{"id":5496,"date":"2016-12-16T12:40:43","date_gmt":"2016-12-16T12:40:43","guid":{"rendered":"http:\/\/www.oilnewskenya.com\/?p=5496"},"modified":"2017-01-24T12:35:53","modified_gmt":"2017-01-24T12:35:53","slug":"russian-consortium-now-wants-ugandas-refinery-project-downsized","status":"publish","type":"post","link":"https:\/\/www.oilnewskenya.com\/index.php\/russian-consortium-now-wants-ugandas-refinery-project-downsized\/","title":{"rendered":"Russian consortium now wants Uganda\u2019s refinery project downsized"},"content":{"rendered":"<p>Weeks after <a href=\"http:\/\/bit.ly\/2b2FH3P\">pulling out<\/a> as the preffered lead bidder for the 60,000 barrel refinery to be located in Hoima Uganda the Russian consortium <a href=\"http:\/\/bit.ly\/29B6ShB\">RT Global resources<\/a> is now demanding that the country builds a small refinery in the first phase with a capacity of between 7000 and 8000 barrels a day.<\/p>\n<p>According to the local Daily Monitor newspaper which interviewed Russia\u2019s ambassador to Uganda Alexander Dmitrievich Polyakov,\u00a0the envoy said the conceptualized 60,000 barrels a day refinery would be expensive considering the high technology required pointing to a \u00a0flaw in designing which would ultimately lead to mistakes in building and operating the new oil refinery.<\/p>\n<p>Alexander notes that should the new proposal be adopted the new refinery could be completed in a short period of seven to eight months and refine imported crude as production in Uganda is yet to commence.<\/p>\n<p>He also noted challenges in crude oil production volumes in the set timelines and challenges in the needed crude to reach the required operational levels of refinery as well delays in completion of the pipeline.<\/p>\n<p>\u201cThere is a danger that the refinery (60,000 barrels per day) would be constructed by the year 2020, but due to unforeseen reasons, production of crude oil in Uganda may not reach the necessary levels for normal operation of refinery. The issue of oil pipeline (from Hoima to Indian Ocean coastline) is also still bad. However, it is not up to us, the Uganda government has to decide; we just advise. Nevertheless, we\u2019re ready to propose a more productive solution to the oil refinery,\u201d\u00a0Alexander is quoted saying.<\/p>\n<p>&#8220;However, it is not up to us, the Uganda government has to decide; we just advise. Nevertheless, we&#8217;re ready to propose a more productive solution to the oil refinery,&#8221;\u00a0he concudes.<\/p>\n<p>The <a href=\"http:\/\/bit.ly\/1TXfqP8\">refinery project<\/a> is the child of the National Oil and Gas Policy (2008) for Uganda (objective 4) which seeks to promote valuable utilisation of the country\u2019s oil and gas resources through in-country refining of crude oil.<\/p>\n<p>It was Foster Wheeler Energy Limited Ltd from the United Kingdom back in 2010 after being contracted to conduct a feasibility study on building a refinery in Uganda that recommended that the development of 60,000 barrels per day refinery was commercially viable with a Net Present Value (NPV) of US$ 3.2 billion.<\/p>\n<p>Under the current plan the development of a refinery in a modular manner, was to see the first phase in place by 2018.<\/p>\n<p>There have been fears of major delays after the alternate bidder SK Engineering and Construction <a href=\"http:\/\/bit.ly\/2hVNrTV\">backed out<\/a> of the project following the exit of the preferred lead investor Russia\u2019s\u00a0RT Global Resources\u00a0in July.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Weeks after pulling out as the preffered lead bidder for the 60,000 barrel refinery to be located in Hoima Uganda the Russian consortium RT Global resources is now demanding that &hellip; <a href=\"https:\/\/www.oilnewskenya.com\/index.php\/russian-consortium-now-wants-ugandas-refinery-project-downsized\/\" class=\"more-link\">Read More<\/a><\/p>\n","protected":false},"author":24,"featured_media":4730,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[11],"tags":[5682,5683,538,1084,5684,2129,2200,2206,4172,2499,2603],"class_list":["post-5496","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-top-news","tag-alexander-dmitrievich-polyakov","tag-cost","tag-crude-oil","tag-hoima","tag-production-volumes","tag-refinery","tag-rt-global-resources","tag-russia","tag-sk-engineering-and-construction","tag-technology","tag-uganda","entry"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/05\/russia-oil-refinery.1910x1000.jpg?fit=1910%2C1000&ssl=1","jetpack_shortlink":"https:\/\/wp.me\/p5JWkQ-1qE","jetpack-related-posts":[{"id":6941,"url":"https:\/\/www.oilnewskenya.com\/index.php\/albertine-graben-refinery-consortium-awarded-uganda-refinery-bid\/","url_meta":{"origin":5496,"position":0},"title":"Albertine Graben Refinery Consortium Awarded Uganda Refinery","author":"","date":"April 11, 2018","format":false,"excerpt":"The General Electric,\u00a0SAIPEM SPA led Albertine Graben Refinery Consortium (AGRC) will now build the oil refinery in Hoima District after the signing of the Project Framework Agreement between the government and the AGRC. The agreement will ensure development, design, financing, construction, operation and maintenance of the oil refinery in Hoima\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/02\/refinery.jpg?fit=1120%2C1018&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/02\/refinery.jpg?fit=1120%2C1018&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/02\/refinery.jpg?fit=1120%2C1018&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/02\/refinery.jpg?fit=1120%2C1018&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/02\/refinery.jpg?fit=1120%2C1018&ssl=1&resize=1050%2C600 3x"},"classes":[]},{"id":7137,"url":"https:\/\/www.oilnewskenya.com\/index.php\/saipem-awarded-front-end-engineering-design-feed-uganda-refinery\/","url_meta":{"origin":5496,"position":1},"title":"Saipem Awarded Front End Engineering Design (FEED) For Uganda Refinery","author":"","date":"August 6, 2018","format":false,"excerpt":"Saipem has been awarded a new contract for Front End Engineering Design (FEED) for a new refinery in Hoima. Uganda recently awarded to the Albertine Graben Refinery Consortium following the signing of the Project Framework Agreement between the Consortium and the Government of Uganda ensuring development, design, financing, construction, operation\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2018\/08\/Saipem-Uganda.png?fit=1090%2C575&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2018\/08\/Saipem-Uganda.png?fit=1090%2C575&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2018\/08\/Saipem-Uganda.png?fit=1090%2C575&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2018\/08\/Saipem-Uganda.png?fit=1090%2C575&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2018\/08\/Saipem-Uganda.png?fit=1090%2C575&ssl=1&resize=1050%2C600 3x"},"classes":[]},{"id":1201,"url":"https:\/\/www.oilnewskenya.com\/index.php\/uganda-refinery-lead-advisor-expected-to-be-known-by-july-2014\/","url_meta":{"origin":5496,"position":2},"title":"Uganda Refinery lead advisor expected to be known by July 2014","author":"Samuel Kamau Mbote","date":"June 11, 2014","format":false,"excerpt":"Uganda has received detailed proposals for the role of lead investor for the development of 60,000 barrels per day oil refinery in Hoima. The proposals submitted by four of six shortlisted firms for the project including China Petroleum Pipeline Bureau (CPPB)\u00a0from China, Marubeni Corporation\u00a0from Japan, \u2013 Global Resources\u00a0from Russia and\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":4456,"url":"https:\/\/www.oilnewskenya.com\/index.php\/overview-of-ugandas-60000-barrel-refinery-project\/","url_meta":{"origin":5496,"position":3},"title":"Overview of Uganda\u2019s 60,000 Barrel Refinery Project","author":"","date":"March 10, 2016","format":false,"excerpt":"The refinery project is the child of the National Oil and Gas Policy (2008) for Uganda (objective 4) which seeks to promote valuable utilisation of the country\u2019s oil and gas resources through in-country refining of crude oil. The project is guided by the a Refinery Development Programme (RDP) formulated by\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/02\/refinery.jpg?fit=1120%2C1018&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/02\/refinery.jpg?fit=1120%2C1018&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/02\/refinery.jpg?fit=1120%2C1018&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/02\/refinery.jpg?fit=1120%2C1018&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/02\/refinery.jpg?fit=1120%2C1018&ssl=1&resize=1050%2C600 3x"},"classes":[]},{"id":6187,"url":"https:\/\/www.oilnewskenya.com\/index.php\/uganda-agrc-consortium-start-talks-develop-greenfield-oil-refinery\/","url_meta":{"origin":5496,"position":4},"title":"Uganda, AGRC consortium Start Talks To Develop A Greenfield Oil Refinery","author":"","date":"August 7, 2017","format":false,"excerpt":"The Government of Uganda has announced that it has agreed core project terms for the Uganda Refinery Project with the Albertine Graben Refinery Consortium (AGRC) for the development of a greenfield oil Refinery to be located in the southwestern district of Hoima in Uganda. The government says this follows a\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/02\/refinery.jpg?fit=1120%2C1018&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/02\/refinery.jpg?fit=1120%2C1018&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/02\/refinery.jpg?fit=1120%2C1018&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/02\/refinery.jpg?fit=1120%2C1018&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/02\/refinery.jpg?fit=1120%2C1018&ssl=1&resize=1050%2C600 3x"},"classes":[]},{"id":5087,"url":"https:\/\/www.oilnewskenya.com\/index.php\/ugandas-petrochemical-industrial-park-master-plan-to-be-complete-by-february-2017\/","url_meta":{"origin":5496,"position":5},"title":"Uganda\u2019s Petrochemical Industrial Park Master Plan to be complete by February 2017","author":"","date":"August 28, 2016","format":false,"excerpt":"A master plan for the development of the petrochemical industrial park in Hoima, Uganda is expected to be completed by February 2017 according to the country\u2019s Prime Minister Dr. Ruhakana Rugunda. Speaking at the opening of the 6th joint sector review for the energy and mineral development sector Dr Ruhakana\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/02\/refinery.jpg?fit=1120%2C1018&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/02\/refinery.jpg?fit=1120%2C1018&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/02\/refinery.jpg?fit=1120%2C1018&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/02\/refinery.jpg?fit=1120%2C1018&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/02\/refinery.jpg?fit=1120%2C1018&ssl=1&resize=1050%2C600 3x"},"classes":[]}],"jetpack_sharing_enabled":true,"jetpack_likes_enabled":true,"_links":{"self":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/5496","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/comments?post=5496"}],"version-history":[{"count":1,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/5496\/revisions"}],"predecessor-version":[{"id":5497,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/5496\/revisions\/5497"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media\/4730"}],"wp:attachment":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media?parent=5496"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/categories?post=5496"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/tags?post=5496"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}