{"id":7611,"date":"2019-03-08T13:18:58","date_gmt":"2019-03-08T13:18:58","guid":{"rendered":"https:\/\/www.oilnewskenya.com\/?p=7611"},"modified":"2019-03-08T13:19:20","modified_gmt":"2019-03-08T13:19:20","slug":"maurel-et-prom-to-carry-out-maintenance-in-mnazi-bay-to-accommodate-future-demand","status":"publish","type":"post","link":"https:\/\/www.oilnewskenya.com\/index.php\/maurel-et-prom-to-carry-out-maintenance-in-mnazi-bay-to-accommodate-future-demand\/","title":{"rendered":"Maurel et Prom to Carry Out Maintenance in Mnazi Bay to Accommodate Future Demand"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">Maurel\net Prom has scheduled a slick line campaign towards the end of March 2019 which\nwill include opening the sliding-sleeves of various\nwell completions and acquiring static pressures in the Lower MB sand interval.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The campaign involves opening sliding sleeves, which\nshut off or open flow from one or more reservoir zones and&nbsp;allows\nfor more operational flexibility in the asset with regards sustaining plateau\nproduction.&nbsp; <\/p>\n\n\n\n<p class=\"wp-block-paragraph\">According to JV partner Wentworth Resources the\npressure monitoring of sands currently not flowing will further refine the\nJoint Venture understanding of both in-place and recoverable volumes in all\nintervals of the Mnazi Bay field.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Ultimately\nthe JV says these operations will determine if sustained higher production\nrates can accommodate forward demand growth.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">It\nis expected that demand will increase in H2 2019 and beyond due to an increase\nin demand from Dangote Cement Plant (from 15 MMscf\/d to 35 MMscf\/d) and the\nKinyerezi Power Complex realizing its full capacity.&nbsp;Following this it is\nexpected that the average daily production rate will be limited to 70 MMscf\/day\nfrom 11 March 2019 until early April 2019.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cDespite this reduced production, the onset of the\nrainy season in April through May 2019 and the scheduled maintenance of the\npower stations at the Ubungo Complex in Dar es Salaam, the Company is\nmaintaining current guidance for 2019 average daily production of between 75 &#8211;\n85 MMscf\/day,\u201d Wentworth said in a statement. &nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Meanwhile\nWentworth reports that payment for gas sales in January and February from the Mnazi Bay Concession have been received from both\nTPDC and Tanzania Electric Supply Company Limited (TANESCO).<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Maurel et Prom has scheduled a slick line campaign towards the end of March 2019 which will include opening the sliding-sleeves of various well completions and acquiring static pressures in &hellip; <a href=\"https:\/\/www.oilnewskenya.com\/index.php\/maurel-et-prom-to-carry-out-maintenance-in-mnazi-bay-to-accommodate-future-demand\/\" class=\"more-link\">Read More<\/a><\/p>\n","protected":false},"author":24,"featured_media":6445,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[11],"tags":[1534,1608,2466],"class_list":["post-7611","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-top-news","tag-maurel-et-prom","tag-mnazi-bay","tag-tanzania","entry"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2017\/10\/mnazi-bay-pipeline.png?fit=437%2C531&ssl=1","jetpack_shortlink":"https:\/\/wp.me\/p5JWkQ-1YL","jetpack-related-posts":[{"id":4412,"url":"https:\/\/www.oilnewskenya.com\/index.php\/tanzanias-mnazi-bay-reserves-up-20-in-new-evaluation\/","url_meta":{"origin":7611,"position":0},"title":"Tanzania\u2019s Mnazi Bay Reserves Up 20% in New Evaluation","author":"","date":"February 29, 2016","format":false,"excerpt":"A new independent RPS Energy Canada Ltd. Calgary, Canada on behalf of Maurel et Prom (Operator) and Wentworth Resources has increased the (2P) reserves increased by 20%. According to JV partner Wentworth Resources the results follow favourable data from the MB-4 well drilled during 2015 and which was drilled to\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/01\/Mnazi-Bay-Concession.png?fit=448%2C554&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":3091,"url":"https:\/\/www.oilnewskenya.com\/index.php\/maurel-et-prom-reports-promising-results-mb-4-development-well-tanzania\/","url_meta":{"origin":7611,"position":1},"title":"Maurel et Prom reports Promising results of the MB-4 development well in Tanzania","author":"","date":"June 18, 2015","format":false,"excerpt":"Manzi Bay operator Maurel et Prom has announced that the MB-4 development well, drilled 800 m from the MB-2 and MB-3 wells at the Mnazi Bay gas field, has crossed Miocene gas reservoirs with net pay of 24 metres (Upper Mnazi Bay) and 43 metres (Lower Mnazi Bay) respectively, both\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/06\/MB-4-well-Tanzania-photo.png?fit=435%2C329&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":3263,"url":"https:\/\/www.oilnewskenya.com\/index.php\/first-gas-delivery-new-transnational-pipeline-commence-tanzania\/","url_meta":{"origin":7611,"position":2},"title":"First gas delivery to the new transnational pipeline commence in Tanzania","author":"","date":"August 21, 2015","format":false,"excerpt":"Wentworth Resources has announced that gas deliveries have now commenced to the new transnational pipeline from the the Mnazi Bay joint venture in Tanzania. Currently two wells are now producing and the remaining three wells will be put on production in the coming months according to the company. \"We are\u2026","rel":"","context":"In &quot;Profile&quot;","block_context":{"text":"Profile","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/profile\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/09\/mnazi-bay-gas.jpg?fit=750%2C665&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/09\/mnazi-bay-gas.jpg?fit=750%2C665&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/09\/mnazi-bay-gas.jpg?fit=750%2C665&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/09\/mnazi-bay-gas.jpg?fit=750%2C665&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":5440,"url":"https:\/\/www.oilnewskenya.com\/index.php\/mnazi-bay-jv-partners-see-sales-decline-following-symbion-power-plant-closure\/","url_meta":{"origin":7611,"position":3},"title":"Mnazi Bay JV Partners See Sales Decline following Symbion Power Plant Closure","author":"","date":"November 29, 2016","format":false,"excerpt":"Mnazi Bay joint venture partners have seen a decline in gas sales as the average gross daily gas production for the third quarter was 34 MMscf\/d down from 51 MMscf\/d during Q2 2016 the suspension of operations at the Symbion gas-fired power plant as a result of a dispute with\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/11\/symbion-power-plant.png?fit=710%2C294&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/11\/symbion-power-plant.png?fit=710%2C294&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/11\/symbion-power-plant.png?fit=710%2C294&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/11\/symbion-power-plant.png?fit=710%2C294&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":1767,"url":"https:\/\/www.oilnewskenya.com\/index.php\/mnazi-bay-licence-partners-sign-gsa-with-tanzania-petroleum-development-corporation\/","url_meta":{"origin":7611,"position":4},"title":"Mnazi Bay licence partners sign GSA with Tanzania Petroleum Development Corporation","author":"Samuel Kamau Mbote","date":"September 15, 2014","format":false,"excerpt":"Maurel & Prom\u00a0has said that, along with\u00a0Mnazi Bay licence partners Wentworth and Tanzania Petroleum Development Corporation (TPDC), it has signed a gas sales and purchase agreement with TPDC for the long-term sale of natural gas from the\u00a0Mnazi Bay and Msimbati fields. The agreement facilitate gas sales from the two fields\u00a0in\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/09\/mnazi-bay-gas.jpg?fit=750%2C665&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/09\/mnazi-bay-gas.jpg?fit=750%2C665&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/09\/mnazi-bay-gas.jpg?fit=750%2C665&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/09\/mnazi-bay-gas.jpg?fit=750%2C665&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":15600,"url":"https:\/\/www.oilnewskenya.com\/index.php\/tanzania-mnazi-bay-mobilises-rig-for-three-well-drilling-campaign-to-boost-gas-production\/","url_meta":{"origin":7611,"position":5},"title":"Tanzania: Mnazi Bay Mobilises Rig for Three-Well Drilling Campaign to Boost Gas Production","author":"","date":"January 30, 2026","format":false,"excerpt":"Operators at Tanzania\u2019s Mnazi Bay gas field have mobilised a drilling rig to site, marking the start of a three-well drilling campaign aimed at materially increasing gas production and strengthening supply reliability for the domestic market. The drilling programme, which had initially been scheduled to spud in December, is now\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/02\/Mnazi-Bay-Field.png?fit=478%2C561&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]}],"jetpack_sharing_enabled":true,"jetpack_likes_enabled":true,"_links":{"self":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/7611","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/comments?post=7611"}],"version-history":[{"count":1,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/7611\/revisions"}],"predecessor-version":[{"id":7612,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/7611\/revisions\/7612"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media\/6445"}],"wp:attachment":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media?parent=7611"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/categories?post=7611"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/tags?post=7611"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}