{"id":6839,"date":"2018-02-14T12:28:02","date_gmt":"2018-02-14T12:28:02","guid":{"rendered":"http:\/\/www.oilnewskenya.com\/?p=6839"},"modified":"2018-02-14T12:28:02","modified_gmt":"2018-02-14T12:28:02","slug":"technical-attributes-east-africa-crude-oil-pipeline-tanzania-segment","status":"publish","type":"post","link":"https:\/\/www.oilnewskenya.com\/index.php\/technical-attributes-east-africa-crude-oil-pipeline-tanzania-segment\/","title":{"rendered":"Technical Attributes Of East Africa Crude Oil Pipeline (Tanzania Segment)"},"content":{"rendered":"<p><strong>Tanzania Pipeline Segment \u2013 Uganda Border to Chongoleani peninsula in Tanzania Marine Storage Terminal<\/strong><\/p>\n<p>&#8211; 1155 KM of 24\u201d pipe = 96,250 joints : 177,627 Tons<\/p>\n<p>&#8211; Divided into two Lots: Lot 2 = 614 km Lot 3 = 533 km<\/p>\n<p>&#8211; 60 main line block valves for sectional isolation<\/p>\n<p>&#8211; 62.8 KM of Temporary Access Roads<\/p>\n<p>&#8211; 33.7 KM of Permanent Access Roads w\/existing roads upgrades<\/p>\n<p>&#8211; Ten (10) Temporary Pipeline Construction Camps<\/p>\n<p>&#8211; 939 KM of 33 kV Power Cabling for Heat Trace power input- 1155 km of fiber optic cabling<\/p>\n<p>&#8211; 3465 KM of 6.6 kV single phase EHT Cabling<\/p>\n<p><strong>Tanzania Pipeline Facilities<\/strong><\/p>\n<p>&#8211; 4 Crude Oil Pump Stations with capability of 216 kbopd<\/p>\n<p>&#8211; 2 Pressure Reduction Stations<\/p>\n<p>&#8211; Four (4) Temporary Construction Camps at Pump Stations<\/p>\n<p>&#8211; One Temporary Construction Camp at the Marine Terminal One Temporary Construction Camp at the Marine Terminal<\/p>\n<p>&#8211; Fifteen (15) Pre-Fabricated Engineered Electrical Heat Trace Substations<\/p>\n<p>&#8211; Integrated SCADA\/ICS system with redundant control functions at Tilenga and MST via fiber optic cabling &amp; telecommunications<\/p>\n<p>&#8211; 5 x 500k barrel crude oil storage tanks<\/p>\n<p>&#8211; Marine Terminal with capability of exporting 1,000,000 barrel in 24 hours export to SUEZMAX class tanker 2 KM Offshore Jetty &amp; Crude Oil Load Out Platform 28<\/p>\n<p>&#8211; 2 KM Offshore Jetty &amp; Crude Oil Load-Out Platform<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Tanzania Pipeline Segment \u2013 Uganda Border to Chongoleani peninsula in Tanzania Marine Storage Terminal &#8211; 1155 KM of 24\u201d pipe = 96,250 joints : 177,627 Tons &#8211; Divided into two &hellip; <a href=\"https:\/\/www.oilnewskenya.com\/index.php\/technical-attributes-east-africa-crude-oil-pipeline-tanzania-segment\/\" class=\"more-link\">Read More<\/a><\/p>\n","protected":false},"author":24,"featured_media":6840,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[11],"tags":[6763,538,6178,673,6708,6764,2042,6765,2466],"class_list":["post-6839","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-top-news","tag-camps","tag-crude-oil","tag-eacop","tag-east-africa-crude-oil-pipeline","tag-fiber-optic-cabling","tag-joints","tag-pipeline","tag-power-cabling","tag-tanzania","entry"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2018\/02\/EACOP-Tanzania.jpg?fit=876%2C503&ssl=1","jetpack_shortlink":"https:\/\/wp.me\/p5JWkQ-1Mj","jetpack-related-posts":[{"id":6788,"url":"https:\/\/www.oilnewskenya.com\/index.php\/eacop-big-test-opportunity-regional-logistics-players\/","url_meta":{"origin":6839,"position":0},"title":"EACOP A Big Test and Opportunity for Regional Logistics Players","author":"","date":"February 1, 2018","format":false,"excerpt":"The East Africa Crude Oil pipeline to be constructed between Hoima Uganda and Tanga in Tanzania a distance spanning 1445 kilometers is expected to have a flow rate of 216kbpd and will need over 500,000 tonnes of imported equipment to complete. This infrastructure is expected to provide a huge opportunity\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2018\/02\/pipes-logistics.jpg?fit=429%2C337&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":5707,"url":"https:\/\/www.oilnewskenya.com\/index.php\/mfri-forms-a-consortium-with-logstor-to-bid-the-east-africa-crude-oil-pipeline-eacop-project\/","url_meta":{"origin":6839,"position":1},"title":"MFRI forms a Consortium with Logstor to bid the East Africa Crude Oil Pipeline (EACOP) Project","author":"","date":"February 23, 2017","format":false,"excerpt":"Global leader in pre-insulated piping and leak detection systems for oil and gas\u00a0MFRI, has announced that its Perma-Pipe subsidiary has formed a consortium with Danish company Logstor to bid the East Africa Crude Oil Pipeline (EACOP) project. The EACOP project a 1450 Km (900 mile) long heavy crude oil pipeline\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/10\/Kenya-Uganda-pipeline-design-1.jpg?fit=900%2C610&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/10\/Kenya-Uganda-pipeline-design-1.jpg?fit=900%2C610&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/10\/Kenya-Uganda-pipeline-design-1.jpg?fit=900%2C610&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/10\/Kenya-Uganda-pipeline-design-1.jpg?fit=900%2C610&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":5549,"url":"https:\/\/www.oilnewskenya.com\/index.php\/gulf-interstate-engineering-bags-uganda-tanzania-crude-oil-pipeline-design-contract\/","url_meta":{"origin":6839,"position":2},"title":"Gulf Interstate Engineering Bags Uganda-Tanzania Crude Oil Pipeline Design Contract","author":"","date":"January 12, 2017","format":false,"excerpt":"Houston based\u00a0 Gulf Interstate Engineering which specializes in project management, engineering and design, procurement and material and construction management services for oil and gas production, transportation and storage systems has been awarded the contract to design the Uganda Tanzania crude oil pipeline according to Reuters. The company will be tasked\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2017\/01\/Gulf-Interstate.jpg?fit=683%2C376&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2017\/01\/Gulf-Interstate.jpg?fit=683%2C376&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2017\/01\/Gulf-Interstate.jpg?fit=683%2C376&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":14191,"url":"https:\/\/www.oilnewskenya.com\/index.php\/uganda-details-revealed-of-worlds-longest-heated-crude-oil-pipeline-using-hi-tech-satellite-technology-to-minimise-environmental-damage-threat\/","url_meta":{"origin":6839,"position":3},"title":"UGANDA: Details Revealed of World\u2019s Longest Heated Crude Oil Pipeline Using Hi-Tech Satellite Technology to Minimise Environmental Damage Threat","author":"","date":"November 27, 2023","format":false,"excerpt":"Details of what will be the world\u2019s longest heated crude oil pipeline, carrying oil from Uganda to the Indian Ocean coast of Tanzania, have been revealed showing how a cocoon of electrical and fibre-optic cables along its entire 1,443 km length will provide heat and real-time satellite surveillance to prevent\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2024\/01\/EACOP.jpg?fit=1200%2C849&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2024\/01\/EACOP.jpg?fit=1200%2C849&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2024\/01\/EACOP.jpg?fit=1200%2C849&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2024\/01\/EACOP.jpg?fit=1200%2C849&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2024\/01\/EACOP.jpg?fit=1200%2C849&ssl=1&resize=1050%2C600 3x"},"classes":[]},{"id":13195,"url":"https:\/\/www.oilnewskenya.com\/index.php\/uganda-approves-eacop-construction-license\/","url_meta":{"origin":6839,"position":4},"title":"Uganda Approves EACOP Construction License","author":"","date":"January 24, 2023","format":false,"excerpt":"Construction of the world's longest crude oil heat traced pipeline is finally set to kick off after the Ugandan cabinet gave a go-ahead for its construction six months after the East African Crude Oil Pipeline Company (EACOP) Ltd applied for a construction license. The construction license will enable the company\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/01\/EACOP-Application-License.png?fit=825%2C394&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/01\/EACOP-Application-License.png?fit=825%2C394&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/01\/EACOP-Application-License.png?fit=825%2C394&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/01\/EACOP-Application-License.png?fit=825%2C394&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":14155,"url":"https:\/\/www.oilnewskenya.com\/index.php\/tanzania-east-african-crude-oil-pipeline-eacop-announces-delivery-of-first-100km-line-pipe\/","url_meta":{"origin":6839,"position":5},"title":"TANZANIA: East African Crude Oil Pipeline (EACOP) Announces Delivery of First 100KM Line Pipe","author":"","date":"December 12, 2023","format":false,"excerpt":"The East African Crude Oil Pipeline (EACOP) announces the arrival at the port of Dar es Salaam of the first shipment of 100km of line pipe, signalling the initiation of the main construction phase for this cross-border pipeline project.\u00a0 An event to mark the occasion was held today between EACOP\u2019s\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2024\/01\/EACOP-1.png?fit=733%2C395&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2024\/01\/EACOP-1.png?fit=733%2C395&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2024\/01\/EACOP-1.png?fit=733%2C395&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2024\/01\/EACOP-1.png?fit=733%2C395&ssl=1&resize=700%2C400 2x"},"classes":[]}],"jetpack_sharing_enabled":true,"jetpack_likes_enabled":true,"_links":{"self":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/6839","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/comments?post=6839"}],"version-history":[{"count":1,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/6839\/revisions"}],"predecessor-version":[{"id":6841,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/6839\/revisions\/6841"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media\/6840"}],"wp:attachment":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media?parent=6839"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/categories?post=6839"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/tags?post=6839"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}