{"id":5400,"date":"2016-11-16T20:02:10","date_gmt":"2016-11-16T20:02:10","guid":{"rendered":"http:\/\/www.oilnewskenya.com\/?p=5400"},"modified":"2017-01-24T15:27:11","modified_gmt":"2017-01-24T15:27:11","slug":"erhc-reports-oil-gas-shows-at-kenyas-tarach-1-well","status":"publish","type":"post","link":"https:\/\/www.oilnewskenya.com\/index.php\/erhc-reports-oil-gas-shows-at-kenyas-tarach-1-well\/","title":{"rendered":"ERHC Reports Oil &#038; Gas Shows At Kenya\u2019s Tarach-1 Well"},"content":{"rendered":"<p>American explorer ERHC has said it encountered significant oil shows and highly-elevated gas readings at the Tarach-1 well located in Block 11A indicating the presence of a working petroleum system with the strong possibility of significant hydrocarbon generation.<\/p>\n<p>According to the latest update from the oil explorer Tarach-1 well encountered two different hydrocarbon charged intervals, the first extending over 100 meters.<\/p>\n<p>Terming the results encouraging President and Chief Executive Officer Peter Ntephe said information from the drilling revealed the possibility for further exploration.<\/p>\n<p>The objective of the well was to establish a working petroleum system and test a three-way structural closure trapping against a North-South trending normal fault.<\/p>\n<p>The new update contradicts sentiments by commissioner for petroleum <a href=\"http:\/\/bit.ly\/2f1h5oM\">Martin Heya<\/a> at the Ministry of Energy and Petroleum in September who although noting that the block operator was yet to furnish the ministry with the technical details of the drilling it had notified the government on the status of the well as dry.<\/p>\n<p>\u201cWe are yet to get the technical details from CEPSA although we already have word that Tarach-1 was a dry well,\u201d Heya told OilNews Kenya in September. Another source had earlier termed the preliminary results as <a href=\"http:\/\/bit.ly\/2bBalkX\">disappointing<\/a>\u00a0without revealing any further details.<\/p>\n<p>ERHC adds that Tarach-1 exploratory well which commenced <a href=\"http:\/\/bit.ly\/2bV3IIJ\">drilling<\/a> in April has been plugged following conclusion of drilling as post-well analysis continues.<\/p>\n<p>Tarach 1\u00a0was drilled from a 20-inch surface casing through intermediate casings down to 2,442 meters and set a seven-inch liner down to total depth (TD) of 3,000 meters with the Tarach-1 prospect\u2019s mean estimate of oil prospective unrisked resources earlier estimated at 66 million barrels.<\/p>\n<p>As per records on exploration and drilling\u00a0<a href=\"http:\/\/bit.ly\/2ctctfJ\">expenses<\/a>\u00a0filed by ERHC to the United States Securities And Exchange Commission the two partners used over $25 million of which the American explorer sank $4.5 million.<\/p>\n<p>ERHC shareholders will be happy to know that under the previous arrangement CEPSA was to be involved in continued participation only in the case of a hydrocarbons find.<\/p>\n<p>CEPSA has also\u00a0planned second exploratory well , the Egole-1 a four-way rollover closure onto a Northwest \u2013 Southeast trending fault plain with mean prospective resources of 101 million barrels another of 13 drillable\u00a0<a href=\"http:\/\/bit.ly\/2bTeJYw\">prospects<\/a>.<\/p>\n<p>The block is operated by CEPSA. State-run National Oil Corporation of Kenya (NOCK) and US-based corporation ERHC share the remaining stake, with 10% and 35% respectively<\/p>\n","protected":false},"excerpt":{"rendered":"<p>American explorer ERHC has said it encountered significant oil shows and highly-elevated gas readings at the Tarach-1 well located in Block 11A indicating the presence of a working petroleum system &hellip; <a href=\"https:\/\/www.oilnewskenya.com\/index.php\/erhc-reports-oil-gas-shows-at-kenyas-tarach-1-well\/\" class=\"more-link\">Read More<\/a><\/p>\n","protected":false},"author":24,"featured_media":4149,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[11],"tags":[261,431,5544,5092,3129,796,3143,1589,1690,1755,1994,5543,4078,3128,5013],"class_list":["post-5400","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-top-news","tag-block-11a","tag-cepsa","tag-chief-executive-officer","tag-commissioner-for-petroleum","tag-egole-1","tag-erhc","tag-martin-heya","tag-ministry-of-energy-and-petroleum","tag-national-oil-corporation-of-kenya","tag-nock","tag-peter-ntephe","tag-president","tag-tarach-1-well","tag-tarach-1","tag-united-states-securities-and-exchange-commission","entry"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/12\/block-11A.jpg?fit=234%2C215&ssl=1","jetpack_shortlink":"https:\/\/wp.me\/p5JWkQ-1p6","jetpack-related-posts":[{"id":5809,"url":"https:\/\/www.oilnewskenya.com\/index.php\/tarach-1-well-now-classified-as-dry-cepsa\/","url_meta":{"origin":5400,"position":0},"title":"Tarach 1 Well Now classified as Dry &#8211; CEPSA","author":"","date":"March 27, 2017","format":false,"excerpt":"The Tarach 1 well drilled in April 2016 was dry as earlier reported by OilNews Kenya according to the latest SEC filing by joint venture partner ERHC. \u201cOperator analysis of the results if the Tarach-1 well shows that it did not encounter any reservoirs. The operator has therefore classified Tarach-1\u2026","rel":"","context":"In &quot;New Discoveries&quot;","block_context":{"text":"New Discoveries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/new-discoveries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/07\/kenya-block-11a-2.jpg?fit=300%2C258&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":6395,"url":"https:\/\/www.oilnewskenya.com\/index.php\/cepsa-withdraws-kenyas-block-11a\/","url_meta":{"origin":5400,"position":1},"title":"CEPSA Withdraws From Kenya\u2019s Block 11A","author":"","date":"October 11, 2017","format":false,"excerpt":"CEPSA Kenya Limited, an affiliate of Compa\u00f1\u00eda Espa\u00f1ola de Petr\u00f3leos, S.A.U. has withdrawn from Block 11A months after the unsuccessful drilling of Tarach 1 well OilNews Kenya has learnt. Confirming the exit principal secretary in the Ministry of Energy and Petroleum Andrew Kamau told OilNews Kenya that the Spanish explorer\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/07\/kenya-block-11a-2.jpg?fit=300%2C258&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":2106,"url":"https:\/\/www.oilnewskenya.com\/index.php\/drilling-in-kenyas-block-11a-to-begin-within-12-16-months\/","url_meta":{"origin":5400,"position":2},"title":"Drilling in Kenya\u2019s Block 11A to begin within 12-16 months","author":"Samuel Kamau Mbote","date":"December 2, 2014","format":false,"excerpt":"Block 11A partner Houston based ERHC has announced that together with the block operator CEPSA Kenya Limited (a wholly owned affiliate of Compa\u00f1\u00eda Espa\u00f1ola de Petr\u00f3leos, S.A.U. (CEPSA) it plans to start drilling in Northern Kenya in Q4 2015 earliest having completed a 2D seismic survey and a full tensor\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/07\/kenya-block-11a-2.jpg?fit=300%2C258&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":5116,"url":"https:\/\/www.oilnewskenya.com\/index.php\/cepsa-erhc-hit-dry-well-at-kenyas-block-11a-tarach-1\/","url_meta":{"origin":5400,"position":3},"title":"CEPSA, ERHC Hit Dry Well at Kenya\u2019s Block 11A Tarach-1","author":"","date":"September 1, 2016","format":false,"excerpt":"Earlier reports by OilNews Kenya that the Tarach-1 well in Block 11A was disappointing have now been confirmed with the commissioner for petroleum Martin Heya at the Ministry of Energy and Petroleum saying\u00a0the Spanish explorer Compania Espanola de Petroleos\u00a0 (CEPSA)was a dry well. According to the commissioner the block operator\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/04\/Tarach-1-well-rig.png?fit=551%2C412&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/04\/Tarach-1-well-rig.png?fit=551%2C412&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/04\/Tarach-1-well-rig.png?fit=551%2C412&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":4758,"url":"https:\/\/www.oilnewskenya.com\/index.php\/cepsa-erhc-disappointed-at-kenyas-block-11a-tarach-1-well-source\/","url_meta":{"origin":5400,"position":4},"title":"CEPSA, ERHC Disappointed at Kenya\u2019s Block 11A Tarach-1 well &#8211; Source","author":"","date":"June 15, 2016","format":false,"excerpt":"OilNews Kenya has learnt that the search for oil and gas at Tarach-1 in Kenya\u2019s Block 11A has not been successful and works are ongoing to plug the well according to a reliable source. The drilling that commenced on 14th April 2016 using the SMP 106 rig in the north\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/04\/Tarach-1-well-rig.png?fit=551%2C412&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/04\/Tarach-1-well-rig.png?fit=551%2C412&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/04\/Tarach-1-well-rig.png?fit=551%2C412&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":2846,"url":"https:\/\/www.oilnewskenya.com\/index.php\/cepsa-erhc-identify-drilling-location-kenyas-block-11a\/","url_meta":{"origin":5400,"position":5},"title":"CEPSA, ERHC identify drilling location in Kenya\u2019s Block 11A","author":"","date":"April 23, 2015","format":false,"excerpt":"Spanish exploration company CEPSA and Houston based explorer ERHC have said that its exploration team has identified the Tarach-1 prospect as the drilling location for the first exploration well set to be drilled in March 2016 in an announcement by ERHC. This decision was based on interpretation of 1,086.6 kilometers\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/07\/kenya-block-11a-2.jpg?fit=300%2C258&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]}],"jetpack_sharing_enabled":true,"jetpack_likes_enabled":true,"_links":{"self":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/5400","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/comments?post=5400"}],"version-history":[{"count":3,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/5400\/revisions"}],"predecessor-version":[{"id":5403,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/5400\/revisions\/5403"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media\/4149"}],"wp:attachment":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media?parent=5400"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/categories?post=5400"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/tags?post=5400"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}