{"id":6954,"date":"2018-04-17T06:55:09","date_gmt":"2018-04-17T06:55:09","guid":{"rendered":"http:\/\/www.oilnewskenya.com\/?p=6954"},"modified":"2018-04-17T06:55:09","modified_gmt":"2018-04-17T06:55:09","slug":"drilling-lamus-pate-island-commence-week","status":"publish","type":"post","link":"https:\/\/www.oilnewskenya.com\/index.php\/drilling-lamus-pate-island-commence-week\/","title":{"rendered":"Drilling in Lamu\u2019s Pate Island to Commence This Week"},"content":{"rendered":"<p>Zarara Oil and Gas is set to spud the Pate 2 well in Lamu\u2019s Block 4 this weekend using a Drilling Services \u00a0top hole drilling rig of 750hp to a depth of 300 meters OilNews Kenya has learnt. The rig which set sail from the Mombasa port yesterday aboard a barge is expected to spud both the Pate 2 and Pate 3 wells in the next fortnight with each well expected to reach the 300 meters depth in a period of five days after drilling begins.<\/p>\n<p>The decision to start off with a top hole drilling rig is to beat the set deadline of 30th April as to when the company has to spud the Pate 2 well as the 2600hp Sakson SK604 rig which will complete the well to a maximum depth of 4500 meters faced delays in inspection and is currently on transit to a Tunisia Port from its earlier location in Algeria 800 kilometers onshore. From there it will set sail to Kenya either through the Mombasa port or the nearby Lamu port.<\/p>\n<figure id=\"attachment_6959\" aria-describedby=\"caption-attachment-6959\" style=\"width: 300px\" class=\"wp-caption alignleft\"><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" class=\"wp-image-6959 size-medium\" src=\"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2018\/04\/IMG_2101-300x200.jpg?resize=300%2C200&#038;ssl=1\" alt=\"\" width=\"300\" height=\"200\" srcset=\"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2018\/04\/IMG_2101-scaled.jpg?resize=300%2C200&amp;ssl=1 300w, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2018\/04\/IMG_2101-scaled.jpg?resize=600%2C400&amp;ssl=1 600w, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2018\/04\/IMG_2101-scaled.jpg?resize=100%2C67&amp;ssl=1 100w, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2018\/04\/IMG_2101-scaled.jpg?resize=768%2C512&amp;ssl=1 768w, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2018\/04\/IMG_2101-scaled.jpg?resize=1024%2C683&amp;ssl=1 1024w, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2018\/04\/IMG_2101-scaled.jpg?w=2340&amp;ssl=1 2340w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><figcaption id=\"caption-attachment-6959\" class=\"wp-caption-text\">Camps at the Pate 2 &amp; 3 drilling sites<\/figcaption><\/figure>\n<p>The drilling site has been ready since late November with the earlier spud date deadline set for 30th December 2017 which was missed after the earlier contracted rig from Greatwall Drilling was unavailable following a fallout between the two companies. Since then security teams as well as hospitality staff have been in the camp awaiting a new rig.<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" class=\"wp-image-6957 size-medium alignleft\" src=\"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2018\/04\/pate-1-well-PA-300x200.png?resize=300%2C200&#038;ssl=1\" alt=\"\" width=\"300\" height=\"200\" srcset=\"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2018\/04\/pate-1-well-PA.png?resize=300%2C200&amp;ssl=1 300w, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2018\/04\/pate-1-well-PA.png?resize=100%2C67&amp;ssl=1 100w, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2018\/04\/pate-1-well-PA.png?resize=480%2C321&amp;ssl=1 480w, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2018\/04\/pate-1-well-PA.png?w=599&amp;ssl=1 599w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/>Blocks L4 and L13 operated by Zarara Oil and Gas are believed to be gas prone acreage that have in the past seen discoveries by Shell\/BP and are valued to have current estimated unrisked volumes of gas in place of 1.5TcF capable of supporting a 900MW combined cycle gas turbine power station for 25 years .<\/p>\n<p>Zarara Oil and Gas the operator of blocks L4 and L13 is currently operating under a <a href=\"https:\/\/bit.ly\/2HGwZ8a\">second extension<\/a> to the former\u00a0<a href=\"http:\/\/bit.ly\/2tRbZ7f\">extension<\/a>\u00a0by the Ministry of Petroleum and Mining to enable them to drill a well in Pate Island. The second extension means the contract will now expire on 2nd April 2019 four months after the earlier 2nd December 2018 expiry.<\/p>\n<p>Already OilNews Kenya had reported that the company has\u00a0<a href=\"http:\/\/bit.ly\/2setuR6\">contracted<\/a>\u00a0Norwegian company North Sea Well Engineering Limited\u00a0(Norwell Engineering) as the design and planning company that will ensure everything goes as plotted. Other companies contracted as reported include:\u00a0 Medivac-Kenya which will provide medical services to the workers in camps while corporate security company and risk management contractor Salama Fikira will be in charge of security all of which are already on site.<\/p>\n<p>Zarara Oil and Gas Limited (\u2018Zarara\u2019) which holds a 75% working interest is a 100% subsidiary of Midway Resources. CH-Swiss Oil Holdings International holds 15% and the National Oil Company of Kenya at 10%. MRI has negotiated a legally binding heads of agreement for the eventual acquisition of the 15% interest of CH-Swiss Oil Holdings.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Zarara Oil and Gas is set to spud the Pate 2 well in Lamu\u2019s Block 4 this weekend using a Drilling Services \u00a0top hole drilling rig of 750hp to a &hellip; <a href=\"https:\/\/www.oilnewskenya.com\/index.php\/drilling-lamus-pate-island-commence-week\/\" class=\"more-link\">Read More<\/a><\/p>\n","protected":false},"author":24,"featured_media":6956,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[11],"tags":[1376,5814,3512,3510,6868,2765],"class_list":["post-6954","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-top-news","tag-lamu","tag-pate-3","tag-pate-island","tag-pate-2","tag-sakson-rig","tag-zarara-oil-and-gas","entry"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2018\/04\/zarara-sign-board.png?fit=516%2C346&ssl=1","jetpack_shortlink":"https:\/\/wp.me\/p5JWkQ-1Oa","jetpack-related-posts":[{"id":7091,"url":"https:\/\/www.oilnewskenya.com\/index.php\/pate-2-continued-drilling-set-continue-august-sakson-rig-arrives-mombasa\/","url_meta":{"origin":6954,"position":0},"title":"Pate 2 Well Drilling Set to Continue in August as Sakson Rig Arrives in Mombasa","author":"","date":"June 26, 2018","format":false,"excerpt":"Drilling of Pate 2 well in Lamu's Block L4 could continue this late July or early August after the much awaited ship carrying the 2600hp Sakson SK604 rig arrived in Mombasa last week. The rig will then head off to Mtandawanda port in Lamu East aboard a barge hired from\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2018\/06\/SK-604.png?fit=294%2C401&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":7078,"url":"https:\/\/www.oilnewskenya.com\/index.php\/pate-2-3-wells-face-delays-sakson-kenyan-agent-head-court\/","url_meta":{"origin":6954,"position":1},"title":"Exclusive: Pate 2 &#038; 3 Wells Could Face Further Delays As Sakson &#038; Kenyan Agent Head to Court","author":"","date":"June 19, 2018","format":false,"excerpt":"The continuation of Pate 2 and 3 wells in Lamu\u2019s block L4 is in doubt after the rig owner Sakson Drilling & Oil Services and its Kenyan agent Gas & Oil Exploration Consultants Limited (GASOILEX) fell out over unpaid commissions as part of the mobilization fee and as an agent\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2018\/04\/IMG-20180426-WA0030.jpg?fit=774%2C1032&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2018\/04\/IMG-20180426-WA0030.jpg?fit=774%2C1032&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2018\/04\/IMG-20180426-WA0030.jpg?fit=774%2C1032&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2018\/04\/IMG-20180426-WA0030.jpg?fit=774%2C1032&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":7180,"url":"https:\/\/www.oilnewskenya.com\/index.php\/pate-2-well-drilling-schedule-reach-total-depth-mid-october\/","url_meta":{"origin":6954,"position":2},"title":"Pate 2 Well Drilling On Schedule to Reach Total Depth in Mid October","author":"","date":"September 18, 2018","format":false,"excerpt":"The Ongoing drilling of the Pate 2 well in Lamu\u2019s Pate Island in Block L4 is continuing as scheduled according to Zarara Oil and Gas country manager Peter Nduru with drilling expected to reach the total depth mid next month. According to Mr Nduru the well which is being drilled\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2018\/06\/SK-604.png?fit=294%2C401&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":6792,"url":"https:\/\/www.oilnewskenya.com\/index.php\/zarara-oil-gas-awarded-4-month-license-extension-kenyas-blocks-l4-l13\/","url_meta":{"origin":6954,"position":3},"title":"Zarara Oil and Gas Awarded 4 month License Extension in Kenya\u2019s Blocks L4 &#038; L13","author":"","date":"February 1, 2018","format":false,"excerpt":"Zarara Oil and Gas the operator of blocks L4 and L13 has received a second extension to the current extension by the Ministry of Petroleum and Mining to enable them to drill a well in Pate Island earlier planned for drilling by 31st December 2017.The second extension means the contract\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/10\/Pate-2-3.png?fit=528%2C477&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/10\/Pate-2-3.png?fit=528%2C477&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/10\/Pate-2-3.png?fit=528%2C477&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":6979,"url":"https:\/\/www.oilnewskenya.com\/index.php\/zarara-spuds-initial-well-blocks-l4-l13-kenya-pate-drilling-campaign\/","url_meta":{"origin":6954,"position":4},"title":"Zarara Spuds Initial Well in Blocks L4 &#038; L13 Kenya For Pate Drilling Campaign","author":"","date":"April 26, 2018","format":false,"excerpt":"Zarara Oil & Gas Limited (\u201cZarara\u201d), a wholly owned subsidiary of Midway Resources International, announces the spudding today of Pate-2 well, that commences its Pate Drilling Campaign on its production sharing contracts (\u201cPSCs\u201d) on blocks L4 andL13 in Kenya. The blocks are located in the coastal region near Port Lamu,\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2018\/04\/IMG-20180426-WA0030.jpg?fit=774%2C1032&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2018\/04\/IMG-20180426-WA0030.jpg?fit=774%2C1032&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2018\/04\/IMG-20180426-WA0030.jpg?fit=774%2C1032&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2018\/04\/IMG-20180426-WA0030.jpg?fit=774%2C1032&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":5993,"url":"https:\/\/www.oilnewskenya.com\/index.php\/chinas-greatwall-bags-lamus-pate-2-well-drilling-contract\/","url_meta":{"origin":6954,"position":5},"title":"China\u2019s Greatwall Bags Lamu\u2019s Pate 2 Well Drilling Contract","author":"","date":"May 23, 2017","format":false,"excerpt":"Greatwall Drilling Company Ltd has been contracted to drill Pate 2 well in Zarara Oil and Gas operated Block L4 scheduled to spud later in the year according to sources. The Chinese driller beat a team of other companies including Dubai based Sakson Drilling & Oil Services earlier involved in\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/10\/Pate-2-3.png?fit=528%2C477&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/10\/Pate-2-3.png?fit=528%2C477&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/10\/Pate-2-3.png?fit=528%2C477&ssl=1&resize=525%2C300 1.5x"},"classes":[]}],"jetpack_sharing_enabled":true,"jetpack_likes_enabled":true,"_links":{"self":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/6954","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/comments?post=6954"}],"version-history":[{"count":1,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/6954\/revisions"}],"predecessor-version":[{"id":6960,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/6954\/revisions\/6960"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media\/6956"}],"wp:attachment":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media?parent=6954"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/categories?post=6954"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/tags?post=6954"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}