{"id":6561,"date":"2017-11-22T08:16:34","date_gmt":"2017-11-22T08:16:34","guid":{"rendered":"http:\/\/www.oilnewskenya.com\/?p=6561"},"modified":"2017-11-22T08:16:34","modified_gmt":"2017-11-22T08:16:34","slug":"simba-essel-acquire-3d-seismic-kenyas-block-2a-ahead-drilling","status":"publish","type":"post","link":"https:\/\/www.oilnewskenya.com\/index.php\/simba-essel-acquire-3d-seismic-kenyas-block-2a-ahead-drilling\/","title":{"rendered":"Simba Essel to Acquire 3D Seismic in Kenya\u2019s Block 2A Ahead of Drilling"},"content":{"rendered":"<p>Simba Essel has announced that following a review of the Sproule report, (the 51-101 report) it now plans to proceed with a 3D seismic program covering approximately 160 square kilometers over its most promising area in early 2018 as OilNews Kenya had earlier <a href=\"http:\/\/bit.ly\/2iFH8qh\">reported<\/a>.<\/p>\n<p>The 3D seismic is expected to help further delineate and identify the best drilling targets on block 2-A out of the highest ranking targets identified by the Sproule report which identified 29 prospect leads following 2D seismic in Q1 2016. The report revealed that many of the prospects and leads are coincidental to the same structural event and are stacked one on top of the other. This means a single well can evaluate 2 or 3 prospects or leads.<\/p>\n<p>In addition to the 3D seismic Simba Essel has said it will be proceeding with plans to bring a <a href=\"http:\/\/bit.ly\/2c2Jafr\">drilling rig<\/a> into Kenya and mobilize the rig on block 2-A in Wajir. Essel Group Middle East (EGME) adds it also intends to commence with site preparation early in 2018 in preparation for the drill program which will occur in the second half of 2018.<\/p>\n<p>The exploration well of approximately 3,000 metres in 2018 will test two or more intervals, part of fulfilling its drilling commitment to the production sharing contract on Block 2A. The recent\u00a0<a href=\"http:\/\/bit.ly\/2paY1uV\">seismic interpretation<\/a>\u00a0identified five main horizons the youngest of these, Ken 6 was interpreted to be lower Jurassic (Liassic) in age.Four other deeper seismic markers of uncertain age were also evaluated. These horizons are from youngest to oldest, Ken 5\u00a0(Triassic), Post-Rift, Upper Syn-Rift, Lower Syn-Rift and Basement.<\/p>\n<p>Already negotiations are underway regarding a loan facility with a financial institution in Kenya for $40 million USD to fund on-going operating expenses including the planned drill program later in 2018 according to EGME.<\/p>\n<p>Essel Group Middle East had in 2015 announced it has entered into a definitive agreement to acquire a new skid mounted drilling rig with DNV GL, the world-leading classification society and risk management Company, being appointed as a third party observer to oversee the purchase and the delivery of the AC-VFD drilling rig.<\/p>\n<p>In total the\u00a0gross unrisked undiscovered petroleum initially in-place is 437.7 MMboe according to the completed a\u00a0<a href=\"http:\/\/bit.ly\/2A5j2eY\">NI 51-101 report<\/a>\u00a0for Block 2A in Wajir by Sproule International Limited.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Simba Essel has announced that following a review of the Sproule report, (the 51-101 report) it now plans to proceed with a 3D seismic program covering approximately 160 square kilometers &hellip; <a href=\"https:\/\/www.oilnewskenya.com\/index.php\/simba-essel-acquire-3d-seismic-kenyas-block-2a-ahead-drilling\/\" class=\"more-link\">Read More<\/a><\/p>\n","protected":false},"author":24,"featured_media":6481,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[11],"tags":[26,34,273,637,5021,2272,6096,6596,2695],"class_list":["post-6561","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-top-news","tag-2d-seismic","tag-3d-seismic","tag-block-2a","tag-drilling","tag-rig","tag-seismic","tag-simba-essel","tag-sproule-report","tag-wajir","entry"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2017\/11\/Block-2A-seismic.jpg?fit=1000%2C563&ssl=1","jetpack_shortlink":"https:\/\/wp.me\/p5JWkQ-1HP","jetpack-related-posts":[{"id":6480,"url":"https:\/\/www.oilnewskenya.com\/index.php\/simba-essel-carry-additional-seismic-kenyas-block-2a-ahead-of-drilling\/","url_meta":{"origin":6561,"position":0},"title":"Simba Essel to carry out Additional Seismic in Kenya\u2019s Block 2A Ahead of Drilling","author":"","date":"November 4, 2017","format":false,"excerpt":"Simba Essel has said it is contemplating additional\u00a0seismic to further detail prospects identified in the last 2D seismic acquisition programme and to choose the best location for drilling with the objective being to develop a dual or triple prospect location. The Company which plans to drill an exploration well of\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2017\/11\/Block-2A-seismic.jpg?fit=1000%2C563&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2017\/11\/Block-2A-seismic.jpg?fit=1000%2C563&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2017\/11\/Block-2A-seismic.jpg?fit=1000%2C563&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2017\/11\/Block-2A-seismic.jpg?fit=1000%2C563&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":5978,"url":"https:\/\/www.oilnewskenya.com\/index.php\/essel-engages-sproule-update-new-resource-estimate-block-2a-kenya\/","url_meta":{"origin":6561,"position":1},"title":"Essel Engages Sproule To Update New Resource Estimate On Block 2A, Kenya","author":"","date":"May 18, 2017","format":false,"excerpt":"Simba Essel Energy has announced that its partner \u2013\u00a0Essel Group Middle East (EGME)\u00a0has contracted the services of Sproule International Limited to complete 2D seismic interpretation services, a prospective resource estimate, and an updated NI 51-101 report for block 2A in Wajir,\u00a0Kenya. The scope of work involves an update of Sproule\u2019s\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/08\/block-2a.png?fit=301%2C269&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":7206,"url":"https:\/\/www.oilnewskenya.com\/index.php\/simba-essel-seeks-drilling-permit-block-2a\/","url_meta":{"origin":6561,"position":2},"title":"Simba Essel Seeks Drilling Permit for Block 2A","author":"","date":"October 24, 2018","format":false,"excerpt":"Block 2A operator Simba Essel has submitted a technical presentation to the Ministry as part of their application to obtain a formal permit to drill after review of data pertaining to the interpretation of seismic data from the recent survey which produced a total of five hundred and twenty (520)\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2018\/10\/Block-2A.png?fit=663%2C586&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2018\/10\/Block-2A.png?fit=663%2C586&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2018\/10\/Block-2A.png?fit=663%2C586&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":3274,"url":"https:\/\/www.oilnewskenya.com\/index.php\/simba-energy-gets-kenya-government-greenlight-block-2a-farm-essel-group\/","url_meta":{"origin":6561,"position":3},"title":"Simba Energy Gets Kenya Government Greenlight for Block 2A Farm-in to Essel Group","author":"","date":"August 29, 2015","format":false,"excerpt":"Simba Energy has announced it has received formal approval from the Government of Kenya for its farm-in agreement with Essel Group. Under the terms of the farm-in agreement, Essel Group Middle East (Dubai) will earn a 60% participating interest in Simba's African portfolio, including Block 2A in Kenya, in exchange\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/01\/thumnail_simba_energy.jpg?fit=300%2C200&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":4518,"url":"https:\/\/www.oilnewskenya.com\/index.php\/2d-seismic-in-kenyas-block-2a-to-commence-in-may-2016\/","url_meta":{"origin":6561,"position":4},"title":"2D Seismic in Kenya\u2019s Block 2A To Commence in May 2016","author":"","date":"March 22, 2016","format":false,"excerpt":"Simba Energy has said that through its subsidiary Company Simba Africa Rift Limited together with its farm in partner Essel Group ME (EGME), have agreed that the 2D Seismic Data Acquisition and Processing program will cover approximately 500 line km of survey to commence in early May 2016. Simba says\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"wajir passive seismic","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/03\/wajir-passive-seismic-300x200.jpg?resize=350%2C200","width":350,"height":200},"classes":[]},{"id":4145,"url":"https:\/\/www.oilnewskenya.com\/index.php\/simba-energy-to-acquire-2d-seismic-in-kenyas-block-2a-in-early-2016\/","url_meta":{"origin":6561,"position":5},"title":"Simba Energy to Acquire 2D seismic in Kenya\u2019s Block 2A in Early 2016","author":"","date":"December 1, 2015","format":false,"excerpt":"Block 2A operator Simba Energy has told investors that it plans to start its seismic program in\u00a0 Kenya in early 2016 and is currently coordinating with its new partner Essel Group since the August farm-out. The 2D seismic data is expected to help identify locations to drill initial exploration wells\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/08\/block-2a.png?fit=301%2C269&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]}],"jetpack_sharing_enabled":true,"jetpack_likes_enabled":true,"_links":{"self":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/6561","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/comments?post=6561"}],"version-history":[{"count":1,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/6561\/revisions"}],"predecessor-version":[{"id":6562,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/6561\/revisions\/6562"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media\/6481"}],"wp:attachment":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media?parent=6561"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/categories?post=6561"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/tags?post=6561"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}