{"id":5978,"date":"2017-05-18T21:50:08","date_gmt":"2017-05-18T21:50:08","guid":{"rendered":"http:\/\/www.oilnewskenya.com\/?p=5978"},"modified":"2017-05-18T21:50:08","modified_gmt":"2017-05-18T21:50:08","slug":"essel-engages-sproule-update-new-resource-estimate-block-2a-kenya","status":"publish","type":"post","link":"https:\/\/www.oilnewskenya.com\/index.php\/essel-engages-sproule-update-new-resource-estimate-block-2a-kenya\/","title":{"rendered":"Essel Engages Sproule To Update New Resource Estimate On Block 2A, Kenya"},"content":{"rendered":"<p>Simba Essel Energy has announced that its partner \u2013\u00a0Essel Group Middle East (EGME)\u00a0has contracted the services of Sproule International Limited to complete 2D seismic interpretation services, a prospective resource estimate, and an updated NI 51-101 report for block 2A in Wajir,\u00a0Kenya.<\/p>\n<p>The scope of work involves an update of Sproule\u2019s Block 2A interpretation study conducted in May 2012, along with the inclusion of approximately 535 km of new 2D seismic data that was recently acquired.<\/p>\n<p>Sproule have completed extensive research on the East Africa Rift Systems and have already interpreted all available seismic and well data in the region surrounding Block 2A. By using advanced geophysical software to integrate Simba\u2019s <a href=\"http:\/\/bit.ly\/2qBV0oc\">new 2D seismic acquisition<\/a> along with Simba\u2019s <a href=\"http:\/\/bit.ly\/2n4bTbR\">Full Tensor Gravity<\/a> (FTG) data and Passive Seismic (\u201cIPDS\u201d) data and other historical data Sproule will build upon the existing 2D seismic interpretation project with the additional new data.<\/p>\n<p>The main objectives and desired scope of the updated report includes:<\/p>\n<ul>\n<li>Seismic interpretation on new and legacy seismic lines, including integration with earlier results from <a href=\"http:\/\/bit.ly\/2rwqH2m\">FTG<\/a> and Passive Seismic (IPDS) results.<\/li>\n<li>Identification, evaluation and estimation of volumetrics for all structural leads in the Block.<\/li>\n<li>Ranking of all the identified leads, risk analysis and final integrated report including an independent reserve evaluation in accordance with NI 51-101.<\/li>\n<\/ul>\n<p>The operator has signalled that it hopes to drill a well in the block this year with the 2D seismic expected to narrow down leads for prospective driling sites<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Simba Essel Energy has announced that its partner \u2013\u00a0Essel Group Middle East (EGME)\u00a0has contracted the services of Sproule International Limited to complete 2D seismic interpretation services, a prospective resource estimate, &hellip; <a href=\"https:\/\/www.oilnewskenya.com\/index.php\/essel-engages-sproule-update-new-resource-estimate-block-2a-kenya\/\" class=\"more-link\">Read More<\/a><\/p>\n","protected":false},"author":24,"featured_media":1609,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[11],"tags":[26,273,3299,926,1252,4553,6157,6156,2395,2695],"class_list":["post-5978","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-top-news","tag-2d-seismic","tag-block-2a","tag-essel-group","tag-ftg","tag-kenya","tag-passive-seismic","tag-resource-estimate","tag-simba-essel-energy","tag-sproule-international","tag-wajir","entry"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/08\/block-2a.png?fit=301%2C269&ssl=1","jetpack_shortlink":"https:\/\/wp.me\/p5JWkQ-1yq","jetpack-related-posts":[{"id":6561,"url":"https:\/\/www.oilnewskenya.com\/index.php\/simba-essel-acquire-3d-seismic-kenyas-block-2a-ahead-drilling\/","url_meta":{"origin":5978,"position":0},"title":"Simba Essel to Acquire 3D Seismic in Kenya\u2019s Block 2A Ahead of Drilling","author":"","date":"November 22, 2017","format":false,"excerpt":"Simba Essel has announced that following a review of the Sproule report, (the 51-101 report) it now plans to proceed with a 3D seismic program covering approximately 160 square kilometers over its most promising area in early 2018 as OilNews Kenya had earlier reported. The 3D seismic is expected to\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2017\/11\/Block-2A-seismic.jpg?fit=1000%2C563&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2017\/11\/Block-2A-seismic.jpg?fit=1000%2C563&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2017\/11\/Block-2A-seismic.jpg?fit=1000%2C563&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2017\/11\/Block-2A-seismic.jpg?fit=1000%2C563&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":7206,"url":"https:\/\/www.oilnewskenya.com\/index.php\/simba-essel-seeks-drilling-permit-block-2a\/","url_meta":{"origin":5978,"position":1},"title":"Simba Essel Seeks Drilling Permit for Block 2A","author":"","date":"October 24, 2018","format":false,"excerpt":"Block 2A operator Simba Essel has submitted a technical presentation to the Ministry as part of their application to obtain a formal permit to drill after review of data pertaining to the interpretation of seismic data from the recent survey which produced a total of five hundred and twenty (520)\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2018\/10\/Block-2A.png?fit=663%2C586&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2018\/10\/Block-2A.png?fit=663%2C586&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2018\/10\/Block-2A.png?fit=663%2C586&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":6480,"url":"https:\/\/www.oilnewskenya.com\/index.php\/simba-essel-carry-additional-seismic-kenyas-block-2a-ahead-of-drilling\/","url_meta":{"origin":5978,"position":2},"title":"Simba Essel to carry out Additional Seismic in Kenya\u2019s Block 2A Ahead of Drilling","author":"","date":"November 4, 2017","format":false,"excerpt":"Simba Essel has said it is contemplating additional\u00a0seismic to further detail prospects identified in the last 2D seismic acquisition programme and to choose the best location for drilling with the objective being to develop a dual or triple prospect location. The Company which plans to drill an exploration well of\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2017\/11\/Block-2A-seismic.jpg?fit=1000%2C563&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2017\/11\/Block-2A-seismic.jpg?fit=1000%2C563&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2017\/11\/Block-2A-seismic.jpg?fit=1000%2C563&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2017\/11\/Block-2A-seismic.jpg?fit=1000%2C563&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":5595,"url":"https:\/\/www.oilnewskenya.com\/index.php\/simba-essel-group-middle-east-complete-2d-seismic-data-acquisition-on-block-2-a\/","url_meta":{"origin":5978,"position":3},"title":"Simba, Essel Group Middle East complete 2D seismic data acquisition on block 2-A","author":"","date":"December 16, 2016","format":false,"excerpt":"Simba Energy and\u00a0Essel Group Middle East\u00a0have announced that the 2D seismic acquisition program on Block 2A in Wajir, Kenya has been successfully completed by Africa Geophysical Services Ltd (AGS). The survey has acquired a total of 520 kilometres of 2D seismic data on the block lying within the Mandera basin.\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/08\/block-2a.png?fit=301%2C269&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":4761,"url":"https:\/\/www.oilnewskenya.com\/index.php\/2d-seismic-commences-in-kenyas-block-2a-amid-tension\/","url_meta":{"origin":5978,"position":4},"title":"2D Seismic Commences in Kenya\u2019s Block 2A Amid Tension","author":"","date":"June 16, 2016","format":false,"excerpt":"Simba Energy has announced that survey work on Block 2A commenced on Sunday June 12, 2016 as earlier announced and will be followed in the next ten days by the cutting of the seismic lines, in order that seismic data acquisition can occur. This follows days of opposition by the\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/08\/block-2a.png?fit=301%2C269&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":4518,"url":"https:\/\/www.oilnewskenya.com\/index.php\/2d-seismic-in-kenyas-block-2a-to-commence-in-may-2016\/","url_meta":{"origin":5978,"position":5},"title":"2D Seismic in Kenya\u2019s Block 2A To Commence in May 2016","author":"","date":"March 22, 2016","format":false,"excerpt":"Simba Energy has said that through its subsidiary Company Simba Africa Rift Limited together with its farm in partner Essel Group ME (EGME), have agreed that the 2D Seismic Data Acquisition and Processing program will cover approximately 500 line km of survey to commence in early May 2016. Simba says\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"wajir passive seismic","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/03\/wajir-passive-seismic-300x200.jpg?resize=350%2C200","width":350,"height":200},"classes":[]}],"jetpack_sharing_enabled":true,"jetpack_likes_enabled":true,"_links":{"self":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/5978","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/comments?post=5978"}],"version-history":[{"count":1,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/5978\/revisions"}],"predecessor-version":[{"id":5979,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/5978\/revisions\/5979"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media\/1609"}],"wp:attachment":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media?parent=5978"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/categories?post=5978"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/tags?post=5978"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}