{"id":5896,"date":"2017-05-02T07:21:12","date_gmt":"2017-05-02T07:21:12","guid":{"rendered":"http:\/\/www.oilnewskenya.com\/?p=5896"},"modified":"2017-05-02T07:21:12","modified_gmt":"2017-05-02T07:21:12","slug":"president-uhuru-kenyatta-breaks-ground-for-olkaria-v-power-project","status":"publish","type":"post","link":"https:\/\/www.oilnewskenya.com\/index.php\/president-uhuru-kenyatta-breaks-ground-for-olkaria-v-power-project\/","title":{"rendered":"President Uhuru Kenyatta Breaks Ground For Olkaria V Power Project"},"content":{"rendered":"<p>President Uhuru Kenyatta last week\u00a0broke ground for the construction of the Olkaria V power project which will produce 158 MW of electricity.<\/p>\n<p>The President at the same time commissioned 14 wellhead units producing a total of 75 MW of electricity.<\/p>\n<p>The \u2018wellhead unit\u2019 is a unique technology developed by Kenyan engineers to harness geothermal power, which has reduced the duration between the first drilling of a well and installation of a geothermal plant from five years to two years.<\/p>\n<p>The President challenged other Kenyan institutions to adopt the innovative approach of Kengen to transform the country.<\/p>\n<p>\u201cInnovation must be the new identity of Kenyan institutions if we are going to see the transformation Kenyans demand,\u201d said the President when he spoke at the function at Olkaria, Nakuru County<\/p>\n<p>President Kenyatta said the Jubilee Government has a clear vision to provide sufficient, cheap, green and reliable energy for Kenya.<\/p>\n<p>\u201cOnce again, the path is clear: we expect that the peak load will grow to about 15,000 MW by 2030; that demand will be met by raising installed capacity gradually to 19,200 MW by 2030,\u201d said the President<\/p>\n<p>He said the expansion of geothermal power production will contribute to Kenya\u2019s prosperity.<\/p>\n<p>\u201cIn commissioning these wells, and in breaking ground for the new project, we take a mighty step on the road to prosperity for this nation,\u201d said the President.<\/p>\n<p>He said Kenya has one of the largest reserves of geothermal energy and more plants will be constructed to harness the power for the benefit of Kenyans.<\/p>\n<p>\u201cThat this form of energy is not subject to the vagaries of the weather, and that it runs at a respectable rate more than 90% of the time every year, means that we can bring reliable power to every Kenyan home,\u201d said the President.<\/p>\n<p>Energy Cabinet Secretary Charles Keter said Kenya has come along way and is a trendsetter in the energy sector.<\/p>\n<p>He said President Kenyatta has shown total commitment to maintain and increase Kenya\u2019s global leadership in green energy production and consumption.<\/p>\n<p>Nakuru Governor Kinuthia Mbugua and Japan\u2019s Ambassador to Kenya also spoke at the function.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>President Uhuru Kenyatta last week\u00a0broke ground for the construction of the Olkaria V power project which will produce 158 MW of electricity. The President at the same time commissioned 14 &hellip; <a href=\"https:\/\/www.oilnewskenya.com\/index.php\/president-uhuru-kenyatta-breaks-ground-for-olkaria-v-power-project\/\" class=\"more-link\">Read More<\/a><\/p>\n","protected":false},"author":24,"featured_media":5897,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[4747,4746],"tags":[376,3889,742,990,1250,1252,6103,2075],"class_list":["post-5896","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-geothermal","category-renewables-2","tag-cabinet-secretary","tag-charles-keter","tag-energy","tag-geothermal","tag-kengen","tag-kenya","tag-olkaria-v-power-project","tag-president-uhuru-kenyatta","entry"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2017\/05\/Uhuru-Olkaria-V.jpg?fit=960%2C766&ssl=1","jetpack_shortlink":"https:\/\/wp.me\/p5JWkQ-1x6","jetpack-related-posts":[{"id":12504,"url":"https:\/\/www.oilnewskenya.com\/index.php\/kenya-president-kenyatta-commissioned-kengens-olkaria-v-and-olkaria-i-additional-unit-6-geothermal-power-stations\/","url_meta":{"origin":5896,"position":0},"title":"KENYA: President Kenyatta Commissions KenGen&#8217;s Olkaria V and Olkaria I Additional Unit 6 Geothermal Power Stations","author":"","date":"July 26, 2022","format":false,"excerpt":"His Excellency President Uhuru Kenyatta has commissioned KenGen's Olkaria V and Olkaria I Additional Unit 6 (Olkaria I AU6) geothermal power stations in Naivasha, Nakuru County. Olkaria V is a 158MW plant while Olkaria I AU6, with the largest single turbine unit ever installed in any of KenGen's 5 geothermal\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/07\/KenGen-Olkaria-VI.jpg?fit=1200%2C801&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/07\/KenGen-Olkaria-VI.jpg?fit=1200%2C801&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/07\/KenGen-Olkaria-VI.jpg?fit=1200%2C801&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/07\/KenGen-Olkaria-VI.jpg?fit=1200%2C801&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/07\/KenGen-Olkaria-VI.jpg?fit=1200%2C801&ssl=1&resize=1050%2C600 3x"},"classes":[]},{"id":6758,"url":"https:\/\/www.oilnewskenya.com\/index.php\/civil-works-begin-olkaria-v-geothermal-plant\/","url_meta":{"origin":5896,"position":1},"title":"Civil Works Begin At Olkaria V Geothermal Plant","author":"","date":"January 29, 2018","format":false,"excerpt":"Civil works have commenced in the 154 megawatt Olkaria V plant nine months after Kenya's President Uhuru Kenyatta broke ground at the location of the facility. The planned which is expected to cost approximately $400 million is jointly financed by the\u00a0Japan International Cooperation Agency\u00a0(JICA) and the\u00a0Kenya Electricity Generating Company\u00a0(KenGen). According\u2026","rel":"","context":"In &quot;Geothermal&quot;","block_context":{"text":"Geothermal","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/renewables-2\/geothermal\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2018\/01\/Olkaria-V-site-scaled.jpeg?fit=1200%2C900&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2018\/01\/Olkaria-V-site-scaled.jpeg?fit=1200%2C900&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2018\/01\/Olkaria-V-site-scaled.jpeg?fit=1200%2C900&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2018\/01\/Olkaria-V-site-scaled.jpeg?fit=1200%2C900&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2018\/01\/Olkaria-V-site-scaled.jpeg?fit=1200%2C900&ssl=1&resize=1050%2C600 3x"},"classes":[]},{"id":4964,"url":"https:\/\/www.oilnewskenya.com\/index.php\/kengen-drilling-programme-records-unique-success\/","url_meta":{"origin":5896,"position":2},"title":"KenGen Drilling Programme Records Unique Success","author":"","date":"December 14, 2015","format":false,"excerpt":"KenGen has recorded significant steam finds in Olkaria, putting the company in a prime position to begin the next phase of capacity enhancement projects which are largely based on geothermal energy. A total of 375 megawatts (MW) is currently available for three planned projects with a total capacity of 350MW\u2026","rel":"","context":"In &quot;Geothermal&quot;","block_context":{"text":"Geothermal","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/renewables-2\/geothermal\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/08\/Menengai-Geothermal-Well.png?fit=529%2C395&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/08\/Menengai-Geothermal-Well.png?fit=529%2C395&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/08\/Menengai-Geothermal-Well.png?fit=529%2C395&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":12196,"url":"https:\/\/www.oilnewskenya.com\/index.php\/kenya-kengen-completes-construction-of-olkaria-i-unit-6-geothermal-power-plant\/","url_meta":{"origin":5896,"position":3},"title":"KENYA: KenGen Completes Construction of Olkaria I Unit 6 Geothermal Power Plant","author":"","date":"April 1, 2022","format":false,"excerpt":"Kenya Electricity Generating Company (KenGen) has completed the construction of the 83MW Olkaria I, Additional Unit (AU) 6 Geothermal Power Plant, setting in motion activities to add it to the national power grid. This milestone follows a successful delivery of full steam to the power plant, setting in motion technical\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/04\/Olkaria.jpg?fit=1200%2C494&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/04\/Olkaria.jpg?fit=1200%2C494&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/04\/Olkaria.jpg?fit=1200%2C494&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/04\/Olkaria.jpg?fit=1200%2C494&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/04\/Olkaria.jpg?fit=1200%2C494&ssl=1&resize=1050%2C600 3x"},"classes":[]},{"id":4960,"url":"https:\/\/www.oilnewskenya.com\/index.php\/kengen-strikes-33mw-from-new-geothermal-wells-in-olkaria\/","url_meta":{"origin":5896,"position":4},"title":"KenGen strikes 33MW from New geothermal wells in Olkaria","author":"","date":"December 14, 2015","format":false,"excerpt":"Olkaria Wells OW-923 Trio is among the biggest geothermal wells in the area The Kenya Electricity Generating Company (KenGen) has successfully drilled another set of big geothermal wells in this country, further boosting Kenya\u2019s quest to be self sufficient in electricity. Three wells located within one pad with a total\u2026","rel":"","context":"In &quot;Geothermal&quot;","block_context":{"text":"Geothermal","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/renewables-2\/geothermal\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/08\/Geothermal-OW-923.png?fit=631%2C344&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/08\/Geothermal-OW-923.png?fit=631%2C344&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/08\/Geothermal-OW-923.png?fit=631%2C344&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":4971,"url":"https:\/\/www.oilnewskenya.com\/index.php\/kengen-commissions-the-entire-280mw-geothermal-project\/","url_meta":{"origin":5896,"position":5},"title":"KenGen commissions the entire 280MW geothermal project","author":"","date":"December 14, 2015","format":false,"excerpt":"The Kenya Electricity Generating Company (KenGen) on Thursday last week\u00a0inaugurated the 140MW Olkaria 1 power plant, the last phase of the\u00a0280 MW of Olkaria geothermal power the world\u2019s largest such power plant, a move that is expected to further stabilise the cost of electricity in the country. H.E President Paul\u2026","rel":"","context":"In &quot;Geothermal&quot;","block_context":{"text":"Geothermal","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/renewables-2\/geothermal\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/08\/Olkaria-II.jpg?fit=940%2C529&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/08\/Olkaria-II.jpg?fit=940%2C529&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/08\/Olkaria-II.jpg?fit=940%2C529&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/08\/Olkaria-II.jpg?fit=940%2C529&ssl=1&resize=700%2C400 2x"},"classes":[]}],"jetpack_sharing_enabled":true,"jetpack_likes_enabled":true,"_links":{"self":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/5896","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/comments?post=5896"}],"version-history":[{"count":1,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/5896\/revisions"}],"predecessor-version":[{"id":5898,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/5896\/revisions\/5898"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media\/5897"}],"wp:attachment":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media?parent=5896"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/categories?post=5896"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/tags?post=5896"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}