{"id":5348,"date":"2016-10-28T07:19:52","date_gmt":"2016-10-28T07:19:52","guid":{"rendered":"http:\/\/www.oilnewskenya.com\/?p=5348"},"modified":"2017-04-07T08:07:42","modified_gmt":"2017-04-07T08:07:42","slug":"why-zararas-pate-2-result-could-overshadow-tullows-early-oil-pilot-scheme","status":"publish","type":"post","link":"https:\/\/www.oilnewskenya.com\/index.php\/why-zararas-pate-2-result-could-overshadow-tullows-early-oil-pilot-scheme\/","title":{"rendered":"Why Zarara\u2019s Pate-2 result could Overshadow Tullow\u2019s Early Oil Pilot Scheme"},"content":{"rendered":"<p>The drilling of Pate-2 well in Lamu County\u2019s Pate Island is set to commence in Q1 2017 same time as the eagerly awaited early oil pilot scheme is set to commence with just over a dozen trucks ferrying crude oil via <a href=\"http:\/\/bit.ly\/2eaSzFm\">road<\/a> from the lokichar oil fields to the Kenya refinery plant in Mombasa.<\/p>\n<p>Unknown to \u00a0many drilling in Pate island has seen success in the past with a gas discovery in 1971 by Shell and BP. According to records \u00a0Pate-1 well located in Block L4 encountered over-pressured gas-charged sands in the Basal <a href=\"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/10\/Pate-1-location.png?ssl=1\"><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" class=\" wp-image-5352 size-medium alignleft\" src=\"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/10\/Pate-1-location-300x297.png?resize=300%2C297&#038;ssl=1\" alt=\"Pate 1 location\" width=\"300\" height=\"297\" srcset=\"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/10\/Pate-1-location.png?resize=300%2C297&amp;ssl=1 300w, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/10\/Pate-1-location.png?resize=100%2C100&amp;ssl=1 100w, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/10\/Pate-1-location.png?w=639&amp;ssl=1 639w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a>Kipini reservoir at 4,175 metres MD with gas flowing from an uncased hole section for 2-3 days during drilling \u00a0before it was eventually brought under control and then plugged with cement and abandoned.<\/p>\n<p>The main reason for the abandoning was because the consortium was basically searching for oil and not natural gas.<\/p>\n<p>Some six years earlier the same consortium had discovered gas flowing at non-commercial rates exceeding 2 mmscf\/day at the Dodori-1 well located some 30 kilometers northeast of Pate 1 in the neighboring Block L13 where Zarara Oil and Gas operator* ( a subsidiary \u00a0of Midway Resources International) as well as Swiss Holdings and National Oil Corporation of Kenya\u00a0are joint venture partners.<\/p>\n<p>This clearly indicates a working hydrocarbon system in the area.<\/p>\n<p>Since then Zarara has since acquired the aero-gravity\/magnetic survey in 2011 as well as the 374km of seismic lines acquired in 2012. The results of the aero-gravity\/magnetic survey, processing of seismic data and information on other wells drilled in the Lamu embayment were integrated by Rockflow to determine the resource potential.<\/p>\n<p><a href=\"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/10\/Pate-2-3.png?ssl=1\"><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" class=\" size-medium wp-image-5349 alignleft\" src=\"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/10\/Pate-2-3-300x271.png?resize=300%2C271&#038;ssl=1\" alt=\"Pate 2 &amp; 3 location\" width=\"300\" height=\"271\" srcset=\"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/10\/Pate-2-3.png?resize=300%2C271&amp;ssl=1 300w, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/10\/Pate-2-3.png?resize=100%2C90&amp;ssl=1 100w, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/10\/Pate-2-3.png?w=528&amp;ssl=1 528w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a>When Pate-2 <a href=\"http:\/\/bit.ly\/2epance\">spuds<\/a> the operator has said he will be looking into assessing the connected volume to that well which have a Mid Case aggregate gross resource estimate of approximately 1,115 Bcf and determine its sustainable production.<\/p>\n<p>And this is where Pate-2 becomes more hopeful than the early oil pilot scheme that commences during the same period.<\/p>\n<p>Pate-2 is expected to be drilled to a target depth of 4,500 metres and is expected to take up to 120 days to drill, test and complete.\u00a0 According to Midway Resources If testing shows commercial quantities of natural gas (&lt;30 Bcf), the well will be completed as a producer with the view to production through an early production system as quickly as practicable.<\/p>\n<p>Pate-3 drilling is also in the works from the Pate-2 pad, and deviated using directional drilling to a vertical depth of 4,500 metres with the total measured depth will be approximately 5,000 metres. The required drilling time to approximately 120 days to drill, test and complete.<\/p>\n<p>With plans by Midway for an early production system the location of the well and proximity to existing infrastructure provides a chance for early commercialization.<\/p>\n<p><a href=\"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/10\/Pate-Phase-1-project.png?ssl=1\"><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" class=\" size-full wp-image-5350 aligncenter\" src=\"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/10\/Pate-Phase-1-project.png?resize=600%2C202&#038;ssl=1\" alt=\"Pate Phase 1 project\" width=\"600\" height=\"202\" srcset=\"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/10\/Pate-Phase-1-project.png?w=600&amp;ssl=1 600w, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/10\/Pate-Phase-1-project.png?resize=100%2C34&amp;ssl=1 100w, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/10\/Pate-Phase-1-project.png?resize=300%2C101&amp;ssl=1 300w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><\/a><\/p>\n<p>Midway plans through a gas to power development to deliver electrical power for sale into the Kenyan national grid less than 15 kms from the Pate well location through a substation at Port Lamu.<\/p>\n<p>\u201cThe project will be developed in a number of phases, expanding as national demand for power grows and as the gas resource is proved up,\u201d Midway Resources has said.<\/p>\n<p>The first phase involves the development of an early production facility requiring two wells and small gas handling and processing facilities designed to feed locally sited electricity generation modular units.<\/p>\n<p><a href=\"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/10\/Pate-late-phase-2-project.png?ssl=1\"><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" class=\" size-full wp-image-5351 aligncenter\" src=\"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/10\/Pate-late-phase-2-project.png?resize=584%2C227&#038;ssl=1\" alt=\"Pate late phase 2 project\" width=\"584\" height=\"227\" srcset=\"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/10\/Pate-late-phase-2-project.png?w=584&amp;ssl=1 584w, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/10\/Pate-late-phase-2-project.png?resize=100%2C39&amp;ssl=1 100w, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/10\/Pate-late-phase-2-project.png?resize=300%2C117&amp;ssl=1 300w\" sizes=\"auto, (max-width: 584px) 100vw, 584px\" \/><\/a><\/p>\n<p>Later as electricity demand surges there will be more drilling of wells (including Pate-SW and Pate-N prospects) and building additional gas processing and power generation facilities to allow for increased production to meet growing electricity demand.<\/p>\n<p>What however stands out in the Pate project is the close proximity to a connection to the national electricity grid and potential for a phased development to meet demand. Already the operator has said that substantially lower recoverable volumes of less than 30 Bcf are commercially viable and thus could realize revenues from the project faster than Tullow\u2019s project.<\/p>\n<p>It is a fact that Tullow and Kenya as a whole will almost never make a <a href=\"http:\/\/bit.ly\/2eKC0NV\">profit<\/a> in the first years of the project with the low price environment a contrast from the Pate project. According to sources with information on the project\u00a0the company could start power production in less than 24\u00a0after receiving a production license.<\/p>\n<p>Other estimates from the Pate project show that a successful appraisal of and production from Pate-2 and 3 wells could have sufficient commercial volumes to proceed to the Phase 1 development of a small power plant (50MW-200MW).<\/p>\n<p>Given that the Kenya is unlikely to see benefits from oil exports to commence next year till the completion of the heated crude oil pipeline not earlier than 2020 it is not strange then that some pundits are already more hopeful of the lamu county project than the EOPS.<\/p>\n<p>That said the government through the principal secretary in the Ministry for Energy &amp; Petroleum Andrew Kamau in an <a href=\"http:\/\/bit.ly\/2egaJ5n\">opinion editorial<\/a> \u00a0pointed out that EOPS is an just enabler and not a replacement for the Full Field Development (FFD.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The drilling of Pate-2 well in Lamu County\u2019s Pate Island is set to commence in Q1 2017 same time as the eagerly awaited early oil pilot scheme is set to &hellip; <a href=\"https:\/\/www.oilnewskenya.com\/index.php\/why-zararas-pate-2-result-could-overshadow-tullows-early-oil-pilot-scheme\/\" class=\"more-link\">Read More<\/a><\/p>\n","protected":false},"author":24,"featured_media":5352,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[11],"tags":[5464,4615,3508,3507,5466,4735,730,955,1252,5411,3079,5462,1444,4437,3142,1690,1696,3509,3510,3389,5465,2272,5463,2571,2765],"class_list":["post-5348","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-top-news","tag-aero-gravitymagnetic-survey","tag-andrew-kamau","tag-block-l13","tag-block-l4","tag-dodori-1-well","tag-early-oil-pilot-project","tag-electricity","tag-gas","tag-kenya","tag-lamu-county","tag-lamu-embayment","tag-lamu-island","tag-lokichar","tag-midway-resources","tag-ministry-for-energy-petroleum","tag-national-oil-corporation-of-kenya","tag-natural-gas","tag-pate-1","tag-pate-2","tag-power-generation","tag-rockflow","tag-seismic","tag-swiss-holdings","tag-tullow-oil","tag-zarara-oil-and-gas","entry"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/10\/Pate-1-location.png?fit=639%2C632&ssl=1","jetpack_shortlink":"https:\/\/wp.me\/p5JWkQ-1og","jetpack-related-posts":[{"id":6370,"url":"https:\/\/www.oilnewskenya.com\/index.php\/lobby-groups-hold-sensitization-workshop-ahead-pate-2-drilling-lamu\/","url_meta":{"origin":5348,"position":0},"title":"Lobby Groups hold Sensitization Workshop Ahead of Pate 2 drilling in Lamu","author":"","date":"October 4, 2017","format":false,"excerpt":"The World Wildlife Fund in conjunction with the Kenya Oil and Gas Working Group (KOGWG)\u00a0 has engaged community groups from Lamu and Pate Island to explain ways in which they can benefit from ongoing exploration opportunities, mitigate against perceived risks as well as enable them","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2017\/10\/DSCN2952.jpg?fit=1200%2C900&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2017\/10\/DSCN2952.jpg?fit=1200%2C900&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2017\/10\/DSCN2952.jpg?fit=1200%2C900&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2017\/10\/DSCN2952.jpg?fit=1200%2C900&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2017\/10\/DSCN2952.jpg?fit=1200%2C900&ssl=1&resize=1050%2C600 3x"},"classes":[]},{"id":6954,"url":"https:\/\/www.oilnewskenya.com\/index.php\/drilling-lamus-pate-island-commence-week\/","url_meta":{"origin":5348,"position":1},"title":"Drilling in Lamu\u2019s Pate Island to Commence This Week","author":"","date":"April 17, 2018","format":false,"excerpt":"Zarara Oil and Gas is set to spud the Pate 2 well in Lamu\u2019s Block 4 this weekend using a Drilling Services \u00a0top hole drilling rig of 750hp to a depth of 300 meters OilNews Kenya has learnt. The rig which set sail from the Mombasa port yesterday aboard a\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2018\/04\/zarara-sign-board.png?fit=516%2C346&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":3250,"url":"https:\/\/www.oilnewskenya.com\/index.php\/zarara-oil-gas-drill-well-block-l4-q2-2016\/","url_meta":{"origin":5348,"position":2},"title":"Zarara Oil and Gas to drill well in Kenya&#8217;s Block L4 in Q2 2016","author":"","date":"August 17, 2015","format":false,"excerpt":"Zarara Oil and Gas plans to drill a well in Block L4 in 2016 after postponing its earlier planned date in 2015 according to a company representative who spoke to OilNews Kenya. With the postponement the company will be banking on the hope that the Ministry of Energy will be\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/08\/Midway-Resources.png?fit=405%2C252&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":5646,"url":"https:\/\/www.oilnewskenya.com\/index.php\/zararas-pate-2-well-on-schedule-to-spud-in-april-2017\/","url_meta":{"origin":5348,"position":3},"title":"Zarara\u2019s Pate 2 well on schedule to spud in April 2017","author":"","date":"February 1, 2017","format":false,"excerpt":"Plans to drill the Pate 2 well in Kenya\u2019s Lamu basin\u2019s block L4 are on course with well designing by Norwell Engineering currently ongoing according to Zarara Oil and Gas country manager Peter Nduru. Plans to acquire a rig are also progressing as scheduled with the company yet to award\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/10\/Pate-1-location.png?fit=639%2C632&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/10\/Pate-1-location.png?fit=639%2C632&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/10\/Pate-1-location.png?fit=639%2C632&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":5318,"url":"https:\/\/www.oilnewskenya.com\/index.php\/zarara-oil-gas-in-csr-drive-in-lamu-county-ahead-of-pate-2-drilling\/","url_meta":{"origin":5348,"position":4},"title":"Zarara Oil &#038; Gas in CSR Drive in Lamu County Ahead of Pate-2 Drilling","author":"","date":"October 18, 2016","format":false,"excerpt":"Zarara Oil and Gas a subsidiary of Midway Resources (MRI) the operator in Lamu basins block L4 and L13 has donated books worth Kshs. 2.5 million (approx. $25,000) to all primary and secondary schools located towards the east of the county. According to Zarara country representative Peter Nduru the education\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/10\/Pate-1-location.png?fit=639%2C632&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/10\/Pate-1-location.png?fit=639%2C632&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/10\/Pate-1-location.png?fit=639%2C632&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":4228,"url":"https:\/\/www.oilnewskenya.com\/index.php\/zarara-oil-and-gas-receives-18-month-extension-in-kenyas-blocks-l4-l13\/","url_meta":{"origin":5348,"position":5},"title":"Zarara Oil and Gas Receives 18 month Extension in Kenya\u2019s Blocks L4 &#038; L13","author":"","date":"January 7, 2016","format":false,"excerpt":"Kenya\u2019s Block L4 & L13 operator Zarara Oil and Gas has said it has been granted an 18 month licence extension\u00a0through\u00a0to June 2017,\u00a0to the First Additional Exploration Period on both of the production sharing contracts. Zarara Oil and Gas which is a wholly owned subsidiary of Midway Resources International (MRI)\u00a0says\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/08\/Midway-Resources.png?fit=405%2C252&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]}],"jetpack_sharing_enabled":true,"jetpack_likes_enabled":true,"_links":{"self":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/5348","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/comments?post=5348"}],"version-history":[{"count":5,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/5348\/revisions"}],"predecessor-version":[{"id":5861,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/5348\/revisions\/5861"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media\/5352"}],"wp:attachment":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media?parent=5348"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/categories?post=5348"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/tags?post=5348"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}