{"id":6575,"date":"2017-11-29T11:20:48","date_gmt":"2017-11-29T11:20:48","guid":{"rendered":"http:\/\/www.oilnewskenya.com\/?p=6575"},"modified":"2017-11-29T12:04:47","modified_gmt":"2017-11-29T12:04:47","slug":"uganda-lures-drc-east-africa-crude-oil-project","status":"publish","type":"post","link":"https:\/\/www.oilnewskenya.com\/index.php\/uganda-lures-drc-east-africa-crude-oil-project\/","title":{"rendered":"Uganda Lures DRC into the East Africa Crude Oil Project"},"content":{"rendered":"<p>The Uganda government is trying to interest the Democratic Republic of Congo to use the East Africa crude oil project (EACOP) to export its oil. Earlier this week\u00a0Minister of Energy and Mineral Development, Eng Irene Muloni hosted a delegation of Congolese Officials led by the DRC Minister of Hydrocarbons Prof Aimer Ngoi Mukena Lusa Diese here in Kampala to strengthen the bilateral relations and corporations between them in the energy sector.<\/p>\n<p><a href=\"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2017\/11\/Uganda-DRC-EACOP.jpg?ssl=1\"><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-6576 alignleft\" src=\"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2017\/11\/Uganda-DRC-EACOP-300x201.jpg?resize=300%2C201&#038;ssl=1\" alt=\"\" width=\"300\" height=\"201\" srcset=\"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2017\/11\/Uganda-DRC-EACOP.jpg?resize=300%2C201&amp;ssl=1 300w, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2017\/11\/Uganda-DRC-EACOP.jpg?resize=600%2C401&amp;ssl=1 600w, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2017\/11\/Uganda-DRC-EACOP.jpg?resize=100%2C67&amp;ssl=1 100w, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2017\/11\/Uganda-DRC-EACOP.jpg?resize=768%2C514&amp;ssl=1 768w, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2017\/11\/Uganda-DRC-EACOP.jpg?resize=887%2C593&amp;ssl=1 887w, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2017\/11\/Uganda-DRC-EACOP.jpg?resize=480%2C321&amp;ssl=1 480w, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2017\/11\/Uganda-DRC-EACOP.jpg?w=960&amp;ssl=1 960w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a><\/p>\n<p>The two countries which share the oil rich Albertine Graben also head discussions on how best the two countries\u00a0can work jointly in the exploration and development of oil fields.<\/p>\n<p>Another factor on the need to include the DRC onto the pipeline project is the fact that French oil giant Total E&amp;P which has said it will help finance the\u00a0East Africa crude oil project holds blocks in both countries thus a scenario of shared resources could help any oil discoveries in DRC get to the market faster. While Total already has oil discoveries in Uganda together with joint venture partners CNOOC and Tullow Oil its DRC block III which has seen <a href=\"http:\/\/bit.ly\/2dHD7SE\">2D seismic<\/a> acquisition in 2016 alongside of SacOil.<\/p>\n<p>Notably there is an existing a<a href=\"http:\/\/bit.ly\/2iiZL6D\">greement<\/a> between Tanzania and DRC on joint exploration\u00a0and development of hydrocarbons in Lake Tanganyika the world\u2019s second largest by volume and second deepest with Tanzania having stakes in the East Africa crude oil project .<\/p>\n<p data-reactid=\"36\">The EACOP route begins Kabaale-Hoima in Uganda and extends to the Chongoleani Peninsula near the Tanga port some 1445 kilometers at a cost of $3.5 billion. The pipeline has a capacity to transport 216kbd and is expected to be commissioned in 2020<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Uganda government is trying to interest the Democratic Republic of Congo to use the East Africa crude oil project (EACOP) to export its oil. Earlier this week\u00a0Minister of Energy &hellip; <a href=\"https:\/\/www.oilnewskenya.com\/index.php\/uganda-lures-drc-east-africa-crude-oil-project\/\" class=\"more-link\">Read More<\/a><\/p>\n","protected":false},"author":24,"featured_media":6577,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[11],"tags":[117,3703,476,582,6178,6375,2831,1366,4229,1581,6603,2217,2533,2571],"class_list":["post-6575","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-top-news","tag-albertine-graben","tag-block-iii","tag-cnooc","tag-democratic-republic-of-congo","tag-eacop","tag-east-africa-crude-oil-project","tag-eng-irene-muloni","tag-lake-albert","tag-minister-of-energy-and-mineral-development","tag-minister-of-hydrocarbons","tag-prof-aimer-ngoi-mukena-lusa-diese","tag-sacoil","tag-total","tag-tullow-oil","entry"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2017\/11\/EACOP-route.jpg?fit=632%2C563&ssl=1","jetpack_shortlink":"https:\/\/wp.me\/p5JWkQ-1I3","jetpack-related-posts":[{"id":6012,"url":"https:\/\/www.oilnewskenya.com\/index.php\/uganda-tanzania-sign-inter-governmental-agreement-east-african-crude-oil-pipeline\/","url_meta":{"origin":6575,"position":0},"title":"Uganda,Tanzania sign Inter Governmental Agreement for Crude Oil Pipeline","author":"","date":"May 27, 2017","format":false,"excerpt":"The Governments of Uganda and of Tanzania have signed the Inter-Governmental Agreement (IGA) for the East African Crude Oil Pipeline (EACOP) Project. The IGA was signed by Uganda\u2019s Eng. Irene Muloni, Minister of Energy and Mineral Development and Tanzania\u2019s Hon. Prof. Palamagamba John A.M Kabudi, Minister for Constitutional and Legal\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2017\/05\/EACOP-IGA-signing-by-Uganda-Tanzania-Ministers.jpg?fit=472%2C315&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":5099,"url":"https:\/\/www.oilnewskenya.com\/index.php\/uganda-issues-8-production-licences-to-tullow-and-total-ep\/","url_meta":{"origin":6575,"position":1},"title":"Uganda Issues 8 production licences to Tullow and Total E&#038;P","author":"","date":"August 30, 2016","format":false,"excerpt":"Uganda\u2019s minister for energy and minerals Eng Irene Muloni, has issued 8 production licences to Tullow and Total E&P. Muloni re-echoed the need to fast track the production which she says is expected to start by 2020. Speaking during the signing of the addendum to existing Production Sharing Agreements for\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/08\/Irene-Muloni.jpg?fit=960%2C540&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/08\/Irene-Muloni.jpg?fit=960%2C540&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/08\/Irene-Muloni.jpg?fit=960%2C540&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/08\/Irene-Muloni.jpg?fit=960%2C540&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":3005,"url":"https:\/\/www.oilnewskenya.com\/index.php\/uganda-extends-deadline-submission-applications-qualification-first-petroleum-licensing-round\/","url_meta":{"origin":6575,"position":2},"title":"Uganda Extends Deadline for Submission of Applications for Qualification for First Petroleum Licensing Round","author":"","date":"May 21, 2015","format":false,"excerpt":"The ministry of energy and mineral development has announced that it extended the closing date for receipt of applications for qualification has been extended by a month from 29th May to 30th June 2015. In the announcement by permanent secretary Kabagambe-Kaliisa the extension will to allow interested applicants more time\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"Uganda oil blocks","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/05\/Uganda-oil-blocks.png?resize=350%2C200","width":350,"height":200},"classes":[]},{"id":3931,"url":"https:\/\/www.oilnewskenya.com\/index.php\/democratic-republic-of-congo-extends-total-ep-license-in-the-albertine-graben\/","url_meta":{"origin":6575,"position":3},"title":"Democratic Republic of Congo extends Total E&#038;P license in the Albertine Graben","author":"","date":"October 21, 2015","format":false,"excerpt":"Democratic Republic of Congo Block III operator Total E&P has reported that its application to the Ministry of Hydrocarbons of the Democratic Republic of Congo for an extension of the current license has been successful with the latter granting a two year addition. The current license period on the Block\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/10\/DRC-Block-3.jpg?fit=507%2C478&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":467,"url":"https:\/\/www.oilnewskenya.com\/index.php\/uganda-to-sign-memo-with-oil-firms-over-production-ministry\/","url_meta":{"origin":6575,"position":4},"title":"Uganda to sign memo with oil firms over production-ministry","author":"Samuel Kamau Mbote","date":"February 6, 2014","format":false,"excerpt":"Source: Reuters Uganda will sign a memorandum of understanding on Thursday with Britain's Tullow Oil, France's Total and China's CNOOC, an Energy Ministry spokesman said, in a vital step towards starting oil production in the country East Africa's third-largest\u00a0economy\u00a0struck hydrocarbon deposits in 2006 but commercial production has been delayed and\u2026","rel":"","context":"In &quot;News by others&quot;","block_context":{"text":"News by others","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/news-by-others\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/02\/minister-eng-irene-muloni.jpg?fit=480%2C322&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":4363,"url":"https:\/\/www.oilnewskenya.com\/index.php\/total-commences-2d-seismic-data-acquisition-block-iii-albertine-graben-drc\/","url_meta":{"origin":6575,"position":5},"title":"Total Commences 2D Seismic Data Acquisition, Block III, Albertine Graben, DRC","author":"","date":"February 17, 2016","format":false,"excerpt":"Democratic Republic of Congo Block III operator Total E&P has announced he has commenced with the acquisition of a 2D seismic survey following the granting of a two-year extension to current exploration period by the Minister of Hydrocarbons. Total will under the current survey design envisage the acquisition of 300\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/10\/Block-III-DRC.jpg?fit=455%2C455&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]}],"jetpack_sharing_enabled":true,"jetpack_likes_enabled":true,"_links":{"self":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/6575","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/comments?post=6575"}],"version-history":[{"count":3,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/6575\/revisions"}],"predecessor-version":[{"id":6580,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/6575\/revisions\/6580"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media\/6577"}],"wp:attachment":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media?parent=6575"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/categories?post=6575"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/tags?post=6575"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}