{"id":5169,"date":"2016-09-19T18:35:33","date_gmt":"2016-09-19T18:35:33","guid":{"rendered":"http:\/\/www.oilnewskenya.com\/?p=5169"},"modified":"2017-01-24T18:46:04","modified_gmt":"2017-01-24T18:46:04","slug":"shell-to-commence-exploration-drilling-in-tanzanias-blocks-1-and-4","status":"publish","type":"post","link":"https:\/\/www.oilnewskenya.com\/index.php\/shell-to-commence-exploration-drilling-in-tanzanias-blocks-1-and-4\/","title":{"rendered":"Shell to Commence Exploration Drilling In Tanzania\u2019s Blocks 1 and 4"},"content":{"rendered":"<p>Shell will in the coming weeks re-commence exploration drilling in Blocks 1 and 4 and a 2 well programme has already been agreed on at a cost of $20M according to joint venture partner Ophir Energy.<\/p>\n<p>Ophir in its latest presentation notes that progress has been made in Tanzania that allows for recommencement after the partners shelved exploration due to low oil prices. These developments \u00a0include the awarding of the land for the site of the LNG plant as well as a new president who views the LNG project as strategic.<\/p>\n<p>During the absence block operator BG Group was also <a href=\"http:\/\/bit.ly\/2d6eLle\">acquired<\/a> by Royal Dutch Shell\u00a0leading to a new operator in the three blocks including Block 2 that jointly hold 16 consecutive successful exploration and appraisal wells drilled discovering in excess of 16Tcf.<\/p>\n<p>Among discoveries in Block 1 include: <a href=\"http:\/\/bit.ly\/2cLtoGB\">Taachui<\/a>, <a href=\"http:\/\/bit.ly\/2cTRXmW\">Mzia<\/a>, Mkizi, Jodari and Chaza while those in Block 4 include: Chewa, Ngisi, <a href=\"http:\/\/bit.ly\/2cku88v\">Kamba, Fulusi<\/a> and Pweza.<\/p>\n<p>Development planning of the Block 1 and Block\u00a04 upstream projects, and the LNG plant projects had been expected to continue during 2015 while work is also underway in preparation for the next exploration drilling campaign in Blocks 1 and 4 were projected to start in 2016.<\/p>\n<p><a href=\"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/09\/Block-1-4.png?ssl=1\"><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" class=\" size-medium wp-image-5170 alignleft\" src=\"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/09\/Block-1-4-221x300.png?resize=221%2C300&#038;ssl=1\" alt=\"Block 1 &amp; 4\" width=\"221\" height=\"300\" srcset=\"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/09\/Block-1-4.png?resize=221%2C300&amp;ssl=1 221w, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/09\/Block-1-4.png?resize=74%2C100&amp;ssl=1 74w, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/09\/Block-1-4.png?w=395&amp;ssl=1 395w\" sizes=\"auto, (max-width: 221px) 100vw, 221px\" \/><\/a>Tanzania\u2019s Blocks 1 and 4\u00a0have a net contingent (2C) resource of 17\u00a0Tcf .<\/p>\n<p>In 2014 the JV Partners in Blocks 1 and 4 and the partners in Block 2 (Statoil and ExxonMobil) signed an agreement to co-operate on a combined onshore <a href=\"http:\/\/bit.ly\/2cTSkhn\">LNG plant<\/a>. The Block 1 and 4 partners, Block 2 partners and the Government also signed a MoU for the project including the site of the LNG plant and the process for acquiring the <a href=\"http:\/\/bit.ly\/2cDlKlG\">land<\/a> and for how any resettlement will be managed.<\/p>\n<p>The project is currently in the pre-FEED\u00a0stage and is expected to enter into FEED following the completion of the LNG site acquisition, the geotechnical investigations and engineering studies. In parallel, the concept selection for the upstream part of the project which will determine the configuration and production rates from each of the fields.<\/p>\n<p>In 2014 BG Group withdrew from its 60% equity interest in Block 3 with the company writing off a $74 million exploration charge.<\/p>\n<p>Prior to the take-over Shell already had 4 blocks offshore Zanzibar although a dispute between Tanzania and semi-autonomous Zanzibar which has blocked their exploration for over a decade.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Shell will in the coming weeks re-commence exploration drilling in Blocks 1 and 4 and a 2 well programme has already been agreed on at a cost of $20M according &hellip; <a href=\"https:\/\/www.oilnewskenya.com\/index.php\/shell-to-commence-exploration-drilling-in-tanzanias-blocks-1-and-4\/\" class=\"more-link\">Read More<\/a><\/p>\n","protected":false},"author":24,"featured_media":5171,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[11],"tags":[253,282,3899,3903,860,3234,941,1209,5155,5156,3901,1665,3904,1926,1979,3905,2297,2404,3902],"class_list":["post-5169","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-top-news","tag-block-1","tag-block-4","tag-chaza","tag-chewa","tag-exxonmobil","tag-feed","tag-fulusi","tag-jodari","tag-kamba","tag-lng-plant","tag-mkizi","tag-mzia","tag-ngisi","tag-ophir-energy","tag-pavilion-energy","tag-pweza","tag-shell","tag-statoil","tag-taachui","entry"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/09\/Tanzania-Block-1-4.png?fit=563%2C444&ssl=1","jetpack_shortlink":"https:\/\/wp.me\/p5JWkQ-1ln","jetpack-related-posts":[{"id":5371,"url":"https:\/\/www.oilnewskenya.com\/index.php\/shell-jv-partners-gear-up-to-commence-drilling-programme-in-tanzania\/","url_meta":{"origin":5169,"position":0},"title":"Shell, JV Partners gear up to commence drilling programme in Tanzania","author":"","date":"November 3, 2016","format":false,"excerpt":"Shell and its joint venture partners, Pavilion Energy and Ophir Energy have announced the start of its drilling programme covering two wells in Block 1 and 4, located in the Mafia Deep basin off Tanzania. The rig supporting the programme \u2013 the Noble Globe Trotter 2 \u2013 is expected to\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/11\/Block-1-and-4.jpg?fit=626%2C845&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/11\/Block-1-and-4.jpg?fit=626%2C845&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/11\/Block-1-and-4.jpg?fit=626%2C845&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":5578,"url":"https:\/\/www.oilnewskenya.com\/index.php\/shell-unlucky-in-tanzanias-blocks-1-and-4-offshore-drilling\/","url_meta":{"origin":5169,"position":1},"title":"Shell Unlucky in Tanzania\u2019s Blocks 1 and 4 Offshore Drilling","author":"","date":"January 18, 2017","format":false,"excerpt":"Block 1 and 4 operator shell failed to encounter any hydrocarbons at the Kitatange-1 well in Block 1 and Bunju-1 well in Block 4 both in Tanzania. According to Shell, after evaluation the operator confirmed that good quality reservoir was encountered in both wells. The Noble Globetrotter 2 rig which\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/09\/Tanzania-Block-1-4.png?fit=563%2C444&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/09\/Tanzania-Block-1-4.png?fit=563%2C444&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/09\/Tanzania-Block-1-4.png?fit=563%2C444&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":5868,"url":"https:\/\/www.oilnewskenya.com\/index.php\/shell-gets-42-month-extension-in-block-1-tanzania\/","url_meta":{"origin":5169,"position":2},"title":"Shell Gets 42 month extension in Block 1, Tanzania","author":"","date":"April 13, 2017","format":false,"excerpt":"The minister for energy in Tanzania has awarded an extension of Block 1 for a further three and\u00a0a\u00a0half years to Block operator Shell to provide sufficient time to\u00a0complete pre-FEED and FEED ahead of\u00a0investment approval.Earlier the companies had announced the awarding of a bridging license without any further details. Already the\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/09\/Tanzania-Block-1-4.png?fit=563%2C444&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/09\/Tanzania-Block-1-4.png?fit=563%2C444&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/09\/Tanzania-Block-1-4.png?fit=563%2C444&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":11099,"url":"https:\/\/www.oilnewskenya.com\/index.php\/tanzania-hopes-for-fid-on-its-offshore-lng-projects-as-discussions-with-iocs-commence\/","url_meta":{"origin":5169,"position":3},"title":"Tanzania Hopes for FID on its Offshore LNG Projects as Discussions with IOCs Commence","author":"","date":"November 9, 2021","format":false,"excerpt":"Tanzania through its Minister for Energy January Makamba has reported that the government has started negotiations for the $30bn Tanzania LNG project with international oil companies including and Shell, Equinor, Pavillion, ExxonMobil na Ophir. The IOCs stalled the development of their assets under former Tanzanian President John Maghufuli with the\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/11\/tanzania-lindi-gas-plant.gif?fit=777%2C437&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/11\/tanzania-lindi-gas-plant.gif?fit=777%2C437&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/11\/tanzania-lindi-gas-plant.gif?fit=777%2C437&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/11\/tanzania-lindi-gas-plant.gif?fit=777%2C437&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":1616,"url":"https:\/\/www.oilnewskenya.com\/index.php\/pavilion-energys-transaction-with-ophir-to-finance-tanzanian-operations-in-2015\/","url_meta":{"origin":5169,"position":4},"title":"Pavilion Energy&#8217;s transaction with Ophir to finance Tanzanian operations in 2015","author":"Samuel Kamau Mbote","date":"August 14, 2014","format":false,"excerpt":"Ophir Energy says its completion of the divestment of a 20% interest in Blocks 1, 3 and 4, Tanzania to Pavilion Energy for S$1.25 billion (pre-tax) with a further US$38 million payable on Final Investment Decision will help the company finance its operations in the country through to 2015. Operations\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":259,"url":"https:\/\/www.oilnewskenya.com\/index.php\/new-discovery-raises-tanzania-resources-to-15-tcf\/","url_meta":{"origin":5169,"position":5},"title":"New discovery at Mzia Discovery raises Tanzania resources to 15 tcf","author":"Samuel Kamau Mbote","date":"December 15, 2013","format":false,"excerpt":"[twitter-follow screen_name='oilnewskenya'] BG Group has announced an increase in total recoverable resources for the Mzia discovery and across Blocks 1, 3 and 4 offshore southern Tanzania, marking the conclusion of a successful drilling and testing campaign. The campaign confirmed Mzia as the second giant gas discovery, after Jodari, in BG\u2026","rel":"","context":"In &quot;New Discoveries&quot;","block_context":{"text":"New Discoveries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/new-discoveries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2013\/12\/tanzania_dsm_main.png?fit=1200%2C422&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2013\/12\/tanzania_dsm_main.png?fit=1200%2C422&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2013\/12\/tanzania_dsm_main.png?fit=1200%2C422&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2013\/12\/tanzania_dsm_main.png?fit=1200%2C422&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2013\/12\/tanzania_dsm_main.png?fit=1200%2C422&ssl=1&resize=1050%2C600 3x"},"classes":[]}],"jetpack_sharing_enabled":true,"jetpack_likes_enabled":true,"_links":{"self":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/5169","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/comments?post=5169"}],"version-history":[{"count":2,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/5169\/revisions"}],"predecessor-version":[{"id":5577,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/5169\/revisions\/5577"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media\/5171"}],"wp:attachment":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media?parent=5169"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/categories?post=5169"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/tags?post=5169"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}