{"id":5720,"date":"2017-02-28T07:19:18","date_gmt":"2017-02-28T07:19:18","guid":{"rendered":"http:\/\/www.oilnewskenya.com\/?p=5720"},"modified":"2017-02-28T07:19:18","modified_gmt":"2017-02-28T07:19:18","slug":"kengen-awards-mitsubishi-corporation-contract-to-construct-olkaria-v-geothermal-plant","status":"publish","type":"post","link":"https:\/\/www.oilnewskenya.com\/index.php\/kengen-awards-mitsubishi-corporation-contract-to-construct-olkaria-v-geothermal-plant\/","title":{"rendered":"KenGen Awards Mitsubishi Corporation Contract to Construct Olkaria V Geothermal Plant"},"content":{"rendered":"<p>Mitsubishi Corporation (MC), together with Mitsubishi Hitachi Power Systems Ltd. (MHPS) and H Young &amp; Co. (E.A.) Ltd. (HY), has been awarded a full turnkey contract by Kenya Electricity Generating Company Ltd. for the construction of a geothermal power plant (Olkaria V) in Kenya.<\/p>\n<p>The installment will be the fifth in the series of geothermal power plants being built in the Olkaria area of Kenya. MC will be responsible for supplying the plant&#8217;s main equipment, while MHPS will handle in-land transportation and installation.<\/p>\n<p>HY, a Kenya-based engineering and construction company, will supply the remaining components needed for plant construction, as well as conduct civil engineering and installation works. The construction is scheduled for completion in 2019.<\/p>\n<p>The Olkaria V project will oversee the construction of a geothermal plant with the capacity to supply 140 MW of power. It will be financed by an Official Development Assistance (ODA) loan provided by the Japan International Cooperation Agency (JICA).<\/p>\n<p>MC and MHPS have been working together to build geothermal power plants in Kenya since the 1980s(1). Once Olkaria V is completed, these projects combined are expected to supply 290 MW of power in Kenya, more than 10% of the country&#8217;s energy overall.<\/p>\n<p>Furthermore, given projections of a sharp increase in energy demand, the Kenya Vision 2030 national development policy includes targets for expanding energy generation capacity to 18,000 MW by 2030. This project is therefore well positioned to help achieve that target while at the same time contribute to reducing greenhouse gas emissions and preserving the environment.<\/p>\n<p>By investing in this sector, indispensable for stimulating industrial development and improving standards of living, MC aims to continue contributing to economic growth and environmental sustainability in Kenya, while at the same time playing a role in increasing the export of high-quality infrastructure from Japan.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Mitsubishi Corporation (MC), together with Mitsubishi Hitachi Power Systems Ltd. (MHPS) and H Young &amp; Co. (E.A.) Ltd. (HY), has been awarded a full turnkey contract by Kenya Electricity Generating &hellip; <a href=\"https:\/\/www.oilnewskenya.com\/index.php\/kengen-awards-mitsubishi-corporation-contract-to-construct-olkaria-v-geothermal-plant\/\" class=\"more-link\">Read More<\/a><\/p>\n","protected":false},"author":24,"featured_media":4926,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[4747,4746],"tags":[990,5891,5042,4766,4767,1250,1252,5892,5889,5890,5893,4811],"class_list":["post-5720","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-geothermal","category-renewables-2","tag-geothermal","tag-h-young-co-e-a-ltd","tag-japan","tag-japan-international-cooperation-agency","tag-jica","tag-kengen","tag-kenya","tag-kenya-electricity-generating-company-ltd","tag-mitsubishi-corporation","tag-mitsubishi-hitachi-power-systems-ltd","tag-official-development-assistance","tag-olkaria-v","entry"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/08\/olkaria-plant-4.png?fit=505%2C320&ssl=1","jetpack_shortlink":"https:\/\/wp.me\/p5JWkQ-1ug","jetpack-related-posts":[{"id":6758,"url":"https:\/\/www.oilnewskenya.com\/index.php\/civil-works-begin-olkaria-v-geothermal-plant\/","url_meta":{"origin":5720,"position":0},"title":"Civil Works Begin At Olkaria V Geothermal Plant","author":"","date":"January 29, 2018","format":false,"excerpt":"Civil works have commenced in the 154 megawatt Olkaria V plant nine months after Kenya's President Uhuru Kenyatta broke ground at the location of the facility. The planned which is expected to cost approximately $400 million is jointly financed by the\u00a0Japan International Cooperation Agency\u00a0(JICA) and the\u00a0Kenya Electricity Generating Company\u00a0(KenGen). According\u2026","rel":"","context":"In &quot;Geothermal&quot;","block_context":{"text":"Geothermal","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/renewables-2\/geothermal\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2018\/01\/Olkaria-V-site-scaled.jpeg?fit=1200%2C900&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2018\/01\/Olkaria-V-site-scaled.jpeg?fit=1200%2C900&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2018\/01\/Olkaria-V-site-scaled.jpeg?fit=1200%2C900&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2018\/01\/Olkaria-V-site-scaled.jpeg?fit=1200%2C900&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2018\/01\/Olkaria-V-site-scaled.jpeg?fit=1200%2C900&ssl=1&resize=1050%2C600 3x"},"classes":[]},{"id":12196,"url":"https:\/\/www.oilnewskenya.com\/index.php\/kenya-kengen-completes-construction-of-olkaria-i-unit-6-geothermal-power-plant\/","url_meta":{"origin":5720,"position":1},"title":"KENYA: KenGen Completes Construction of Olkaria I Unit 6 Geothermal Power Plant","author":"","date":"April 1, 2022","format":false,"excerpt":"Kenya Electricity Generating Company (KenGen) has completed the construction of the 83MW Olkaria I, Additional Unit (AU) 6 Geothermal Power Plant, setting in motion activities to add it to the national power grid. This milestone follows a successful delivery of full steam to the power plant, setting in motion technical\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/04\/Olkaria.jpg?fit=1200%2C494&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/04\/Olkaria.jpg?fit=1200%2C494&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/04\/Olkaria.jpg?fit=1200%2C494&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/04\/Olkaria.jpg?fit=1200%2C494&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/04\/Olkaria.jpg?fit=1200%2C494&ssl=1&resize=1050%2C600 3x"},"classes":[]},{"id":4969,"url":"https:\/\/www.oilnewskenya.com\/index.php\/kengen-strikes-30mw-geothermal-well-in-olkaria-africas-biggest\/","url_meta":{"origin":5720,"position":2},"title":"KenGen strikes 30MW geothermal well in Olkaria, Africa\u2019s biggest","author":"","date":"December 14, 2015","format":false,"excerpt":"Olkaria OW-921 is one of the five biggest geothermal wells in the world Kenya Electricity Generating Company (KenGen) has successfully drilled one of the biggest geothermal wells in the world, boosting Kenya\u2019s quest to triple her power generation capacity to 5,000 megawatts. The well, with a production capacity of 30\u2026","rel":"","context":"In &quot;Geothermal&quot;","block_context":{"text":"Geothermal","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/renewables-2\/geothermal\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/08\/Menengai-Geothermal-Well.png?fit=529%2C395&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/08\/Menengai-Geothermal-Well.png?fit=529%2C395&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/08\/Menengai-Geothermal-Well.png?fit=529%2C395&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":12504,"url":"https:\/\/www.oilnewskenya.com\/index.php\/kenya-president-kenyatta-commissioned-kengens-olkaria-v-and-olkaria-i-additional-unit-6-geothermal-power-stations\/","url_meta":{"origin":5720,"position":3},"title":"KENYA: President Kenyatta Commissions KenGen&#8217;s Olkaria V and Olkaria I Additional Unit 6 Geothermal Power Stations","author":"","date":"July 26, 2022","format":false,"excerpt":"His Excellency President Uhuru Kenyatta has commissioned KenGen's Olkaria V and Olkaria I Additional Unit 6 (Olkaria I AU6) geothermal power stations in Naivasha, Nakuru County. Olkaria V is a 158MW plant while Olkaria I AU6, with the largest single turbine unit ever installed in any of KenGen's 5 geothermal\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/07\/KenGen-Olkaria-VI.jpg?fit=1200%2C801&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/07\/KenGen-Olkaria-VI.jpg?fit=1200%2C801&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/07\/KenGen-Olkaria-VI.jpg?fit=1200%2C801&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/07\/KenGen-Olkaria-VI.jpg?fit=1200%2C801&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/07\/KenGen-Olkaria-VI.jpg?fit=1200%2C801&ssl=1&resize=1050%2C600 3x"},"classes":[]},{"id":4960,"url":"https:\/\/www.oilnewskenya.com\/index.php\/kengen-strikes-33mw-from-new-geothermal-wells-in-olkaria\/","url_meta":{"origin":5720,"position":4},"title":"KenGen strikes 33MW from New geothermal wells in Olkaria","author":"","date":"December 14, 2015","format":false,"excerpt":"Olkaria Wells OW-923 Trio is among the biggest geothermal wells in the area The Kenya Electricity Generating Company (KenGen) has successfully drilled another set of big geothermal wells in this country, further boosting Kenya\u2019s quest to be self sufficient in electricity. Three wells located within one pad with a total\u2026","rel":"","context":"In &quot;Geothermal&quot;","block_context":{"text":"Geothermal","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/renewables-2\/geothermal\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/08\/Geothermal-OW-923.png?fit=631%2C344&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/08\/Geothermal-OW-923.png?fit=631%2C344&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/08\/Geothermal-OW-923.png?fit=631%2C344&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":4971,"url":"https:\/\/www.oilnewskenya.com\/index.php\/kengen-commissions-the-entire-280mw-geothermal-project\/","url_meta":{"origin":5720,"position":5},"title":"KenGen commissions the entire 280MW geothermal project","author":"","date":"December 14, 2015","format":false,"excerpt":"The Kenya Electricity Generating Company (KenGen) on Thursday last week\u00a0inaugurated the 140MW Olkaria 1 power plant, the last phase of the\u00a0280 MW of Olkaria geothermal power the world\u2019s largest such power plant, a move that is expected to further stabilise the cost of electricity in the country. H.E President Paul\u2026","rel":"","context":"In &quot;Geothermal&quot;","block_context":{"text":"Geothermal","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/renewables-2\/geothermal\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/08\/Olkaria-II.jpg?fit=940%2C529&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/08\/Olkaria-II.jpg?fit=940%2C529&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/08\/Olkaria-II.jpg?fit=940%2C529&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/08\/Olkaria-II.jpg?fit=940%2C529&ssl=1&resize=700%2C400 2x"},"classes":[]}],"jetpack_sharing_enabled":true,"jetpack_likes_enabled":true,"_links":{"self":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/5720","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/comments?post=5720"}],"version-history":[{"count":1,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/5720\/revisions"}],"predecessor-version":[{"id":5721,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/5720\/revisions\/5721"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media\/4926"}],"wp:attachment":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media?parent=5720"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/categories?post=5720"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/tags?post=5720"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}