Energy has announced a gas discovery at the SD-12_East well that targeted a separate compartment in the Sobhi Field, within the Ibn Yunus North development lease.\u00a0 SD-12_East (SDX Working Interest: 67%) spudded on 17th\u00a0April and reached TD at 7,295ft MD on\u00a026 April 2022. The primary basal Kafr El Sheikh\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/04\/Egypt-South-Disouq.jpg?fit=591%2C539&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/04\/Egypt-South-Disouq.jpg?fit=591%2C539&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/04\/Egypt-South-Disouq.jpg?fit=591%2C539&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":12157,"url":"https:\/\/www.oilnewskenya.com\/index.php\/egypt-sdx-energy-spuds-the-sd-12-east-appraisal-well\/","url_meta":{"origin":8400,"position":1},"title":"EGYPT: SDX Energy Spuds the SD-12 East appraisal well","author":"","date":"April 21, 2022","format":false,"excerpt":"SDX Energy has announced the spudding of the SD-12 East appraisal well, targeting additional reserves to the east of the SD-12X discovery well on the Sobhi field located in the Ibn Yunus North development lease. SD-12 East spudded on 16 April 2022 and is expected to reach TD in approximately\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/04\/Egypt-South-Disouq.jpg?fit=591%2C539&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/04\/Egypt-South-Disouq.jpg?fit=591%2C539&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/04\/Egypt-South-Disouq.jpg?fit=591%2C539&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":11984,"url":"https:\/\/www.oilnewskenya.com\/index.php\/egypt-sdx-energy-spuds-sd-5x-well-at-south-disouq-concession\/","url_meta":{"origin":8400,"position":2},"title":"EGYPT: SDX Energy Spuds SD-5X Well At South Disouq Concession","author":"","date":"March 8, 2022","format":false,"excerpt":"SDX Energy has announced the spudding of the SD-5X exploration well, targeting the Warda prospect in the South Disouq development lease. SD-5X spudded on 4 March 2022 and is expected to reach TD in approximately three weeks. The primary target, which has already been encountered in the Ibn Yunus and\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/08\/Egypt-South-Disouq.jpg?fit=529%2C479&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/08\/Egypt-South-Disouq.jpg?fit=529%2C479&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/08\/Egypt-South-Disouq.jpg?fit=529%2C479&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":12079,"url":"https:\/\/www.oilnewskenya.com\/index.php\/egypt-sdx-energy-strikes-gas-at-the-sd-5x-well-south-disouq-concession\/","url_meta":{"origin":8400,"position":3},"title":"EGYPT: SDX Energy Strikes Gas at the SD-5X Well, South Disouq Concession","author":"","date":"March 22, 2022","format":false,"excerpt":"SDX Energy has announced a gas discovery at the SD-5X exploration well which targeted the Warda prospect in the South Disouq development lease.\u00a0 SD-5X spudded on 4 March and reached TD at 7,855ft MD on 16 March which was on time and within budget. The primary basal Kafr El Sheikh\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/03\/Egypt-South-Disouq.jpg?fit=591%2C539&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/03\/Egypt-South-Disouq.jpg?fit=591%2C539&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/03\/Egypt-South-Disouq.jpg?fit=591%2C539&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":9441,"url":"https:\/\/www.oilnewskenya.com\/index.php\/egypt-morocco-sdx-energy-provides-operational-update\/","url_meta":{"origin":8400,"position":4},"title":"EGYPT\/ MOROCCO: SDX Energy Provides Operational Update","author":"","date":"November 19, 2020","format":false,"excerpt":"Nine months to\u00a030 September 2020\u00a0Operations Highlights\u00a0 \u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0Average entitlement production of 6,646 boe\/d, an increase of 90% from the nine months to\u00a030 September 2019\u00a0(3,501 boe\/d) and 64% higher than average production during FY 2019 (4,062 boe\/d) due to strong production levels mainly from South Disouq, which delivered gross production of 48.6\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/08\/SDX-Energy.png?fit=541%2C306&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/08\/SDX-Energy.png?fit=541%2C306&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/08\/SDX-Energy.png?fit=541%2C306&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":8935,"url":"https:\/\/www.oilnewskenya.com\/index.php\/morocco-egypt-sdx-energy-announces-h1-operating-results\/","url_meta":{"origin":8400,"position":5},"title":"MOROCCO\/ EGYPT: SDX ENERGY Announces H1 Operating Results","author":"","date":"August 20, 2020","format":false,"excerpt":"H1 2020 Operations Highlights\u00a0 \u00b7\u00a0\u00a0\u00a0\u00a0H1 2020 average entitlement production of 6,980 boe\/d, an increase of 97% from H1 2019 and 72% higher than average production during FY 2019 (4,062 boe\/d) due to strong production levels mainly from South Disouq, which continued to perform ahead of expectations at gross production of\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/08\/SDX-Energy.png?fit=541%2C306&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/08\/SDX-Energy.png?fit=541%2C306&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/08\/SDX-Energy.png?fit=541%2C306&ssl=1&resize=525%2C300 1.5x"},"classes":[]}],"jetpack_sharing_enabled":true,"jetpack_likes_enabled":true,"_links":{"self":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/8400","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/comments?post=8400"}],"version-history":[{"count":2,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/8400\/revisions"}],"predecessor-version":[{"id":8404,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/8400\/revisions\/8404"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media\/8402"}],"wp:attachment":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media?parent=8400"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/categories?post=8400"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/tags?post=8400"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}