{"id":6480,"date":"2017-11-04T03:07:40","date_gmt":"2017-11-04T03:07:40","guid":{"rendered":"http:\/\/www.oilnewskenya.com\/?p=6480"},"modified":"2017-11-04T03:07:40","modified_gmt":"2017-11-04T03:07:40","slug":"simba-essel-carry-additional-seismic-kenyas-block-2a-ahead-of-drilling","status":"publish","type":"post","link":"https:\/\/www.oilnewskenya.com\/index.php\/simba-essel-carry-additional-seismic-kenyas-block-2a-ahead-of-drilling\/","title":{"rendered":"Simba Essel to carry out Additional Seismic in Kenya\u2019s Block 2A Ahead of Drilling"},"content":{"rendered":"<p>Simba Essel has said it is contemplating additional\u00a0seismic to further detail prospects identified in the last <a href=\"http:\/\/bit.ly\/2bkUX78\">2D seismic<\/a> acquisition programme and to choose the best location for drilling with the objective being to develop a dual or triple prospect location.<\/p>\n<p>The Company which plans to drill an exploration well of approximately 3,000 metres in 2018 in Block 2A to test two or more intervals, part of fulfilling its drilling commitment to the production sharing contract on Block 2A, says recent <a href=\"http:\/\/bit.ly\/2paY1uV\">seismic interpretation<\/a> identified five main horizons the youngest of these, Ken 6 was interpreted to be lower Jurassic (Liassic) in age.Four other deeper seismic markers of uncertain age were also evaluated. These horizons are from youngest to oldest, Ken 5\u00a0(Triassic), Post-Rift, Upper Syn-Rift, Lower Syn-Rift and Basement.<\/p>\n<p>Twenty-nine leads and prospects in total have been mapped seismically at the Ken 5, Upper Syn-Rift and Lower-Syn-Rift levels. In conjunction with areas defined on these horizons and reservoir parameters defined from possible analogs, low, best, and high estimates of undiscovered petroleum in-place and prospective resources have been calculated.\u00a0Most of the structural closures can be classified as three-way dip closures bounded by extension faults. In addition, there were number of structural closures in the form of pinching out and four-way dip closures. \u00a0\u00a0In total the\u00a0gross unrisked undiscovered petroleum initially in-place is 437.7 MMboe according to the completed a <a href=\"http:\/\/bit.ly\/2A5j2eY\">NI 51-101 report<\/a> for Block 2A in Wajir by Sproule International Limited.<\/p>\n<p>According to the report by Sproule the portion of the Mandera Basin underlying Block 2A is prospective as it exhibits a petroleum system with a trend of improving reservoir quality upwards in the possible hydrocarbon bearing leads and prospects. Also, the passive seismic which responds to reservoir quality to produce a response also indicates a continuous systemic profile of improving quality. Passive Seismic is used in places like Alberta (Canada) to monitor hydrocarbon front movement in water floods projects.<\/p>\n<p>The agreement between the various reserve parameters over the prospects in terms of contacts and areal extant suggests migration has occurred.\u00a0The Tarbaj oil seep located immediately north of Block 2A \u00a0 suggests the presence of an active petroleum system with oil migrating up dip and being biodegraded as it raises to the surface.<\/p>\n<p>The report further reveals that many of the prospects and leads are coincidental to the same structural event and are stacked one on top of the other. This means a single well can evaluate 2 or 3 prospects or leads.<\/p>\n<p>The completed NI 51-101 report for Block 2A in Wajir, Kenya consists of an assessment of prospective resources of the Company\u2019s interests within the Block 2A in the Mandera Basin in Kenya.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Simba Essel has said it is contemplating additional\u00a0seismic to further detail prospects identified in the last 2D seismic acquisition programme and to choose the best location for drilling with the &hellip; <a href=\"https:\/\/www.oilnewskenya.com\/index.php\/simba-essel-carry-additional-seismic-kenyas-block-2a-ahead-of-drilling\/\" class=\"more-link\">Read More<\/a><\/p>\n","protected":false},"author":24,"featured_media":6481,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[11],"tags":[26,1252,1494,6528,6530,6096,6529,2395,2486,2695],"class_list":["post-6480","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-top-news","tag-2d-seismic","tag-kenya","tag-mandera-basin","tag-ni-51-101-report","tag-passive-sei","tag-simba-essel","tag-smic","tag-sproule-international","tag-tarbaj-oil-seep","tag-wajir","entry"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2017\/11\/Block-2A-seismic.jpg?fit=1000%2C563&ssl=1","jetpack_shortlink":"https:\/\/wp.me\/p5JWkQ-1Gw","jetpack-related-posts":[{"id":6561,"url":"https:\/\/www.oilnewskenya.com\/index.php\/simba-essel-acquire-3d-seismic-kenyas-block-2a-ahead-drilling\/","url_meta":{"origin":6480,"position":0},"title":"Simba Essel to Acquire 3D Seismic in Kenya\u2019s Block 2A Ahead of Drilling","author":"","date":"November 22, 2017","format":false,"excerpt":"Simba Essel has announced that following a review of the Sproule report, (the 51-101 report) it now plans to proceed with a 3D seismic program covering approximately 160 square kilometers over its most promising area in early 2018 as OilNews Kenya had earlier reported. The 3D seismic is expected to\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2017\/11\/Block-2A-seismic.jpg?fit=1000%2C563&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2017\/11\/Block-2A-seismic.jpg?fit=1000%2C563&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2017\/11\/Block-2A-seismic.jpg?fit=1000%2C563&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2017\/11\/Block-2A-seismic.jpg?fit=1000%2C563&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":3274,"url":"https:\/\/www.oilnewskenya.com\/index.php\/simba-energy-gets-kenya-government-greenlight-block-2a-farm-essel-group\/","url_meta":{"origin":6480,"position":1},"title":"Simba Energy Gets Kenya Government Greenlight for Block 2A Farm-in to Essel Group","author":"","date":"August 29, 2015","format":false,"excerpt":"Simba Energy has announced it has received formal approval from the Government of Kenya for its farm-in agreement with Essel Group. Under the terms of the farm-in agreement, Essel Group Middle East (Dubai) will earn a 60% participating interest in Simba's African portfolio, including Block 2A in Kenya, in exchange\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/01\/thumnail_simba_energy.jpg?fit=300%2C200&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":4145,"url":"https:\/\/www.oilnewskenya.com\/index.php\/simba-energy-to-acquire-2d-seismic-in-kenyas-block-2a-in-early-2016\/","url_meta":{"origin":6480,"position":2},"title":"Simba Energy to Acquire 2D seismic in Kenya\u2019s Block 2A in Early 2016","author":"","date":"December 1, 2015","format":false,"excerpt":"Block 2A operator Simba Energy has told investors that it plans to start its seismic program in\u00a0 Kenya in early 2016 and is currently coordinating with its new partner Essel Group since the August farm-out. The 2D seismic data is expected to help identify locations to drill initial exploration wells\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/08\/block-2a.png?fit=301%2C269&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":4518,"url":"https:\/\/www.oilnewskenya.com\/index.php\/2d-seismic-in-kenyas-block-2a-to-commence-in-may-2016\/","url_meta":{"origin":6480,"position":3},"title":"2D Seismic in Kenya\u2019s Block 2A To Commence in May 2016","author":"","date":"March 22, 2016","format":false,"excerpt":"Simba Energy has said that through its subsidiary Company Simba Africa Rift Limited together with its farm in partner Essel Group ME (EGME), have agreed that the 2D Seismic Data Acquisition and Processing program will cover approximately 500 line km of survey to commence in early May 2016. Simba says\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"wajir passive seismic","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/03\/wajir-passive-seismic-300x200.jpg?resize=350%2C200","width":350,"height":200},"classes":[]},{"id":7206,"url":"https:\/\/www.oilnewskenya.com\/index.php\/simba-essel-seeks-drilling-permit-block-2a\/","url_meta":{"origin":6480,"position":4},"title":"Simba Essel Seeks Drilling Permit for Block 2A","author":"","date":"October 24, 2018","format":false,"excerpt":"Block 2A operator Simba Essel has submitted a technical presentation to the Ministry as part of their application to obtain a formal permit to drill after review of data pertaining to the interpretation of seismic data from the recent survey which produced a total of five hundred and twenty (520)\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2018\/10\/Block-2A.png?fit=663%2C586&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2018\/10\/Block-2A.png?fit=663%2C586&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2018\/10\/Block-2A.png?fit=663%2C586&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":4164,"url":"https:\/\/www.oilnewskenya.com\/index.php\/simba-completes-definitive-agreement-with-essel-group-for-block-2a-kenya\/","url_meta":{"origin":6480,"position":5},"title":"Simba Completes Definitive Agreement with Essel Group for Block 2A, Kenya","author":"","date":"December 4, 2015","format":false,"excerpt":"Simba Energy has announced it has executed a definitive farm-out agreement with Essel Group Middle East DMCC on Block 2A in Kenya wherein Essel Group Middle East will earn a 60%participating interest in Block 2A by funding 100% of exploration expenses until the completion of the drilling of 2 conventional\u2026","rel":"","context":"In \"2D seismic\"","block_context":{"text":"2D seismic","link":"https:\/\/www.oilnewskenya.com\/index.php\/tag\/2d-seismic\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/08\/block-2a.png?fit=301%2C269&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]}],"jetpack_sharing_enabled":true,"jetpack_likes_enabled":true,"_links":{"self":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/6480","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/comments?post=6480"}],"version-history":[{"count":1,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/6480\/revisions"}],"predecessor-version":[{"id":6482,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/6480\/revisions\/6482"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media\/6481"}],"wp:attachment":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media?parent=6480"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/categories?post=6480"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/tags?post=6480"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}