{"id":6982,"date":"2018-05-03T07:29:59","date_gmt":"2018-05-03T07:29:59","guid":{"rendered":"http:\/\/www.oilnewskenya.com\/?p=6982"},"modified":"2018-05-03T07:29:59","modified_gmt":"2018-05-03T07:29:59","slug":"wellbore-workover-offers-best-chance-improved-production-kiliwani-north-1","status":"publish","type":"post","link":"https:\/\/www.oilnewskenya.com\/index.php\/wellbore-workover-offers-best-chance-improved-production-kiliwani-north-1\/","title":{"rendered":"Wellbore Workover Offers Best Chance For Improved Production at Kiliwani North-1"},"content":{"rendered":"<p>Kiliwani North operator Aminex has said a workover of the wellbore offers more immediate gains in terms of both production potential and reserves recovery as compared to the earlier preferred surface compression facilities which remains an option.<\/p>\n<p>This follows a detailed simulation study on the Kiliwani North field based on a history match of past reservoir performance undertaken since the end of December which showed believes that an opportunity may exist to access unperforated reservoirs capable of recovering additional gas volumes.<\/p>\n<p>Aminex has already identified equipment has already been identified in country and pending further work on plant specifications and appropriate government approvals, and intends to re-enter the well and perforate the untapped gas zone.<\/p>\n<p>&#8220;It is encouraging that the technical work recently completed shows that further gas production and reserves can be accessed through a recompletion of the existing well and we look forward to confirmation of the operators plans as they firm up,&#8221; Neil Ritson, Solo&#8217;s Chairman, commented.<\/p>\n<p>Due to inlet pressure limitations and the presence of fluid build-up within the wellbore, the well has been produced infrequently in order to maintain basic plant operations.<\/p>\n<p>In <a href=\"https:\/\/bit.ly\/2hfpnAF\">November<\/a> Aminex\u00a0reported that production from the\u00a0Kiliwani North-1\u00a0well (KN-1) was fluctuating below 1 million standard cubic feet per day due to low reservoir pressure and inlet pressure restrictions of the gas processing plant necessitating some intevention.<\/p>\n<p>The Kiliwani North-1 well had averaged approximately 15 MMcfd during the first six months of 2017, a drop from\u00a0<a href=\"http:\/\/bit.ly\/2bKIUFL\">July 2016<\/a>\u00a0when the company reported that gas production from the Kiliwani North-1 well in Tanzania reached 30 mmcf per day (approximately 5,000 barrels of oil equivalent per day) with stable pressure recordings at that rate.<\/p>\n<p>Aminex has 54.575% of the Kiliwani North Development Licence through its 100% owned subsidiary Ndovu Resources Limited alongside RAK Gas LLC 23.75%, Bounty Oil &amp; Gas NL 9.5%, Solo Oil 7.55% and TPDC 5%<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Kiliwani North operator Aminex has said a workover of the wellbore offers more immediate gains in terms of both production potential and reserves recovery as compared to the earlier preferred &hellip; <a href=\"https:\/\/www.oilnewskenya.com\/index.php\/wellbore-workover-offers-best-chance-improved-production-kiliwani-north-1\/\" class=\"more-link\">Read More<\/a><\/p>\n","protected":false},"author":24,"featured_media":4803,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[11],"tags":[137,3917,2856,1322,2878,2119,2342,2466,2543],"class_list":["post-6982","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-top-news","tag-aminex","tag-bounty-oil-gas","tag-kiliwani-north-1-well","tag-kiliwani-north-development-licence","tag-ndovu-resources-limited","tag-rak-gas","tag-solo-oil","tag-tanzania","tag-tpdc","entry"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/07\/kiliwani-north-well.png?fit=525%2C519&ssl=1","jetpack_shortlink":"https:\/\/wp.me\/p5JWkQ-1OC","jetpack-related-posts":[{"id":4551,"url":"https:\/\/www.oilnewskenya.com\/index.php\/gas-production-commences-at-tanzanias-kiliwani-north-gas-field\/","url_meta":{"origin":6982,"position":0},"title":"Gas Production Commences at Tanzania&#8217;s Kiliwani North Gas Field","author":"","date":"April 6, 2016","format":false,"excerpt":"Operator at the the Kiliwani North Development Licence\u00a0 Aminex has announced gas production from its\u00a0Kiliwani North gas field\u2019s Kiliwani North-1 well ('KN-1') \u00a0in Tanzania has commenced on schedule as had earlier been announced. According to Aminex production is expected to build up to an anticipated production rate of 25-30 mmcfd\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/10\/kiliwani-north.jpg?fit=498%2C565&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":6492,"url":"https:\/\/www.oilnewskenya.com\/index.php\/aminex-seeks-remedies-kiliwani-north-1-well-pressure-dips\/","url_meta":{"origin":6982,"position":1},"title":"Aminex Seeks Remedies as Kiliwani North-1 well Pressure Dips","author":"","date":"November 6, 2017","format":false,"excerpt":"Aminex\u00a0reports that production from the\u00a0Kiliwani North-1\u00a0well (KN-1) is currently fluctuating below 1 million standard cubic feet per day due to low reservoir pressure and inlet pressure restrictions of the gas processing plant. A review of the existing technical data leads the Company says has led to a conclusion that Kiliwani\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/07\/kiliwani-north-well.png?fit=525%2C519&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/07\/kiliwani-north-well.png?fit=525%2C519&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/07\/kiliwani-north-well.png?fit=525%2C519&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":4802,"url":"https:\/\/www.oilnewskenya.com\/index.php\/tanzanias-kiliwani-north-well-reaches-30-mmcf-per-day-during-commissioning\/","url_meta":{"origin":6982,"position":2},"title":"Tanzania\u2019s Kiliwani North well reaches 30 mmcf per day during commissioning","author":"","date":"July 4, 2016","format":false,"excerpt":"Aminex has announced that over the weekend, gas production from the Kiliwani North-1 well in Tanzania reached 30 mmcf per day (approximately 5,000 barrels of oil equivalent per day) with stable pressure recordings at that rate. Aminex adds that the commissioning process is expected to be concluded with the testing\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/07\/kiliwani-north-well.png?fit=525%2C519&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/07\/kiliwani-north-well.png?fit=525%2C519&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/07\/kiliwani-north-well.png?fit=525%2C519&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":4316,"url":"https:\/\/www.oilnewskenya.com\/index.php\/kiliwani-north-1-well-set-for-production-starting-mid-february\/","url_meta":{"origin":6982,"position":3},"title":"Kiliwani North 1 Well Set for production starting mid-February","author":"","date":"February 1, 2016","format":false,"excerpt":"Aminex has informed its shareholders the Tanzanian Petroleum Development Corporation has advised Kiliwani North-1 well could start production in mid February and is currently undergoing final well integrity testing prior to first production. This development follows the signing of a Gas Sales Agreement (GSA) in January which saw the gas\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/02\/Kiliwani-North.png?fit=379%2C538&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":4343,"url":"https:\/\/www.oilnewskenya.com\/index.php\/solo-oil-invests-additional-equity-in-kiliwani-north-tanzania\/","url_meta":{"origin":6982,"position":4},"title":"Solo Oil Invests Additional Equity in Kiliwani North, Tanzania","author":"","date":"February 11, 2016","format":false,"excerpt":"Solo Oil has announced that it has acquired a further interest in the Kiliwani North Development Licence from concession operator Aminex to reach 10% from the current 6.175% interest in the KNDL where the Kiliwani North-1 well is located and will pay Aminex US$2.16 million. The increase in ownership follows\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/09\/solo-oil.jpg?fit=320%2C320&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":5059,"url":"https:\/\/www.oilnewskenya.com\/index.php\/aminex-receives-first-payment-for-gas-produced-from-tanzanias-kiliwani-north-1-well\/","url_meta":{"origin":6982,"position":5},"title":"Aminex receives first payment for gas produced from Tanzania&#8217;s Kiliwani North-1 Well","author":"","date":"August 18, 2016","format":false,"excerpt":"Kiliwani North license operator Aminex has announced that it has received first payment in relation to gas produced from the Kiliwani North-1 well in Tanzania and supplied to the Tanzania Petroleum Development Corporation. Gas produced was paid in $US and in accordance with the Company\u2019s Gas Sales Agreement (GSA) with\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/07\/kiliwani-north-well.png?fit=525%2C519&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/07\/kiliwani-north-well.png?fit=525%2C519&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/07\/kiliwani-north-well.png?fit=525%2C519&ssl=1&resize=525%2C300 1.5x"},"classes":[]}],"jetpack_sharing_enabled":true,"jetpack_likes_enabled":true,"_links":{"self":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/6982","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/comments?post=6982"}],"version-history":[{"count":1,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/6982\/revisions"}],"predecessor-version":[{"id":6983,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/6982\/revisions\/6983"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media\/4803"}],"wp:attachment":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media?parent=6982"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/categories?post=6982"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/tags?post=6982"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}