{"id":6864,"date":"2018-02-28T06:53:20","date_gmt":"2018-02-28T06:53:20","guid":{"rendered":"http:\/\/www.oilnewskenya.com\/?p=6864"},"modified":"2018-02-28T06:53:20","modified_gmt":"2018-02-28T06:53:20","slug":"kjv-plans-2-phased-development-kenyas-south-lokichar-fields","status":"publish","type":"post","link":"https:\/\/www.oilnewskenya.com\/index.php\/kjv-plans-2-phased-development-kenyas-south-lokichar-fields\/","title":{"rendered":"KJV Plans 2 Phased Development in Kenya&#8217;s South Lokichar Fields"},"content":{"rendered":"<p>The Kenya joint venture partners (KJV) comprising of Tullow Oil, Africa Oil, Maersk O&amp;G and the Kenya government are now aligned on phased development that will limit upfront capital expenditures while allowing a Kenyan export pipeline to move forward.<br \/>\n<img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-6865 alignleft\" src=\"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2018\/02\/Phased-Development-Plan-lokichar.png?resize=323%2C400&#038;ssl=1\" alt=\"\" width=\"323\" height=\"400\" srcset=\"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2018\/02\/Phased-Development-Plan-lokichar.png?w=323&amp;ssl=1 323w, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2018\/02\/Phased-Development-Plan-lokichar.png?resize=81%2C100&amp;ssl=1 81w, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2018\/02\/Phased-Development-Plan-lokichar.png?resize=242%2C300&amp;ssl=1 242w\" sizes=\"auto, (max-width: 323px) 100vw, 323px\" \/>According to a report by Africa Oil the South Lokichar Developement phases include Phase 1 \u2013 Amosing and Ngamia Sweet Spots with a targeted production of 60 &#8211; 80k BOPD to utilise 240mmbbl while Phase 2 (contingent) western fields with an estimated 560mmbbl cumulative and phase3 (Contingent) of Northern Fields and Exploration Upside targets a production of between 100-120k BOPD.<br \/>\nThe South Lokichar Development phase 1 targets a first oil date of 2021\/2022 with the KJV is planning to reach a final investment decision of 2019.<br \/>\nPhase 1 targeting the Amosing and Ngamia oilfields plans to develop high productivity Auwerwer reservoirs in main fields and allows export pipeline to move forward to unlock basin potential with minimal upfront investment.Overall it is estimated that the KJV will need to inject just under $3 billion down from the earlier planned full western fields development estimated to cost $7 billion in April 2015.These costs include: wells, upstream facilities and the pipeline.<br \/>\nAccording to the phase 1 concept plan the KJV envisages 210 wells at the Ngamia field drilled from 18 pads and 70 wells at the Amosing field drilled from 7 pads and connected to the single central processing facility by a 14 inch trunkline. From the single CPF an 18 inch pipeline will evacuate oil (through an optimised route which can hopefully cut the distance by 50km)to the Lamu port where an offshore storage and loading facility is being considered with an estimated cost reduction of $150 million.Earlier an onshore tank farm located at Lamu and SPM loading facility had been envisaged.<br \/>\nPhase 2 rides on well and field performance which will allow additional phases to be better defined and funded primarily from cash flow resulting from the first phase. KJV further expects costs to be greatly reduced as pipeline and central processing facility will be in phase with incremental unit development planned thereafter. By phase 2 it is also expected that more marginal reservoirs and remote fields will become highly economic.<br \/>\nAmong the cost saving measures foreseen include the deferring inter-field pipelines, excess water handling and development wells allowing additional time to upgrade resources including exploration volumes.Other measures that could be introduced include reduced insulation, electrical line heating and pumpstations, increased module and equipment size as opposed to many modules and equipments among others. The reductions could also include more development wells drilled from fewer wellpads. With the various cost reductions November 2017 show an initial development figures could drop to $1.3 billion to first oil down from 2.2 billion as per the April 2015 estimates.<br \/>\nThe first phase according to the report is also expected to run between the first oil date and 2024\/2025 before production for phase two kicks in with the timeline for production running beyond 2044 when the production license is expected to expire<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Kenya joint venture partners (KJV) comprising of Tullow Oil, Africa Oil, Maersk O&amp;G and the Kenya government are now aligned on phased development that will limit upfront capital expenditures &hellip; <a href=\"https:\/\/www.oilnewskenya.com\/index.php\/kjv-plans-2-phased-development-kenyas-south-lokichar-fields\/\" class=\"more-link\">Read More<\/a><\/p>\n","protected":false},"author":24,"featured_media":6866,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[11],"tags":[70,138,4510,3183,896,6791,6792,6795,6793,1732,2042,6794,2412,2571,6796],"class_list":["post-6864","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-top-news","tag-africa-oil","tag-amosing","tag-central-processing-facility","tag-final-investment-decision","tag-first-oil","tag-kenya-joint-venture","tag-kjv","tag-loading","tag-maersk-og","tag-ngamia","tag-pipeline","tag-south-lokichar-field","tag-storage","tag-tullow-oil","tag-wellpads","entry"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2018\/02\/Lokichar-Development-Concept.png?fit=642%2C474&ssl=1","jetpack_shortlink":"https:\/\/wp.me\/p5JWkQ-1MI","jetpack-related-posts":[{"id":5381,"url":"https:\/\/www.oilnewskenya.com\/index.php\/execution-of-jda-between-kenya-jv-partners-to-commence-by-year-end\/","url_meta":{"origin":6864,"position":0},"title":"Execution of JDA between Kenya, JV partners to Commence by Year-End","author":"","date":"November 9, 2016","format":false,"excerpt":"Tullow Oil has reported that it expects the Joint Development Agreement (JDA) setting out a structure for the Government of Kenya and the Kenya Joint Venture Partners (Maersk Oil, Africa Oil) to progress the development of the export pipeline to commence execution by year-end. According to the latest trading update\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/02\/KE-1316-Etuko-1-Marriott-PR46-Rig-2429-3.jpg?fit=512%2C768&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":7585,"url":"https:\/\/www.oilnewskenya.com\/index.php\/kenya-government-gazettes-land-for-south-lokichar-basin-oil-project\/","url_meta":{"origin":6864,"position":1},"title":"Kenya Government Gazettes Land for South Lokichar Basin Oil Project","author":"","date":"February 19, 2019","format":false,"excerpt":"The National Land Commission (NLC) on behalf of the Ministry of Petroleum & Mining, State Department of Petroleum has gazetted 6348Ha of land to be used in the South Lokichar basin oil project in Turkana county","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2019\/02\/South-Lokichar-Phase-1.png?fit=414%2C512&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":3120,"url":"https:\/\/www.oilnewskenya.com\/index.php\/tullow-oil-africa-oil-report-positive-results-kenyas-appraisal-drilling-well-testing\/","url_meta":{"origin":6864,"position":2},"title":"Tullow Oil, Africa Oil report positive results from Kenya\u2019s appraisal drilling, Well testing","author":"","date":"July 1, 2015","format":false,"excerpt":"In the latest update by Block 10BB and 13T joint venture partners Tullow Oil and Africa Oil appraisal drilling and Extended Well Tests (EWT) continue to produce\u00a0positive results. The Amosing EWT which commenced in May testing five reservoir zones in the field across two wells, in one well the production\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/07\/Mariott-Rig-with-watermark.jpg?fit=900%2C1200&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/07\/Mariott-Rig-with-watermark.jpg?fit=900%2C1200&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/07\/Mariott-Rig-with-watermark.jpg?fit=900%2C1200&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/07\/Mariott-Rig-with-watermark.jpg?fit=900%2C1200&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":6500,"url":"https:\/\/www.oilnewskenya.com\/index.php\/amosing-7-well-successful-exploration-appraisal-drilling-south-lokichar-concludes\/","url_meta":{"origin":6864,"position":3},"title":"Amosing 7 Well Successful As Exploration and Appraisal Drilling In South Lokichar Concludes","author":"","date":"November 8, 2017","format":false,"excerpt":"The Amosing 7 appraisal well drilled using the Marriot Rig 46 has encountered 25 meters of net oil and gas pay concluding the 2017 exploration and appraisal drilling campaign\u00a0on a high. The Ngamia-11 appraisal well (143 meters of net oil pay) has also been completed and will be utilized in\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2017\/11\/IMG-20171012-WA0083.jpg?fit=1200%2C800&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2017\/11\/IMG-20171012-WA0083.jpg?fit=1200%2C800&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2017\/11\/IMG-20171012-WA0083.jpg?fit=1200%2C800&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2017\/11\/IMG-20171012-WA0083.jpg?fit=1200%2C800&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2017\/11\/IMG-20171012-WA0083.jpg?fit=1200%2C800&ssl=1&resize=1050%2C600 3x"},"classes":[]},{"id":5759,"url":"https:\/\/www.oilnewskenya.com\/index.php\/early-oil-pilot-scheme-can-proceed-as-tullow-oil-kenya-government-sign-agreements\/","url_meta":{"origin":6864,"position":4},"title":"Early Oil Pilot Scheme To Proceed as Tullow Oil, Kenya Government Sign Agreements","author":"","date":"March 14, 2017","format":false,"excerpt":"Transportation of oil from the South Lokichar region namely the Amosing and Ngamia oilfields can commence following the signing of an agreement between the Kenyan government and the joint venture partners namely Tullow Oil, Africa Oil and Maersk Oil and Gas on Tuesday. According to a statement released after the\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/07\/truck-ransport.jpg?fit=1200%2C550&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/07\/truck-ransport.jpg?fit=1200%2C550&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/07\/truck-ransport.jpg?fit=1200%2C550&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/07\/truck-ransport.jpg?fit=1200%2C550&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/07\/truck-ransport.jpg?fit=1200%2C550&ssl=1&resize=1050%2C600 3x"},"classes":[]},{"id":6827,"url":"https:\/\/www.oilnewskenya.com\/index.php\/new-assessment-resources-south-lokichar-shows-25-lower-reported\/","url_meta":{"origin":6864,"position":5},"title":"New Assessment of Resources in South Lokichar Shows 25% lower Than Reported","author":"","date":"February 7, 2018","format":false,"excerpt":"A new full assessment of all the exploration and appraisal data, Tullow estimates that the South Lokichar basin contains the following recoverable resources 560mmbo 2C down from 766mmbo reported earlier by DeGolyer and MacNaughton Canada Limited (DMCL).The best 3C recoverable resources have also been downplayed to 1,230 mmbo from 1630mmbo\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/02\/KE-1316-Etuko-1-Marriott-PR46-Rig-2429-3.jpg?fit=512%2C768&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]}],"jetpack_sharing_enabled":true,"jetpack_likes_enabled":true,"_links":{"self":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/6864","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/comments?post=6864"}],"version-history":[{"count":1,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/6864\/revisions"}],"predecessor-version":[{"id":6867,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/6864\/revisions\/6867"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media\/6866"}],"wp:attachment":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media?parent=6864"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/categories?post=6864"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/tags?post=6864"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}