{"id":5549,"date":"2017-01-12T08:36:37","date_gmt":"2017-01-12T08:36:37","guid":{"rendered":"http:\/\/www.oilnewskenya.com\/?p=5549"},"modified":"2017-01-24T12:08:09","modified_gmt":"2017-01-24T12:08:09","slug":"gulf-interstate-engineering-bags-uganda-tanzania-crude-oil-pipeline-design-contract","status":"publish","type":"post","link":"https:\/\/www.oilnewskenya.com\/index.php\/gulf-interstate-engineering-bags-uganda-tanzania-crude-oil-pipeline-design-contract\/","title":{"rendered":"Gulf Interstate Engineering Bags Uganda-Tanzania Crude Oil Pipeline Design Contract"},"content":{"rendered":"<p>Houston based\u00a0 Gulf Interstate Engineering which specializes in project management, engineering and design, procurement and material and construction management services for oil and gas production, transportation and storage systems has been awarded the contract to design the Uganda Tanzania crude oil pipeline according to Reuters.<\/p>\n<p>The company will be tasked with coming up with the pipeline specifications, the project execution plan, implementation schedule as well as bid documents for 1,445 km $3.55 billion pipeline.<\/p>\n<p>The contract awarded in December allows Gulf to complete the contract for the Front-End Engineering Design (FEED) in eight months with production expected to start in four years time.<\/p>\n<p>Meanwhile the two East African countries and Total are also said to be considering hiring a transaction advisor that will advise the partners on the process of getting a lead investor needed for financing the project.<\/p>\n<p>The Ministry is expected before end month to put out a request for proposals for the T.A who role will include among others review proposals, manage tenders internationally as well as advise on the selection of the lead investor.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Houston based\u00a0 Gulf Interstate Engineering which specializes in project management, engineering and design, procurement and material and construction management services for oil and gas production, transportation and storage systems has &hellip; <a href=\"https:\/\/www.oilnewskenya.com\/index.php\/gulf-interstate-engineering-bags-uganda-tanzania-crude-oil-pipeline-design-contract\/\" class=\"more-link\">Read More<\/a><\/p>\n","protected":false},"author":24,"featured_media":5550,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[11],"tags":[538,5512,5734,4173,2042,2466,2533,4174,2603],"class_list":["post-5549","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-top-news","tag-crude-oil","tag-front-end-engineering-design","tag-gulf-interstate-engineering","tag-lead-investor","tag-pipeline","tag-tanzania","tag-total","tag-transaction-advisor","tag-uganda","entry"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2017\/01\/Gulf-Interstate.jpg?fit=683%2C376&ssl=1","jetpack_shortlink":"https:\/\/wp.me\/p5JWkQ-1rv","jetpack-related-posts":[{"id":5674,"url":"https:\/\/www.oilnewskenya.com\/index.php\/final-investment-decision-on-ugandas-albertine-project-expected-in-q4-2017\/","url_meta":{"origin":5549,"position":0},"title":"Final Investment Decision on Uganda\u2019s Albertine Project Expected in Q4 2017","author":"","date":"February 9, 2017","format":false,"excerpt":"It is the aspiration of the Uganda government and joint venture partners Total, CnooC and Tullow Oil to achieve FID by the end of 2017 according to the latest full year results by the Irish explorer. To date the Government of Uganda confirmed its decision to route an oil export\u2026","rel":"","context":"In \"Albertine basin\"","block_context":{"text":"Albertine basin","link":"https:\/\/www.oilnewskenya.com\/index.php\/tag\/albertine-basin\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/03\/uganda.jpg?fit=595%2C400&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/03\/uganda.jpg?fit=595%2C400&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/03\/uganda.jpg?fit=595%2C400&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":5707,"url":"https:\/\/www.oilnewskenya.com\/index.php\/mfri-forms-a-consortium-with-logstor-to-bid-the-east-africa-crude-oil-pipeline-eacop-project\/","url_meta":{"origin":5549,"position":1},"title":"MFRI forms a Consortium with Logstor to bid the East Africa Crude Oil Pipeline (EACOP) Project","author":"","date":"February 23, 2017","format":false,"excerpt":"Global leader in pre-insulated piping and leak detection systems for oil and gas\u00a0MFRI, has announced that its Perma-Pipe subsidiary has formed a consortium with Danish company Logstor to bid the East Africa Crude Oil Pipeline (EACOP) project. The EACOP project a 1450 Km (900 mile) long heavy crude oil pipeline\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/10\/Kenya-Uganda-pipeline-design-1.jpg?fit=900%2C610&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/10\/Kenya-Uganda-pipeline-design-1.jpg?fit=900%2C610&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/10\/Kenya-Uganda-pipeline-design-1.jpg?fit=900%2C610&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/10\/Kenya-Uganda-pipeline-design-1.jpg?fit=900%2C610&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":6788,"url":"https:\/\/www.oilnewskenya.com\/index.php\/eacop-big-test-opportunity-regional-logistics-players\/","url_meta":{"origin":5549,"position":2},"title":"EACOP A Big Test and Opportunity for Regional Logistics Players","author":"","date":"February 1, 2018","format":false,"excerpt":"The East Africa Crude Oil pipeline to be constructed between Hoima Uganda and Tanga in Tanzania a distance spanning 1445 kilometers is expected to have a flow rate of 216kbpd and will need over 500,000 tonnes of imported equipment to complete. This infrastructure is expected to provide a huge opportunity\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2018\/02\/pipes-logistics.jpg?fit=429%2C337&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":5824,"url":"https:\/\/www.oilnewskenya.com\/index.php\/8b-to-be-invested-in-uganda-in-the-next-3-years\/","url_meta":{"origin":5549,"position":3},"title":"$8B to be invested in Uganda in the next 3 years","author":"","date":"March 29, 2017","format":false,"excerpt":"Uganda expects up to $20 billion in investments as a result of the development phase in the oil and gas industry including $8 billion in the next three years as it\u00a0races to complete its crude oil pipeline by 2020 according to the CEO of the Association of Uganda Oil and\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/03\/tanzania-pipeline.png?fit=282%2C418&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":13195,"url":"https:\/\/www.oilnewskenya.com\/index.php\/uganda-approves-eacop-construction-license\/","url_meta":{"origin":5549,"position":4},"title":"Uganda Approves EACOP Construction License","author":"","date":"January 24, 2023","format":false,"excerpt":"Construction of the world's longest crude oil heat traced pipeline is finally set to kick off after the Ugandan cabinet gave a go-ahead for its construction six months after the East African Crude Oil Pipeline Company (EACOP) Ltd applied for a construction license. The construction license will enable the company\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/01\/EACOP-Application-License.png?fit=825%2C394&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/01\/EACOP-Application-License.png?fit=825%2C394&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/01\/EACOP-Application-License.png?fit=825%2C394&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/01\/EACOP-Application-License.png?fit=825%2C394&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":11487,"url":"https:\/\/www.oilnewskenya.com\/index.php\/free-download-uganda-tilenga-project-development-stage-east-africa-crude-oil-pipeline-eacop-outlook-2021-2025\/","url_meta":{"origin":5549,"position":5},"title":"FREE DOWNLOAD: UGANDA TILENGA PROJECT DEVELOPMENT STAGE &#038; EAST AFRICA CRUDE OIL PIPELINE (EACOP) OUTLOOK 2021 \u2013 2025","author":"","date":"January 3, 2022","format":false,"excerpt":"In December 2021 OilNews Africa announced that starting January 2022 it intends to open its shop to our viewers to access industry information that has been for sale in the past. This is part of the company's intention at inception, to provide access to information that can help Africans make\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/07\/UGANDA-TILENGA-PROJECT-DEVELOPMENT-STAGE-EAST-AFRICA-CRUDE-OIL-PIPELINE-EACOP-OUTLOOK-2021-%E2%80%93-2025.jpg?fit=408%2C519&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]}],"jetpack_sharing_enabled":true,"jetpack_likes_enabled":true,"_links":{"self":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/5549","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/comments?post=5549"}],"version-history":[{"count":1,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/5549\/revisions"}],"predecessor-version":[{"id":5551,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/5549\/revisions\/5551"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media\/5550"}],"wp:attachment":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media?parent=5549"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/categories?post=5549"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/tags?post=5549"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}