{"id":6492,"date":"2017-11-06T09:48:06","date_gmt":"2017-11-06T09:48:06","guid":{"rendered":"http:\/\/www.oilnewskenya.com\/?p=6492"},"modified":"2017-11-06T09:48:06","modified_gmt":"2017-11-06T09:48:06","slug":"aminex-seeks-remedies-kiliwani-north-1-well-pressure-dips","status":"publish","type":"post","link":"https:\/\/www.oilnewskenya.com\/index.php\/aminex-seeks-remedies-kiliwani-north-1-well-pressure-dips\/","title":{"rendered":"Aminex Seeks Remedies as Kiliwani North-1 well Pressure Dips"},"content":{"rendered":"<p>Aminex\u00a0reports that production from the\u00a0Kiliwani North-1\u00a0well (KN-1) is currently fluctuating below 1 million standard cubic feet per day due to low reservoir pressure and inlet pressure restrictions of the gas processing plant.<\/p>\n<p>A review of the existing technical data leads the Company says has led to a conclusion that Kiliwani North-1 is currently draining a compartment within the greater Kiliwani North structure and is exhibiting slow recharge across faults or via tortuous pathways.<\/p>\n<p>Concerned over the decreasing wellhead pressure the Company says it is now in advanced discussions with the Tanzania Petroleum Development Corporation (TPDC) to lower inlet pressure at the gas processing plant and for the installation of compression facilities so as to boost production rates and suitable compressors are currently being sourced.<\/p>\n<p>In September Aminex said it had prepared a programme to re-enter the Kiliwani North-1 well to gather downhole data as a result of the wellhead pressure decline and was reviewing possible alternatives for remediation in the near future to maximise recoverable resources.<\/p>\n<p>According to the operator the Kiliwani North-1 averaged approximately 15 MMcfd during the first six months of 2017.This is a drop from <a href=\"http:\/\/bit.ly\/2bKIUFL\">July 2016<\/a> when the company reported that gas production from the Kiliwani North-1 well in Tanzania reached 30 mmcf per day (approximately 5,000 barrels of oil equivalent per day) with stable pressure recordings at that rate. During the same period Aminex said it ancipated the Songo Songo plant where it was the sole producer would continue to require in excess of 23 mmcf per day to operate.<\/p>\n<p>Already Aminex has notified shareholders that there may eventually be an adjustment to the carrying value of the Kiliwani North asset, which the Company does not at present expect to be material on the 28 bcf of gross resources independently estimated for KN-1 as appeared in the 2017 Half Year Report.<\/p>\n<p>The partners have to date recovered in excess of 6 billion cubic feet (&#8220;bcf\u00a0 from the KN-1 well.<\/p>\n<p>Aminex has 54.575% of the Kiliwani North Development Licence through its 100% owned subsidiary Ndovu Resources Limited alongside RAK Gas LLC 23.75%, Bounty Oil &amp; Gas NL 9.5%, Solo Oil 7.55% and TPDC 5%<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Aminex\u00a0reports that production from the\u00a0Kiliwani North-1\u00a0well (KN-1) is currently fluctuating below 1 million standard cubic feet per day due to low reservoir pressure and inlet pressure restrictions of the gas &hellip; <a href=\"https:\/\/www.oilnewskenya.com\/index.php\/aminex-seeks-remedies-kiliwani-north-1-well-pressure-dips\/\" class=\"more-link\">Read More<\/a><\/p>\n","protected":false},"author":24,"featured_media":4803,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[11],"tags":[137,343,2856,2878,6531,2119,2342,2472,2543,6532],"class_list":["post-6492","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-top-news","tag-aminex","tag-bounty-oil","tag-kiliwani-north-1-well","tag-ndovu-resources-limited","tag-pressure","tag-rak-gas","tag-solo-oil","tag-tanzania-petroleum-development-corporation","tag-tpdc","tag-wellhead-pressure","entry"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/07\/kiliwani-north-well.png?fit=525%2C519&ssl=1","jetpack_shortlink":"https:\/\/wp.me\/p5JWkQ-1GI","jetpack-related-posts":[{"id":4496,"url":"https:\/\/www.oilnewskenya.com\/index.php\/commissioning-of-tanzanias-songo-songo-island-gas-set-for-april-2016\/","url_meta":{"origin":6492,"position":0},"title":"Commissioning of Tanzania\u2019s Songo Songo Island gas plant Set for April 2016","author":"","date":"March 15, 2016","format":false,"excerpt":"The Tanzania Petroleum Development Corporation (TPDC) has provided a revised work schedule in the \u00a0Kiliwani North license and informed the operator Aminex that the commissioning of the Songo Songo Island gas plant is expected to commence in early April. Aminex which concluded the final well integrity testing of the Kiliwani\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/11\/kiliwani-north-1-well.png?fit=493%2C556&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":4551,"url":"https:\/\/www.oilnewskenya.com\/index.php\/gas-production-commences-at-tanzanias-kiliwani-north-gas-field\/","url_meta":{"origin":6492,"position":1},"title":"Gas Production Commences at Tanzania&#8217;s Kiliwani North Gas Field","author":"","date":"April 6, 2016","format":false,"excerpt":"Operator at the the Kiliwani North Development Licence\u00a0 Aminex has announced gas production from its\u00a0Kiliwani North gas field\u2019s Kiliwani North-1 well ('KN-1') \u00a0in Tanzania has commenced on schedule as had earlier been announced. According to Aminex production is expected to build up to an anticipated production rate of 25-30 mmcfd\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/10\/kiliwani-north.jpg?fit=498%2C565&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":4740,"url":"https:\/\/www.oilnewskenya.com\/index.php\/tanzanias-kiliwani-north-well-commissioned\/","url_meta":{"origin":6492,"position":2},"title":"Tanzania&#8217;s Kiliwani North Well Commissioned","author":"","date":"June 6, 2016","format":false,"excerpt":"The Kiliwani North production license operator Ndovu Resources Limited (a subsidiary of Aminex plc) has announced that initial production that\u00a0started in April and the first Kiliwani North-1 (KN-1) gas was processed and entered the pipeline system connecting the Songo Songo plant with the national pipeline on 2nd June. This follows\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/02\/Kiliwani-North.png?fit=379%2C538&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":4246,"url":"https:\/\/www.oilnewskenya.com\/index.php\/aminex-signs-gas-sales-agreement-with-tanzania-government\/","url_meta":{"origin":6492,"position":3},"title":"Aminex signs Gas Sales Agreement with Tanzania Government","author":"","date":"January 13, 2016","format":false,"excerpt":"Aminex is set to start first production in Africa following reports that it has executed a fully-termed Gas Sales Agreement (GSA) with the Tanzania Petroleum Development Corporation (TPDC) for its Kiliwani North gas field. Highlights of the Gas Sales Agreement include: Take-or-pay depletion contract with gas revenues payable in US\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"Mnazi Bay Field","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/01\/Mnazi-Bay-Field.png?resize=350%2C200","width":350,"height":200},"classes":[]},{"id":2577,"url":"https:\/\/www.oilnewskenya.com\/index.php\/tanzania-draws-closer-gas-production-kiliwani-north-1-well\/","url_meta":{"origin":6492,"position":4},"title":"Tanzania draws closer to gas production from the Kiliwani North 1 well","author":"","date":"February 19, 2015","format":false,"excerpt":"Aminex has notified shareholders that the Tanzanian Petroleum Development Corporation (TPDC), through its contractors, has now begun constructing the Skid Metering Unit within the boundaries of the Kiliwani North Development Licence (KNDL) and have completed laying pipe to the KNDL boundary. Once construction is complete the Kiliwani North 1 well\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/10\/kiliwani-north.jpg?fit=498%2C565&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":6668,"url":"https:\/\/www.oilnewskenya.com\/index.php\/kiliwani-north-well-production-decemberaminex-seeking-remedies\/","url_meta":{"origin":6492,"position":5},"title":"Kiliwani North Well Production Up in December,Aminex Seeking Remedies","author":"","date":"January 8, 2018","format":false,"excerpt":"Aminex has reported that the Kiliwani North well produced 95 MMcf of gas during the month of December up from after fluctuating below 1 million standard cubic feet per day in October and November due to low reservoir pressure and inlet pressure restrictions of the gas processing plant. Aminex says\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/07\/kiliwani-north-well-300x297.png?resize=350%2C200","width":350,"height":200},"classes":[]}],"jetpack_sharing_enabled":true,"jetpack_likes_enabled":true,"_links":{"self":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/6492","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/comments?post=6492"}],"version-history":[{"count":1,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/6492\/revisions"}],"predecessor-version":[{"id":6493,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/6492\/revisions\/6493"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media\/4803"}],"wp:attachment":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media?parent=6492"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/categories?post=6492"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/tags?post=6492"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}