{"id":7078,"date":"2018-06-19T16:33:11","date_gmt":"2018-06-19T16:33:11","guid":{"rendered":"http:\/\/www.oilnewskenya.com\/?p=7078"},"modified":"2018-06-19T16:35:28","modified_gmt":"2018-06-19T16:35:28","slug":"pate-2-3-wells-face-delays-sakson-kenyan-agent-head-court","status":"publish","type":"post","link":"https:\/\/www.oilnewskenya.com\/index.php\/pate-2-3-wells-face-delays-sakson-kenyan-agent-head-court\/","title":{"rendered":"Exclusive: Pate 2 &#038; 3 Wells Could Face Further Delays As Sakson &#038; Kenyan Agent Head to Court"},"content":{"rendered":"<p>The continuation of Pate 2 and 3 wells in Lamu\u2019s block L4 is in doubt after the rig owner Sakson Drilling &amp; Oil Services and its Kenyan agent Gas &amp; Oil Exploration Consultants Limited (GASOILEX) fell out over unpaid commissions as part of the mobilization fee and as an agent for acting as an agent in the tender by Zarara Oil and Gas Limited.<\/p>\n<p>According to correspondence seen by OilNews Kenya Sakson Drilling &amp; Oil Services is been sued for over $176,500 in commission of total costs from the projects, mobilization fee and lawyer collection fee after the Dubai based company failed to honor demands by GASOILEX lawyers.<\/p>\n<p>The suit could further delay drilling plans by Zarara with GASOILEX having continued to court to demand for settlement arising from its role in the transactions leading to the tender awarding as Sakson\u2019s point-man in Kenya. The Sakson Rig SK604, a 2,600HP rig\u00a0is currently on its way to Mombasa from the port of Tunis with an expected arrival date of 18<sup>th<\/sup> July. From there the rig will proceed to the Mtandawanda port in Lamu before being transported by trucks 16 kilometers to the drilling sites.<\/p>\n<p><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-7079 aligncenter\" src=\"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2018\/06\/GASOILEX.png?resize=471%2C101&#038;ssl=1\" alt=\"\" width=\"471\" height=\"101\" srcset=\"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2018\/06\/GASOILEX.png?w=471&amp;ssl=1 471w, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2018\/06\/GASOILEX.png?resize=100%2C21&amp;ssl=1 100w, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2018\/06\/GASOILEX.png?resize=300%2C64&amp;ssl=1 300w\" sizes=\"auto, (max-width: 471px) 100vw, 471px\" \/><\/p>\n<p>Already the wells have <a href=\"https:\/\/bit.ly\/2ymggpF\">spud<\/a> using a top-hole drilling rig from Drilling Spares &amp; Services Limited (\u201cDSSL\u201d) an experienced Kenyan drilling company to drill and run 20-inch casing for both Pate-2 and Pate-3 wells to 300 meters. The Sakson rig is expected to drill the two wells to a total depth of 4500 meters.<\/p>\n<p>This would be the second such delay after Zarara Oil and Gas fell out with the initial tender winner <a href=\"https:\/\/bit.ly\/2sM3Li7\">Greatwall drilling<\/a> of China delaying the drilling by several months and necessitating the license <a href=\"https:\/\/bit.ly\/2HGwZ8a\">extension<\/a> by the Ministry of Energy and Petroleum in February 2018.<\/p>\n<p>Zarara Oil and Gas Limited (\u2018Zarara\u2019) which holds a 75% working interest is a 100% subsidiary of Midway Resources. CH-Swiss Oil Holdings International holds 15% and the National Oil Company of Kenya at 10%. MRI has negotiated a legally binding heads of agreement for the eventual acquisition of the 15% interest of CH-Swiss Oil Holdings.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The continuation of Pate 2 and 3 wells in Lamu\u2019s block L4 is in doubt after the rig owner Sakson Drilling &amp; Oil Services and its Kenyan agent Gas &amp; &hellip; <a href=\"https:\/\/www.oilnewskenya.com\/index.php\/pate-2-3-wells-face-delays-sakson-kenyan-agent-head-court\/\" class=\"more-link\">Read More<\/a><\/p>\n","protected":false},"author":24,"featured_media":6980,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[11],"tags":[3508,3507,6256,6874,6933,1376,4437,5578,6167,6255],"class_list":["post-7078","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-top-news","tag-block-l13","tag-block-l4","tag-ch-swiss-oil-holdings-international","tag-drilling-spares-services-limited","tag-gas-oil-exploration-consultants-limited","tag-lamu","tag-midway-resources","tag-national-oil-company-of-kenya","tag-sakson-drilling-oil-services","tag-zarara-oil-and-gas-limited","entry"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2018\/04\/IMG-20180426-WA0030.jpg?fit=774%2C1032&ssl=1","jetpack_shortlink":"https:\/\/wp.me\/p5JWkQ-1Qa","jetpack-related-posts":[{"id":7091,"url":"https:\/\/www.oilnewskenya.com\/index.php\/pate-2-continued-drilling-set-continue-august-sakson-rig-arrives-mombasa\/","url_meta":{"origin":7078,"position":0},"title":"Pate 2 Well Drilling Set to Continue in August as Sakson Rig Arrives in Mombasa","author":"","date":"June 26, 2018","format":false,"excerpt":"Drilling of Pate 2 well in Lamu's Block L4 could continue this late July or early August after the much awaited ship carrying the 2600hp Sakson SK604 rig arrived in Mombasa last week. The rig will then head off to Mtandawanda port in Lamu East aboard a barge hired from\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2018\/06\/SK-604.png?fit=294%2C401&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":6979,"url":"https:\/\/www.oilnewskenya.com\/index.php\/zarara-spuds-initial-well-blocks-l4-l13-kenya-pate-drilling-campaign\/","url_meta":{"origin":7078,"position":1},"title":"Zarara Spuds Initial Well in Blocks L4 &#038; L13 Kenya For Pate Drilling Campaign","author":"","date":"April 26, 2018","format":false,"excerpt":"Zarara Oil & Gas Limited (\u201cZarara\u201d), a wholly owned subsidiary of Midway Resources International, announces the spudding today of Pate-2 well, that commences its Pate Drilling Campaign on its production sharing contracts (\u201cPSCs\u201d) on blocks L4 andL13 in Kenya. The blocks are located in the coastal region near Port Lamu,\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2018\/04\/IMG-20180426-WA0030.jpg?fit=774%2C1032&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2018\/04\/IMG-20180426-WA0030.jpg?fit=774%2C1032&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2018\/04\/IMG-20180426-WA0030.jpg?fit=774%2C1032&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2018\/04\/IMG-20180426-WA0030.jpg?fit=774%2C1032&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":7618,"url":"https:\/\/www.oilnewskenya.com\/index.php\/pate-2-well-panic-kicks-in-over-unpaid-millions-to-kenyan-contractors\/","url_meta":{"origin":7078,"position":2},"title":"PATE 2 WELL: PANIC KICKS IN OVER UNPAID MILLIONS TO KENYAN CONTRACTORS","author":"","date":"March 15, 2019","format":false,"excerpt":"Days after Lamu\u2019s block L4 operator Zarara Oil and Gas a subsidiary of Midway Resources announced that their drilling phase had been completed, Kenyan contractor who provided various services and equipment are in panic as they fear the license holder could take off without paying","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2019\/03\/OGCA.png?fit=590%2C226&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2019\/03\/OGCA.png?fit=590%2C226&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2019\/03\/OGCA.png?fit=590%2C226&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":6792,"url":"https:\/\/www.oilnewskenya.com\/index.php\/zarara-oil-gas-awarded-4-month-license-extension-kenyas-blocks-l4-l13\/","url_meta":{"origin":7078,"position":3},"title":"Zarara Oil and Gas Awarded 4 month License Extension in Kenya\u2019s Blocks L4 &#038; L13","author":"","date":"February 1, 2018","format":false,"excerpt":"Zarara Oil and Gas the operator of blocks L4 and L13 has received a second extension to the current extension by the Ministry of Petroleum and Mining to enable them to drill a well in Pate Island earlier planned for drilling by 31st December 2017.The second extension means the contract\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/10\/Pate-2-3.png?fit=528%2C477&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/10\/Pate-2-3.png?fit=528%2C477&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/10\/Pate-2-3.png?fit=528%2C477&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":5993,"url":"https:\/\/www.oilnewskenya.com\/index.php\/chinas-greatwall-bags-lamus-pate-2-well-drilling-contract\/","url_meta":{"origin":7078,"position":4},"title":"China\u2019s Greatwall Bags Lamu\u2019s Pate 2 Well Drilling Contract","author":"","date":"May 23, 2017","format":false,"excerpt":"Greatwall Drilling Company Ltd has been contracted to drill Pate 2 well in Zarara Oil and Gas operated Block L4 scheduled to spud later in the year according to sources. The Chinese driller beat a team of other companies including Dubai based Sakson Drilling & Oil Services earlier involved in\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/10\/Pate-2-3.png?fit=528%2C477&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/10\/Pate-2-3.png?fit=528%2C477&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/10\/Pate-2-3.png?fit=528%2C477&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":7180,"url":"https:\/\/www.oilnewskenya.com\/index.php\/pate-2-well-drilling-schedule-reach-total-depth-mid-october\/","url_meta":{"origin":7078,"position":5},"title":"Pate 2 Well Drilling On Schedule to Reach Total Depth in Mid October","author":"","date":"September 18, 2018","format":false,"excerpt":"The Ongoing drilling of the Pate 2 well in Lamu\u2019s Pate Island in Block L4 is continuing as scheduled according to Zarara Oil and Gas country manager Peter Nduru with drilling expected to reach the total depth mid next month. According to Mr Nduru the well which is being drilled\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2018\/06\/SK-604.png?fit=294%2C401&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]}],"jetpack_sharing_enabled":true,"jetpack_likes_enabled":true,"_links":{"self":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/7078","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/comments?post=7078"}],"version-history":[{"count":2,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/7078\/revisions"}],"predecessor-version":[{"id":7081,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/7078\/revisions\/7081"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media\/6980"}],"wp:attachment":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media?parent=7078"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/categories?post=7078"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/tags?post=7078"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}