{"id":8034,"date":"2020-03-03T08:57:50","date_gmt":"2020-03-03T08:57:50","guid":{"rendered":"http:\/\/oilnewskenya.com\/?p=8034"},"modified":"2020-03-03T08:57:50","modified_gmt":"2020-03-03T08:57:50","slug":"toshiba-wins-order-in-ethiopia-for-small-scale-geothermal-power-generation-system-for-wellhead","status":"publish","type":"post","link":"https:\/\/www.oilnewskenya.com\/index.php\/toshiba-wins-order-in-ethiopia-for-small-scale-geothermal-power-generation-system-for-wellhead\/","title":{"rendered":"Toshiba Wins Order in Ethiopia for Small Scale Geothermal Power Generation System for Wellhead"},"content":{"rendered":"<p>Toshiba Energy Systems &amp; Solutions Corporation (Toshiba ESS)\u00a0 has announced that the company, Toyota Tsusho Corporation and Turkish engineering company Egesim Energy Electro-Mechanic Construction Contracting Co., Ltd. have received an order of engineering, procurement and construction for Aluto Langano Geothermal Wellhead Power System in central Ethiopia, which is developed by the Ethiopian Electric Power (EEP). Toshiba ESS will be in charge of supplying the steam turbine and the generator.<\/p>\n<p>This project will proceed under the Grant Aid scheme of the Japan International Cooperation Agency (JICA).<\/p>\n<p>Aluto Langano Geothermal Wellhead Power System is a 5 MW small scale geothermal power plant where EEP plans to commence commercial operations in August 2021. Toshiba ESS will deliver its small scale geothermal power generation system at this power plant.<\/p>\n<p>The small scale geothermal power generation system that has been developed by Toshiba ESS\u3000generates power from geothermal resources with outputs ranging from 1 MW to 20 MW. Capable of being installed within a short period for early operation and it is a portable power generation system that can effectively utilize a small number of drilled wells.<\/p>\n<p>Ethiopia is Africa&#8217;s second most populous nation with a population of over 100 million. Although the country is growing economically, its electrification rate stands at 30%* and the country therefore faces the need to increase its power facilities.<\/p>\n<p>Ethiopia possesses an equivalent of roughly 10,000 MW* of geothermal potential resources and the country is planning to develop new geothermal power plants totaling a capacity of roughly 2,500 MW* by the year 2030.<\/p>\n<p>Toyoaki Fujita, Business Development Executive at Toshiba ESS, said, &#8220;We are extremely proud to receive this facilities order, which is our first in Ethiopia for power plant. We have signed a memorandum of understanding (MOU) on a comprehensive partnership in geothermal power with EEP in September 2014. Based on this MOU, we have been supporting them on human resources development activities such as training some of their executives and managers at our company utilizing various Japanese government support programs. When Prime Minister of Ethiopia came to Japan in August 2019, he visited our Keihin Product Operations to see our manufacturing technology of geothermal power. Going forward we will maintain ongoing initiatives in human resources development and contribute to the development of geothermal power generation in Ethiopia.&#8221;<\/p>\n<div>Name of Project: Aluto Langano Geothermal Wellhead Power System<\/div>\n<div>Owner: Ethiopian Electric Power (EEP)<\/div>\n<div>EPC Contractor: Toyota Tsusho Corporation<\/div>\n<div>Location: Aluto Langano, East Shewa Zone, Oromia Region, Ethiopia<\/div>\n<div>Supplied by Toshiba ESS: 1 set of 5 MW class steam turbine and generator for small scale<\/div>\n<div>geothermal power generation<\/div>\n<div>Planned start date of commercial operation: August 2021<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Toshiba Energy Systems &amp; Solutions Corporation (Toshiba ESS)\u00a0 has announced that the company, Toyota Tsusho Corporation and Turkish engineering company Egesim Energy Electro-Mechanic Construction Contracting Co., Ltd. have received an &hellip; <a href=\"https:\/\/www.oilnewskenya.com\/index.php\/toshiba-wins-order-in-ethiopia-for-small-scale-geothermal-power-generation-system-for-wellhead\/\" class=\"more-link\">Read More<\/a><\/p>\n","protected":false},"author":24,"featured_media":8035,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[4747],"tags":[7364,7362,809,4793,990,4766,4767,7363,7360,7359,7361],"class_list":["post-8034","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-geothermal","tag-aluto-langano","tag-egesim-energy-electro-mechanic-construction-contracting-co","tag-ethiopia","tag-ethiopian-electric-power","tag-geothermal","tag-japan-international-cooperation-agency","tag-jica","tag-ltd","tag-toshiba-ees","tag-toshiba-energy-systems-solutions-corporation","tag-toyota-tsusho-corporation","entry"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/03\/wellhead.jpg?fit=282%2C179&ssl=1","jetpack_shortlink":"https:\/\/wp.me\/p5JWkQ-25A","jetpack-related-posts":[{"id":4951,"url":"https:\/\/www.oilnewskenya.com\/index.php\/toshiba-concludes-mou-with-ethiopian-electric-power-on-geothermal-power-generation\/","url_meta":{"origin":8034,"position":0},"title":"Toshiba concludes MoU with Ethiopian Electric Power on geothermal power generation","author":"","date":"September 29, 2014","format":false,"excerpt":"Toshiba Corporation has announced that the company has concluded a memorandum of understanding (MOU) with Ethiopian Electric Power on a comprehensive partnership in geothermal power that will see the parties collaborate in power generation projects and personnel development. Ethiopian Electric Power (EEP), a publicly owned utility, engages in the development\u2026","rel":"","context":"In &quot;Geothermal&quot;","block_context":{"text":"Geothermal","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/renewables-2\/geothermal\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/08\/Toshiba-EEP_MOU.png?fit=519%2C332&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":4948,"url":"https:\/\/www.oilnewskenya.com\/index.php\/toshiba-concludes-mou-with-tgdc-for-geothermal-power-generation-business-in-tanzania\/","url_meta":{"origin":8034,"position":1},"title":"Toshiba Concludes MoU with TGDC for Geothermal Power Generation Business in Tanzania","author":"","date":"December 8, 2015","format":false,"excerpt":"Toshiba Corporation has announced that the company has concluded a memorandum of understanding (MOU) with Tanzania Geothermal Development Company Limited (TGDC) for comprehensive collaboration in the geothermal power generation business. This is TGDC\u2019s first MOU with a Japanese company. TGDC and Toshiba will collaborate to promote a geothermal power generation\u2026","rel":"","context":"In &quot;Geothermal&quot;","block_context":{"text":"Geothermal","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/renewables-2\/geothermal\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/08\/Toshiba-TGDC.png?fit=541%2C397&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/08\/Toshiba-TGDC.png?fit=541%2C397&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/08\/Toshiba-TGDC.png?fit=541%2C397&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":12610,"url":"https:\/\/www.oilnewskenya.com\/index.php\/toshiba-ess-kengen-conclude-mou-on-om-services-for-geothermal-power-plants\/","url_meta":{"origin":8034,"position":2},"title":"Toshiba ESS, KenGen Conclude MoU on O&#038;M Services for Geothermal Power Plants","author":"","date":"September 1, 2022","format":false,"excerpt":"Kenya Electricity Generating Company\u00a0 (KenGen) and Toshiba Energy Systems & Solutions Corporation (Toshiba ESS) concluded a memorandum of understanding (MOU). The MOU anticipates a partnership of Operation and Maintenance (O&M) services for geothermal power plants in developing countries including \u00a0East African countries through a combination of KenGen and Toshiba ESS\u2019s\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/07\/KenGen-Olkaria-VI.jpg?fit=1200%2C801&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/07\/KenGen-Olkaria-VI.jpg?fit=1200%2C801&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/07\/KenGen-Olkaria-VI.jpg?fit=1200%2C801&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/07\/KenGen-Olkaria-VI.jpg?fit=1200%2C801&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/07\/KenGen-Olkaria-VI.jpg?fit=1200%2C801&ssl=1&resize=1050%2C600 3x"},"classes":[]},{"id":12230,"url":"https:\/\/www.oilnewskenya.com\/index.php\/ethiopia-kengen-completes-drilling-the-seventh-geothermal-well-at-the-aluto-langano-geothermal-field\/","url_meta":{"origin":8034,"position":3},"title":"ETHIOPIA: KenGen Completes Drilling the Seventh Geothermal Well at the Aluto-Langano Geothermal field","author":"","date":"April 30, 2022","format":false,"excerpt":"Kenya Electricity Generating Company PLC (KenGen) has completed drilling of the seventh geothermal well in Ethiopia further bolstering the company\u2019s renewable energy footprint in the Horn of Africa. This latest announcement is from the Aluto-Langano geothermal site where KenGen is implementing a drilling consultancy project for the state-owned Ethiopian Electric\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/09\/Geothermal-OW-923.png?fit=631%2C344&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/09\/Geothermal-OW-923.png?fit=631%2C344&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/09\/Geothermal-OW-923.png?fit=631%2C344&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":11131,"url":"https:\/\/www.oilnewskenya.com\/index.php\/ethiopia-kengen-completes-eeps-deepest-geothermal-well\/","url_meta":{"origin":8034,"position":4},"title":"Ethiopia KenGen Completes EEP&#8217;s Deepest Geothermal Well","author":"","date":"November 12, 2021","format":false,"excerpt":"Kenya Electricity Generating Company (KenGen) has announced the completion of a 3,000-meter geothermal well in Ethiopia, which exceeded the target of 2,750 meters. This is the second of eight wells it has been commissioned to drill by Ethiopian Electric Power Company (EEP) the state-owned electricity producer as Ethiopia seeks to\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/11\/KenGen-drilling-Aluto-Langano.jpeg?fit=800%2C599&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/11\/KenGen-drilling-Aluto-Langano.jpeg?fit=800%2C599&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/11\/KenGen-drilling-Aluto-Langano.jpeg?fit=800%2C599&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/11\/KenGen-drilling-Aluto-Langano.jpeg?fit=800%2C599&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":11239,"url":"https:\/\/www.oilnewskenya.com\/index.php\/djibouti-kengen-commences-multi-well-drilling-campaign\/","url_meta":{"origin":8034,"position":5},"title":"DJIBOUTI: KenGen Commences Multi-well Drilling Campaign","author":"","date":"November 25, 2021","format":false,"excerpt":"Kenya Electricity Generating Company (KenGen) PLC has commenced drilling of the first of three geothermal wells in Djibouti setting in motion a Ksh.0.7 billion contract signed in February this year. The drilling of the first well is expected to take about two months to complete as KenGen seeks to export\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/11\/KenGen-Djibouti.jpg?fit=720%2C540&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/11\/KenGen-Djibouti.jpg?fit=720%2C540&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/11\/KenGen-Djibouti.jpg?fit=720%2C540&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/11\/KenGen-Djibouti.jpg?fit=720%2C540&ssl=1&resize=700%2C400 2x"},"classes":[]}],"jetpack_sharing_enabled":true,"jetpack_likes_enabled":true,"_links":{"self":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/8034","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/comments?post=8034"}],"version-history":[{"count":1,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/8034\/revisions"}],"predecessor-version":[{"id":8036,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/8034\/revisions\/8036"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media\/8035"}],"wp:attachment":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media?parent=8034"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/categories?post=8034"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/tags?post=8034"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}