{"id":6702,"date":"2018-01-18T11:36:15","date_gmt":"2018-01-18T11:36:15","guid":{"rendered":"http:\/\/www.oilnewskenya.com\/?p=6702"},"modified":"2018-01-18T11:36:15","modified_gmt":"2018-01-18T11:36:15","slug":"kenya-starts-search-design-contractor-2-billion-crude-oil-pipeline","status":"publish","type":"post","link":"https:\/\/www.oilnewskenya.com\/index.php\/kenya-starts-search-design-contractor-2-billion-crude-oil-pipeline\/","title":{"rendered":"Kenya starts Search for Design Contractor for its $2 billion Crude Oil Pipeline"},"content":{"rendered":"<p>The Ministry of Energy and Petroleum has invited eight bids from firms hoping to undertake the Front End Engineering Design (FEED) for the planned 892 kilometer crude oil pipeline between South Lokichar oil fields in Turkana and Lamu port.<\/p>\n<p>According to principal secretary in charge of the state department on petroleum Andrew Kamau the eight companies were selected from a pool of engineering firms who submitted applications to be prequalified for the pipeline design after the ministry sent out an expression of interest in 2016.<\/p>\n<p>The FEED will include a study on the design of the pipeline the route, basic engineering and will also formulate basic technical requirements as well as inform technical requirements and the investments needed to put up the pipeline.<\/p>\n<p>Once the bids are submitted Kamau expects the contract will be awarded by end of April with the actual work expected to complete by January 2019.<\/p>\n<p>Once the design has been submitted it is expected that the construction of the pipeline will commence in 2019 and take two years to complete.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Ministry of Energy and Petroleum has invited eight bids from firms hoping to undertake the Front End Engineering Design (FEED) for the planned 892 kilometer crude oil pipeline between &hellip; <a href=\"https:\/\/www.oilnewskenya.com\/index.php\/kenya-starts-search-design-contractor-2-billion-crude-oil-pipeline\/\" class=\"more-link\">Read More<\/a><\/p>\n","protected":false},"author":24,"featured_media":3902,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[11],"tags":[4615,539,3234,5512,1252,1589,6670],"class_list":["post-6702","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-top-news","tag-andrew-kamau","tag-crude-oil-pipeline","tag-feed","tag-front-end-engineering-design","tag-kenya","tag-ministry-of-energy-and-petroleum","tag-south-lokichar-oil-fields","entry"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/10\/Kenya-Uganda-pipeline-design-1.jpg?fit=900%2C610&ssl=1","jetpack_shortlink":"https:\/\/wp.me\/p5JWkQ-1K6","jetpack-related-posts":[{"id":7035,"url":"https:\/\/www.oilnewskenya.com\/index.php\/wood-awarded-feed-contract-kenyas-lokichar-lamu-crude-oil-pipeline\/","url_meta":{"origin":6702,"position":0},"title":"Wood awarded FEED contract for Kenya\u2019s Lokichar to Lamu Crude Oil Pipeline","author":"","date":"May 31, 2018","format":false,"excerpt":"Wood has been awarded the initial phase of a front-end engineering design contract (FEED) by Tullow Kenya BV for the design of the proposed 892 kilometers long Lokichar to Lamu Crude Oil Pipeline project located in Kenya. Wood will provide the first phase of FEED services, setting the technical requirements\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2017\/10\/Energy-CS-Charles-Keter-right-signing-the-Joint-Development-Study-Agreement-JDA-for-the-proposed-Lokichar-Lamu-crude-oil-pipeline.-Left-Martin-Mbogo-Country-Manager-Tullow-Oil.jpg?fit=844%2C680&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2017\/10\/Energy-CS-Charles-Keter-right-signing-the-Joint-Development-Study-Agreement-JDA-for-the-proposed-Lokichar-Lamu-crude-oil-pipeline.-Left-Martin-Mbogo-Country-Manager-Tullow-Oil.jpg?fit=844%2C680&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2017\/10\/Energy-CS-Charles-Keter-right-signing-the-Joint-Development-Study-Agreement-JDA-for-the-proposed-Lokichar-Lamu-crude-oil-pipeline.-Left-Martin-Mbogo-Country-Manager-Tullow-Oil.jpg?fit=844%2C680&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2017\/10\/Energy-CS-Charles-Keter-right-signing-the-Joint-Development-Study-Agreement-JDA-for-the-proposed-Lokichar-Lamu-crude-oil-pipeline.-Left-Martin-Mbogo-Country-Manager-Tullow-Oil.jpg?fit=844%2C680&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":6452,"url":"https:\/\/www.oilnewskenya.com\/index.php\/kenya-joint-venture-partners-sign-joint-development-study-agreement-crude-oil-pipeline\/","url_meta":{"origin":6702,"position":1},"title":"Kenya Joint Venture Partners Sign the Joint Development Study Agreement for the Crude Oil Pipeline","author":"","date":"October 24, 2017","format":false,"excerpt":"The Lokichar-Lamu crude oil pipeline today took a significant step forward following the signing of a Joint Development Study Agreement (JDA) between the Government of Kenya and Tullow Oil, Africa Oil and Maersk Oil (KJV Partners), to carry out a study for\u00a0the proposed 820 km crude oil pipeline. The joint\u00a0development\u00a0\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2017\/10\/Energy-CS-Charles-Keter-right-signing-the-Joint-Development-Study-Agreement-JDA-for-the-proposed-Lokichar-Lamu-crude-oil-pipeline.-Left-Martin-Mbogo-Country-Manager-Tullow-Oil.jpg?fit=844%2C680&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2017\/10\/Energy-CS-Charles-Keter-right-signing-the-Joint-Development-Study-Agreement-JDA-for-the-proposed-Lokichar-Lamu-crude-oil-pipeline.-Left-Martin-Mbogo-Country-Manager-Tullow-Oil.jpg?fit=844%2C680&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2017\/10\/Energy-CS-Charles-Keter-right-signing-the-Joint-Development-Study-Agreement-JDA-for-the-proposed-Lokichar-Lamu-crude-oil-pipeline.-Left-Martin-Mbogo-Country-Manager-Tullow-Oil.jpg?fit=844%2C680&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2017\/10\/Energy-CS-Charles-Keter-right-signing-the-Joint-Development-Study-Agreement-JDA-for-the-proposed-Lokichar-Lamu-crude-oil-pipeline.-Left-Martin-Mbogo-Country-Manager-Tullow-Oil.jpg?fit=844%2C680&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":2067,"url":"https:\/\/www.oilnewskenya.com\/index.php\/toyota-tshusho-named-oil-pipeline-lead-consultant\/","url_meta":{"origin":6702,"position":2},"title":"Toyota Tshusho named oil pipeline lead consultant","author":"Samuel Kamau Mbote","date":"November 19, 2014","format":false,"excerpt":"[twitter-follow screen_name='oilnewskenya'] Toyota Tshusho Engineering Corporation will design and carry out a feasibility study for the construction of a crude pipeline between Hoima to the Kenyan coast after the company won the tender. The company that signed the contract last week in Kampala submitted a design that would see the\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/07\/trans-alaska-oil-pipeline-11-17848.jpg?fit=300%2C200&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":3221,"url":"https:\/\/www.oilnewskenya.com\/index.php\/kenya-uganda-agree-crude-oil-pipeline-route\/","url_meta":{"origin":6702,"position":3},"title":"Kenya, Uganda agree on crude oil pipeline route","author":"","date":"August 9, 2015","format":false,"excerpt":"The governments of Kenya and Uganda have announced that they have agreed on the route to be taken by the crude oil pipeline that will transport oil from the Albertine and Lokichar basins. The announcement comes as Kenya\u2019s president Uhuru Kenyatta continues his visit in Uganda where he has signed\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/05\/Crude-Oil-Pipeline-Map.png?fit=456%2C551&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":6816,"url":"https:\/\/www.oilnewskenya.com\/index.php\/construction-crude-oil-early-production-facility-starts-turkana\/","url_meta":{"origin":6702,"position":4},"title":"Construction Of Crude Oil Early Production Facility Starts in Turkana","author":"","date":"February 7, 2018","format":false,"excerpt":"Dubai based Almansoori Petroleum Company has started the construction of an early Production Facility (EPF) at Amosing that will help block operator Tullow Oil\u00a0 start the production of oil in South Lokichar under the Early Oil Pilot Scheme (EOPS) according to Ministry of Petroleum and Mining Principal Secretary Andrew Kamau.\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2018\/02\/EOPS-Early-Production-Facility-2.jpg?fit=534%2C401&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2018\/02\/EOPS-Early-Production-Facility-2.jpg?fit=534%2C401&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2018\/02\/EOPS-Early-Production-Facility-2.jpg?fit=534%2C401&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":2931,"url":"https:\/\/www.oilnewskenya.com\/index.php\/search-east-africas-crude-oil-pipeline-builder-start-6-months\/","url_meta":{"origin":6702,"position":5},"title":"Search for East Africa\u2019s Crude Oil Pipeline Builder to start in 6 Months","author":"","date":"May 18, 2015","format":false,"excerpt":"The search for the builder for the 1300km pipeline running from Uganda\u2019s Hoima region through Lokichar in Turkana all the way to the Kenyan coast will commence in six months according to Ministry of Energy and Petroleum principal secretary Joseph Njoroge. This follows the completion of the feasibility studies by\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"Crude Oil Pipeline Map","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/05\/Crude-Oil-Pipeline-Map.png?resize=350%2C200","width":350,"height":200},"classes":[]}],"jetpack_sharing_enabled":true,"jetpack_likes_enabled":true,"_links":{"self":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/6702","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/comments?post=6702"}],"version-history":[{"count":1,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/6702\/revisions"}],"predecessor-version":[{"id":6703,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/6702\/revisions\/6703"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media\/3902"}],"wp:attachment":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media?parent=6702"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/categories?post=6702"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/tags?post=6702"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}