{"id":6934,"date":"2018-04-09T09:50:06","date_gmt":"2018-04-09T09:50:06","guid":{"rendered":"http:\/\/www.oilnewskenya.com\/?p=6934"},"modified":"2018-04-09T09:50:06","modified_gmt":"2018-04-09T09:50:06","slug":"ntorya-3-renamed-chikumbi-1-as-drilling-nears","status":"publish","type":"post","link":"https:\/\/www.oilnewskenya.com\/index.php\/ntorya-3-renamed-chikumbi-1-as-drilling-nears\/","title":{"rendered":"Ntorya 3 Renamed Chikumbi-1 As Drilling Nears"},"content":{"rendered":"<p>The planned Ntorya 3 well in Tanzania\u2019s the Ntorya appraisal area will now be renamed Chikumbi-1 well at the request of the Tanzanian Government according to operator Aminex.<\/p>\n<p>According to Aminex the well targeting the same reservoir tested in Ntorya-1 and in Ntorya-2 in an updip position will also be testing a deeper target at the proposed total depth is approx. 3,400 metres. Ntorya-3 well is expected to be drilled 5.65km west of Ntorya-1.<\/p>\n<p><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" class=\"alignleft wp-image-6812 size-medium\" src=\"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2018\/02\/Ntorya-3-Geological-Section-300x154.jpg?resize=300%2C154&#038;ssl=1\" alt=\"\" width=\"300\" height=\"154\" srcset=\"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2018\/02\/Ntorya-3-Geological-Section.jpg?resize=300%2C154&amp;ssl=1 300w, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2018\/02\/Ntorya-3-Geological-Section.jpg?resize=600%2C308&amp;ssl=1 600w, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2018\/02\/Ntorya-3-Geological-Section.jpg?resize=100%2C51&amp;ssl=1 100w, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2018\/02\/Ntorya-3-Geological-Section.jpg?resize=768%2C395&amp;ssl=1 768w, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2018\/02\/Ntorya-3-Geological-Section.jpg?resize=887%2C456&amp;ssl=1 887w, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2018\/02\/Ntorya-3-Geological-Section.jpg?resize=480%2C247&amp;ssl=1 480w, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2018\/02\/Ntorya-3-Geological-Section.jpg?w=891&amp;ssl=1 891w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/>Further on Ntorya 3 Aminex says the tendering process for a rig to drill Chikumbi-1 is due to close during the current quarter with an expected spud date later in the year, exact timing of which will be dependent on rig availability.<\/p>\n<p>Meanwhile the National Environment Management Council (NEMC) has approved the Environmental Impact Assessment (EIA) status for the acquisition of further 2D and 3D seismic data over the Ruvuma Production Sharing Agreement acreage, focusing on the Ntorya discovery area. This new seismic will enable the acquisition of up to 700 square kilometres of new 3D seismic in the deep water.<\/p>\n<p>Aminex adds continues to be in advanced discussions for a farm-out transaction at Ruvuma, including the Ntorya appraisal area, with an affiliate of the Zubair Corporation, Eclipse Investments LLC one of Oman\u2019s leading business groups.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The planned Ntorya 3 well in Tanzania\u2019s the Ntorya appraisal area will now be renamed Chikumbi-1 well at the request of the Tanzanian Government according to operator Aminex. According to &hellip; <a href=\"https:\/\/www.oilnewskenya.com\/index.php\/ntorya-3-renamed-chikumbi-1-as-drilling-nears\/\" class=\"more-link\">Read More<\/a><\/p>\n","protected":false},"author":24,"featured_media":4620,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[11],"tags":[137,6853,4373,2466],"class_list":["post-6934","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-top-news","tag-aminex","tag-chikumbi-1","tag-ntorya-3","tag-tanzania","entry"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/04\/Ntorya-Gross-Thickness-Map.png?fit=375%2C443&ssl=1","jetpack_shortlink":"https:\/\/wp.me\/p5JWkQ-1NQ","jetpack-related-posts":[{"id":7160,"url":"https:\/\/www.oilnewskenya.com\/index.php\/tanzania-chikumbi-1-well-drilling-nears-rig-bids-tendering-complete\/","url_meta":{"origin":6934,"position":0},"title":"Tanzania Chikumbi 1 Well Drilling Nears As Rig Bids Tendering Complete","author":"","date":"August 27, 2018","format":false,"excerpt":"The tendering process for a rig to drill\u00a0Chikumbi-1 (CH-1)\u00a0is now complete according to Aminex with the company having received numerous bids. These bids are being evaluated on their technical and commercial merits. CH-1 which is located up-dip from both the Ntorya-1 discovery well, which tested at rates of up to\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2018\/08\/Chikumbi-1.png?fit=353%2C461&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":7299,"url":"https:\/\/www.oilnewskenya.com\/index.php\/sakson-awarded-contract-drill-chikumbi-1-well-tanzanias-ruvuma-psa\/","url_meta":{"origin":6934,"position":1},"title":"Sakson Awarded Contract to Drill the Chikumbi-1 Well in Tanzania\u2019s Ruvuma PSA","author":"","date":"December 17, 2018","format":false,"excerpt":"Aminex has advanced drilling and seismic programmes over the Ruvuma PSA acreage while it progresses satisfaction of conditions required to close out a farm-out agreement signed with the Zubair Group in early July 2018 according to its latest update. The Company has finalised the Chikumbi-1 executive drilling and completions programmes,\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2018\/02\/Aminex-Presentation.jpg?fit=954%2C594&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2018\/02\/Aminex-Presentation.jpg?fit=954%2C594&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2018\/02\/Aminex-Presentation.jpg?fit=954%2C594&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2018\/02\/Aminex-Presentation.jpg?fit=954%2C594&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":15163,"url":"https:\/\/www.oilnewskenya.com\/index.php\/tanzania-work-on-the-ntorya-pipeline-to-commence-this-month\/","url_meta":{"origin":6934,"position":2},"title":"TANZANIA: Work on the Ntorya Pipeline to Commence this month","author":"","date":"July 17, 2025","format":false,"excerpt":"Aminex has provided the following operations update on the Ntorya development: \u00b7\u00a0\u00a0\u00a0\u00a0At the end of last week, the\u00a0Tanzania Petroleum Development Corporation (TPDC)\u00a0formally notified the operator of the Ntorya development (ARA Petroleum Tanzania Limited\u00a0(APT)) that construction of the pipeline from the Ntorya gas field to the Ntorya gas field(the Pipeline) shall\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/02\/EACOP-Pipeline-construction-2.jpg?fit=800%2C533&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/02\/EACOP-Pipeline-construction-2.jpg?fit=800%2C533&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/02\/EACOP-Pipeline-construction-2.jpg?fit=800%2C533&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/02\/EACOP-Pipeline-construction-2.jpg?fit=800%2C533&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":13379,"url":"https:\/\/www.oilnewskenya.com\/index.php\/tanzania-ara-petroleum-to-delay-spudding-of-chikumbi-1-as-3d-seismic-processing-interpretation-continues\/","url_meta":{"origin":6934,"position":3},"title":"TANZANIA: ARA Petroleum to Delay Spudding of Chikumbi-1 as 3D Seismic Processing &#038; Interpretation Continues","author":"","date":"March 2, 2023","format":false,"excerpt":"Aminex reports that has been informed by ARA Petroleum Tanzania Limited (APT), theOperator of the Ruvuma PSA, of a further delay to the spudding of the Chikumbi-1 well (CH-1). Aminexis pleased to announce that plans to accelerate gas production, as outlined in our announcement of 1November 2022, have been further\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/03\/Chikumbi-1-well.jpg?fit=1200%2C741&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/03\/Chikumbi-1-well.jpg?fit=1200%2C741&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/03\/Chikumbi-1-well.jpg?fit=1200%2C741&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/03\/Chikumbi-1-well.jpg?fit=1200%2C741&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/03\/Chikumbi-1-well.jpg?fit=1200%2C741&ssl=1&resize=1050%2C600 3x"},"classes":[]},{"id":14160,"url":"https:\/\/www.oilnewskenya.com\/index.php\/tanzania-ruvuma-gas-sales-agreement-signed\/","url_meta":{"origin":6934,"position":4},"title":"TANZANIA: Ruvuma Gas Sales Agreement Signed","author":"","date":"January 11, 2024","format":false,"excerpt":"Aminex PLC has announce that a gas sales agreement (GSA) for the sale of gas from the Ntorya location was signed by the Company\u2019s subsidiary, Ndovu Resources Limited, together with the operator, ARA Petroleum Tanzania Limited (APT) and the Tanzania Petroleum Development Corporation (TPDC). Key terms of the GSA include:\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2024\/01\/Tanzania-Ruvuma.png?fit=541%2C542&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2024\/01\/Tanzania-Ruvuma.png?fit=541%2C542&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2024\/01\/Tanzania-Ruvuma.png?fit=541%2C542&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":12765,"url":"https:\/\/www.oilnewskenya.com\/index.php\/tanzania-chikumbi-1-drilling-pushed-to-march-2023\/","url_meta":{"origin":6934,"position":5},"title":"TANZANIA: Chikumbi-1 Drilling Pushed to March 2023","author":"","date":"November 1, 2022","format":false,"excerpt":"Aminex reports that it has been informed of a delay to the spud date of the forthcoming Chikumbi-1 (CH-1) well by the operator, ARA Petroleum Tanzania Limited (APT). Due to ongoing negotiations with the Tanzanian authorities and contractors, Aminex has been advised that the expected spud date for CH-1 has\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/10\/Chikumbi-1-well.jpg?fit=1200%2C741&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/10\/Chikumbi-1-well.jpg?fit=1200%2C741&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/10\/Chikumbi-1-well.jpg?fit=1200%2C741&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/10\/Chikumbi-1-well.jpg?fit=1200%2C741&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/10\/Chikumbi-1-well.jpg?fit=1200%2C741&ssl=1&resize=1050%2C600 3x"},"classes":[]}],"jetpack_sharing_enabled":true,"jetpack_likes_enabled":true,"_links":{"self":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/6934","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/comments?post=6934"}],"version-history":[{"count":1,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/6934\/revisions"}],"predecessor-version":[{"id":6935,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/6934\/revisions\/6935"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media\/4620"}],"wp:attachment":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media?parent=6934"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/categories?post=6934"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/tags?post=6934"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}