{"id":5923,"date":"2017-05-02T09:21:31","date_gmt":"2017-05-02T09:21:31","guid":{"rendered":"http:\/\/www.oilnewskenya.com\/?p=5923"},"modified":"2017-05-11T09:47:29","modified_gmt":"2017-05-11T09:47:29","slug":"kpc-signs-shs-1-7-billion-for-kisumu-oil-jetty-project","status":"publish","type":"post","link":"https:\/\/www.oilnewskenya.com\/index.php\/kpc-signs-shs-1-7-billion-for-kisumu-oil-jetty-project\/","title":{"rendered":"KPC Signs Shs 1.7 billion for Kisumu Oil Jetty Project"},"content":{"rendered":"<p>Kenya Pipeline Company (KPC) has today signed a Kshs 1.7 billion agreement for the construction of the Kisumu oil jetty.<\/p>\n<p>KPC has awarded the contract to Southern Engineering Company (SECO), a 60-year old Kenyan engineering company, specializing in a range of land &amp; marine, civil, mechanical and structural engineering, containerized camps &amp; hospitality services, heavy lifts and inspections as well as shipbuilding and ship repair services in projects throughout East Africa. SECO is the flagship company of Alpha Group\u2019s Marine Division.<br \/>\nSECO will commence construction the oil jetty this month and will take 6 months to complete the project.<br \/>\nSpeaking during the signing ceremony, KPC Managing Director, Joe Sang said the completion of Kisumu Oil Jetty will increase KPC\u2019s competitive edge in the region as the leading oil transporter.<\/p>\n<p>\u201cThe oil jetty\u2019s target market will create an integrated marine fuel transportation in the region making it more efficient and commercially viable and reduce transportation costs for the oil marketing companies,\u201d said Sang.<br \/>\nThe oil jetty\u2019s target market will be around the lake and expanding the export market into Uganda and mines in northern Tanzania. The project is expected to boost throughput in Kisumu by 1 billion litres a year in phase 1 and up to 3 billion litres per year by 2028.<\/p>\n<p>The jetty has been made possible following the completion of the new Sinendet-Kisumu Pipeline. The line has enhanced petroleum product availability in the Western Kenya and the export market of Uganda, Eastern DRC, Rwanda, Burundi and Northern Tanzania.<br \/>\nThe line has increased product flow to Kisumu depot to 350,000 litres per hour from the previous 110,000 litres per hour increasing the country\u2019s competitive edge in the region as a leading petroleum products exporter.<br \/>\nSang said the Jetty project will also turn Kisumu into a focal point of oil and gas commerce in the region and one of the busiest inland ports in Africa.<\/p>\n<p>\u201cKPC remains focused on becoming a major regional player supporting regional growth by lowering the cost of doing business by ensuring that we operate a cost effective and highly efficient pipeline and related infrastructure system,\u201d said Sang.<\/p>\n<p>KPC in January 2017 placed a notice in the dailies inviting companies to tender for construction of Kisumu oil jetty. After a competitive process that involved six local and foreign bidders, the contract was awarded to SECO.<br \/>\nWith a footprint in several African countries, the engineering company has achieved significant growth through the expansion of its dry docking facilities of a combined capacity of up to 1200 tons and engineering workshops with sophisticated machinery\u2019s to meet the high standards and particular requirements of its clients.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Kenya Pipeline Company (KPC) has today signed a Kshs 1.7 billion agreement for the construction of the Kisumu oil jetty. KPC has awarded the contract to Southern Engineering Company (SECO), &hellip; <a href=\"https:\/\/www.oilnewskenya.com\/index.php\/kpc-signs-shs-1-7-billion-for-kisumu-oil-jetty-project\/\" class=\"more-link\">Read More<\/a><\/p>\n","protected":false},"author":24,"featured_media":5924,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":false,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[11],"tags":[6128,6119,6122,764,6124,6123,6125,4666,1275,6117,3537,1506,6120,6127,6126,6118,6121],"class_list":["post-5923","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-top-news","tag-alpha-group","tag-civil","tag-containerized-camps","tag-engineering","tag-heavy-lifts","tag-hospitality-services","tag-inspections","tag-joe-sang","tag-kenya-pipeline-company","tag-kisumu-oil-jetty","tag-land","tag-marine","tag-mechanical","tag-ship-repair","tag-shipbuilding","tag-southern-engineering-company","tag-structural","entry"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2017\/05\/KPC.jpg?fit=550%2C277&ssl=1","jetpack_shortlink":"https:\/\/wp.me\/p5JWkQ-1xx","jetpack-related-posts":[{"id":6839,"url":"https:\/\/www.oilnewskenya.com\/index.php\/technical-attributes-east-africa-crude-oil-pipeline-tanzania-segment\/","url_meta":{"origin":5923,"position":0},"title":"Technical Attributes Of East Africa Crude Oil Pipeline (Tanzania Segment)","author":"","date":"February 14, 2018","format":false,"excerpt":"Tanzania Pipeline Segment \u2013 Uganda Border to Chongoleani peninsula in Tanzania Marine Storage Terminal - 1155 KM of 24\u201d pipe = 96,250 joints : 177,627 Tons - Divided into two Lots: Lot 2 = 614 km Lot 3 = 533 km - 60 main line block valves for sectional isolation\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2018\/02\/EACOP-Tanzania.jpg?fit=876%2C503&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2018\/02\/EACOP-Tanzania.jpg?fit=876%2C503&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2018\/02\/EACOP-Tanzania.jpg?fit=876%2C503&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2018\/02\/EACOP-Tanzania.jpg?fit=876%2C503&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":762,"url":"https:\/\/www.oilnewskenya.com\/index.php\/kenyan-government-plans-to-increase-petroleum-products-storage-capacity\/","url_meta":{"origin":5923,"position":1},"title":"Kenyan government plans to increase petroleum products storage capacity","author":"Samuel Kamau Mbote","date":"March 21, 2014","format":false,"excerpt":"Kenya hopes to increase its storage capacity of petroleum products by 22 percent in the next 3 years in anticipation of increasing demand and increased product from a new pipeline from Mombasa expected to be complete by 2016. The four tanks to be constructed by the Kenya Petroleum company (KPC)\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/03\/terminals_vttikenya_image_2.jpg?fit=380%2C260&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":4834,"url":"https:\/\/www.oilnewskenya.com\/index.php\/morendat-centre-of-excellence-to-provide-oil-gas-courses-to-meet-regions-skills-shortage\/","url_meta":{"origin":5923,"position":2},"title":"Morendat Centre Of Excellence To Provide Oil &#038; Gas Courses To Meet Region\u2019s Skills Shortage","author":"","date":"July 14, 2016","format":false,"excerpt":"The Kenya Pipeline Company\u2019s \u00a0(KPC) Morendat Centre of Excellence is set to provide technical courses in oil and gas as the country grapples with skills shortage ahead of the development phase. Morendat facility in Naivasha will initially offer six courses namely Oil Pipeline I&C Technician; Oil Pipeline Mechanical Technician; Oil\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/07\/Morendat-Training-and-Conference-Centre.jpg?fit=800%2C600&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/07\/Morendat-Training-and-Conference-Centre.jpg?fit=800%2C600&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/07\/Morendat-Training-and-Conference-Centre.jpg?fit=800%2C600&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/07\/Morendat-Training-and-Conference-Centre.jpg?fit=800%2C600&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":10720,"url":"https:\/\/www.oilnewskenya.com\/index.php\/kenya-t-d-williamson-completes-first-pipeline-inspection-of-the-mombasa-to-nairobi-refined-multi-product-transmission-pipeline\/","url_meta":{"origin":5923,"position":3},"title":"KENYA: T.D. Williamson Completes First Pipeline Inspection of the Mombasa to Nairobi Refined Multi-product Transmission Pipeline","author":"","date":"August 12, 2021","format":false,"excerpt":"T.D. Williamson (TDW), the global pipeline solutions provider, completed its first in-line inspection (ILI) in Kenya using TDW multiple dataset (MDS) technology. The MDS platform incorporates a variety of inspection technologies on a single platform. It is widely accepted as the most comprehensive system on the market to identify integrity\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/08\/TDW-MDS-Kenya.jpg?fit=800%2C520&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/08\/TDW-MDS-Kenya.jpg?fit=800%2C520&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/08\/TDW-MDS-Kenya.jpg?fit=800%2C520&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/08\/TDW-MDS-Kenya.jpg?fit=800%2C520&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":5927,"url":"https:\/\/www.oilnewskenya.com\/index.php\/kenya-pipeline-kenya-petroleum-refineries-sign-eops-lease-agreement\/","url_meta":{"origin":5923,"position":4},"title":"Kenya Pipeline, Kenya Petroleum Refineries Sign EOPS Lease Agreement","author":"","date":"March 7, 2017","format":false,"excerpt":"Kenya Pipeline Company (KPC) and Kenya Petroleum Refineries Limited (KPRL) today signed a 3 year lease agreement allowing Kenya Pipeline to use the facilities of KPRL for the Early Oil Pilot Scheme Project. The Early Oil Pilot Scheme Project is a government initiative aimed at exploration and marketing of crude\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2017\/05\/KPC-KPRL-Agreement.jpg?fit=1200%2C583&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2017\/05\/KPC-KPRL-Agreement.jpg?fit=1200%2C583&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2017\/05\/KPC-KPRL-Agreement.jpg?fit=1200%2C583&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2017\/05\/KPC-KPRL-Agreement.jpg?fit=1200%2C583&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2017\/05\/KPC-KPRL-Agreement.jpg?fit=1200%2C583&ssl=1&resize=1050%2C600 3x"},"classes":[]},{"id":850,"url":"https:\/\/www.oilnewskenya.com\/index.php\/kenya-to-use-kshs-10-3-billion-to-relocate-kipevu-oil-terminal\/","url_meta":{"origin":5923,"position":5},"title":"Kenya to use Kshs. 10.3 billion to relocate Kipevu Oil terminal","author":"Samuel Kamau Mbote","date":"April 7, 2014","format":false,"excerpt":"Kenya government has began relocating Kipevu Oil terminal as it tries to increase capacity and reduce the frequent oil shortages. According to the Kenya Ports Authority chairman Danson Mungatana the $120 million facility will take five years to be completed and will serve to reduce fuel prices as the country\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/04\/kpc.jpg?fit=595%2C300&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/04\/kpc.jpg?fit=595%2C300&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/04\/kpc.jpg?fit=595%2C300&ssl=1&resize=525%2C300 1.5x"},"classes":[]}],"jetpack_sharing_enabled":true,"jetpack_likes_enabled":true,"_links":{"self":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/5923","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/comments?post=5923"}],"version-history":[{"count":1,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/5923\/revisions"}],"predecessor-version":[{"id":5925,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/5923\/revisions\/5925"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media\/5924"}],"wp:attachment":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media?parent=5923"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/categories?post=5923"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/tags?post=5923"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}