{"id":5153,"date":"2016-09-14T08:34:41","date_gmt":"2016-09-14T08:34:41","guid":{"rendered":"http:\/\/www.oilnewskenya.com\/?p=5153"},"modified":"2017-01-24T18:57:05","modified_gmt":"2017-01-24T18:57:05","slug":"tanzanias-kito-prospect-drilling-in-doubt-as-jv-dispute-rages","status":"publish","type":"post","link":"https:\/\/www.oilnewskenya.com\/index.php\/tanzanias-kito-prospect-drilling-in-doubt-as-jv-dispute-rages\/","title":{"rendered":"Tanzania\u2019s Kito Prospect Drilling in Doubt as JV dispute rages"},"content":{"rendered":"<p>The drilling of the Kito prospect in the Kilosa-Kilombero license in Tanzania earlier set for Q3 2016 is in doubt going by the latest corporate presentation by JV partner Otto Energy.<\/p>\n<p>In <a href=\"http:\/\/bit.ly\/2atlHCS\">March<\/a> Block operator Swala Energy had said that all is set to drill at the Kilosa Kilombero license in Q3 2016 with the latest feasibility study showing the majority of roads and bridges are suitable to move a rig. The company had suggested the improvement of one river crossing near the site as well as road survey ahead of drilling to ensure all hazards and obstacles are identified.<\/p>\n<p>The presentation dated 13<sup>th<\/sup> September by Otto Energy however shows that the drilling has been pushed to Q3 2017.<\/p>\n<p><a href=\"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/09\/Otto-Energy-Work-Plan.png?ssl=1\"><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-5154\" src=\"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/09\/Otto-Energy-Work-Plan.png?resize=900%2C578&#038;ssl=1\" alt=\"Otto Energy Work Plan\" width=\"900\" height=\"578\" srcset=\"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/09\/Otto-Energy-Work-Plan.png?w=963&amp;ssl=1 963w, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/09\/Otto-Energy-Work-Plan.png?resize=100%2C64&amp;ssl=1 100w, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/09\/Otto-Energy-Work-Plan.png?resize=300%2C193&amp;ssl=1 300w, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/09\/Otto-Energy-Work-Plan.png?resize=768%2C493&amp;ssl=1 768w\" sizes=\"auto, (max-width: 900px) 100vw, 900px\" \/><\/a><\/p>\n<p>A dispute has been ongoing between the two Australian\u00a0partners in the block on a host of issues including:<\/p>\n<ul>\n<li>defaults in relation to non-payment by SOGTP of cash calls and associated interest accrued under the JOAs;<\/li>\n<li>claims by Otto Tanzania for payment of interest accruing under the JOAs as a result of SOGTP\u2019s defaults, amounting to approximately US$360,000; and<\/li>\n<li>the removal of SOGTP as Operator of the Kilosa-Kilombero licence area following SOGTP\u2019s failure to satisfy the joint venture partners that it is not insolvent.<\/li>\n<\/ul>\n<p>The Kito-1 prospect was set to drill at the Kilosa Kilombero license in September 2016 with the contract\u00a0<a href=\"http:\/\/ow.ly\/105Y3H\">awarded<\/a>\u00a0the Drill Support Team contract for the 2016 drilling campaign to the Tanzanian subsidiary of AWT International (Asia) Sdn Bhd, a Singapore-headquartered firm offering subsurface, subsea and surface facilities engineering services and contracting solutions to the oil and gas industry.<\/p>\n<p>Another dispute has been ongoing since May 2016 when Swala Energy Limited said it has been\u00a0<a href=\"http:\/\/bit.ly\/2alpJOw\">served notice<\/a>\u00a0by lawyers acting on behalf of Otto Energy Limited that Otto has commenced a legal action against the Company, Swala Oil and Gas (Tanzania) plc (SOGTP) and current and certain former directors of the Company seeking to recover a gross amount of approximately US$1,000,000 plus alleged damages.<\/p>\n<p>The four joint venture partners in the two blocks currently have a 25 percent interest each. Among the partners include the\u00a0 Swala Energy (operator), Otto Energy, Tata Petrodyne, and MV Upstream a joint venture between Vegas Oil &amp; Gas Limited, (Vegas) and Motor Oil Hellas SA (MOH).<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The drilling of the Kito prospect in the Kilosa-Kilombero license in Tanzania earlier set for Q3 2016 is in doubt going by the latest corporate presentation by JV partner Otto &hellip; <a href=\"https:\/\/www.oilnewskenya.com\/index.php\/tanzanias-kito-prospect-drilling-in-doubt-as-jv-dispute-rages\/\" class=\"more-link\">Read More<\/a><\/p>\n","protected":false},"author":24,"featured_media":4536,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[11],"tags":[3773,1329,4603,4601,4079,1940,2447,2452,2466,4193,4602],"class_list":["post-5153","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-top-news","tag-awt-international","tag-kilosa-kilombero-license","tag-motor-oil-hellas-sa","tag-mv-upstream","tag-operator","tag-otto-energy","tag-swala-energy","tag-swala-oil-and-gas-tanzania-plc","tag-tanzania","tag-tata-petrodyne","tag-vegas-oil-gas-limited","entry"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/03\/Kito-Prospect-Map.png?fit=899%2C529&ssl=1","jetpack_shortlink":"https:\/\/wp.me\/p5JWkQ-1l7","jetpack-related-posts":[{"id":5712,"url":"https:\/\/www.oilnewskenya.com\/index.php\/swala-oil-gas-hints-12-month-license-extension-in-tanzanias-kilosa-kilombero\/","url_meta":{"origin":5153,"position":0},"title":"Swala Oil &#038; Gas Hints 12 month License Extension in Tanzania\u2019s Kilosa Kilombero","author":"","date":"February 27, 2017","format":false,"excerpt":"Swala Oil & Gas (Tanzania) plc has announced that it has received a 12 month extension from the Ministry of Energy and Mines at the Kilosa Kilombero license although with a caveat that the contractors provide financial guarantees covering the minimum well commitment before it extended the Production Sharing Agreement\u2026","rel":"","context":"In &quot;Oil Politics&quot;","block_context":{"text":"Oil Politics","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/oil-politics\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/10\/swala-energy-1.jpg?fit=650%2C451&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/10\/swala-energy-1.jpg?fit=650%2C451&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/10\/swala-energy-1.jpg?fit=650%2C451&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":5289,"url":"https:\/\/www.oilnewskenya.com\/index.php\/swala-energy-pushes-tanzanias-kito-1-drilling-pushed-to-2017\/","url_meta":{"origin":5153,"position":1},"title":"Swala Energy Pushes Tanzania&#8217;s Kito 1 Drilling Pushed to 2017","author":"","date":"October 14, 2016","format":false,"excerpt":"Swala Oil & Gas (Tanzania) plc has announced that it will not be drilling the Kito-1 exploration well in the Kilosa-Kilombero licence during 2016 as originally envisaged in part because of the delays imposed by the timing of the necessary permits. Despite planning for the well proceeded within time and\u2026","rel":"","context":"In &quot;Oil Politics&quot;","block_context":{"text":"Oil Politics","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/oil-politics\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/03\/Kito-Prospect-Map.png?fit=899%2C529&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/03\/Kito-Prospect-Map.png?fit=899%2C529&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/03\/Kito-Prospect-Map.png?fit=899%2C529&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/03\/Kito-Prospect-Map.png?fit=899%2C529&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":4889,"url":"https:\/\/www.oilnewskenya.com\/index.php\/otto-energy-pushes-to-remove-swala-energy-as-operator-in-tanzanias-kilosa-kilombero-license\/","url_meta":{"origin":5153,"position":2},"title":"Otto Energy pushes to Remove Swala Energy as Operator in Tanzania&#8217;s Kilosa-Kilombero License","author":"","date":"August 1, 2016","format":false,"excerpt":"Otto Energy Ltd through its wholly-owned subsidiary, Otto Energy (Tanzania) Pty Ltd, has said \u00a0it wants current operator Pangani and Kilosa-Kilombero licenses relieved off its role after defaulting in various cash calls. According to Otto Energy its subsidiary has issued various notices to Swala Oil and Gas (Tanzania) plc (SOGTP),\u2026","rel":"","context":"In &quot;Oil Politics&quot;","block_context":{"text":"Oil Politics","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/oil-politics\/"},"img":{"alt_text":"Kito Prospect Map","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/03\/Kito-Prospect-Map.png?resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/03\/Kito-Prospect-Map.png?resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/03\/Kito-Prospect-Map.png?resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/03\/Kito-Prospect-Map.png?resize=700%2C400 2x"},"classes":[]},{"id":5434,"url":"https:\/\/www.oilnewskenya.com\/index.php\/swala-energy-jv-partners-risk-losing-kilosa-kilombero-in-tanzania\/","url_meta":{"origin":5153,"position":3},"title":"Swala Energy JV Partners Risk Losing Kilosa-Kilombero in Tanzania","author":"","date":"November 28, 2016","format":false,"excerpt":"Kilosa-Kilombero block operator Swala and joint venture partners Otto Energy, Tata Petrodyne and MV Upstream are in the risk of losing their license with every indication they are likely to meet their commitment obligations following their ongoing dispute and court case in the Australian high court. The partners had earlier\u2026","rel":"","context":"In &quot;Oil Politics&quot;","block_context":{"text":"Oil Politics","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/oil-politics\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/03\/Kito-Prospect-Map.png?fit=899%2C529&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/03\/Kito-Prospect-Map.png?fit=899%2C529&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/03\/Kito-Prospect-Map.png?fit=899%2C529&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/03\/Kito-Prospect-Map.png?fit=899%2C529&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":5908,"url":"https:\/\/www.oilnewskenya.com\/index.php\/otto-energy-doubtful-of-kito-1-drilling-until-disputes-are-resolved\/","url_meta":{"origin":5153,"position":4},"title":"Otto Energy Doubtful of Kito-1 Drilling Until Disputes Are Resolved","author":"","date":"May 4, 2017","format":false,"excerpt":"Joint venture partner in the Kilosa-Kilombero license Australian explorer Otto Energy has poured cold water on the drilling of Kito-1 well until outstanding disputes with Operator, Swala Oil & Gas (Tanzania) plc (SOGT) \u00a0are resolved in its latest quarterly report. \u201cForward Plan Until the outstanding joint venture disputes are resolved,\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"Kilosa Kilombero work programme guarantee","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2017\/02\/Kilosa-Kilombero-work-programme-guarantee.png?resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2017\/02\/Kilosa-Kilombero-work-programme-guarantee.png?resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2017\/02\/Kilosa-Kilombero-work-programme-guarantee.png?resize=525%2C300 1.5x"},"classes":[]},{"id":7053,"url":"https:\/\/www.oilnewskenya.com\/index.php\/swala-oil-gas-pushes-kito-1-well-drilling-2019\/","url_meta":{"origin":5153,"position":5},"title":"Swala Oil &#038; Gas Pushes Kito 1 Well Drilling to 2019","author":"","date":"June 12, 2018","format":false,"excerpt":"The drilling of the Kito 1 well in Tanzania\u2019s Kilosa Kilombero license will likely happen in 2019 following the signing of a Memorandum of Understanding between Swala Oil and Gas, the Tanzania Petroleum Development Corporation and the Tanzania Wildlife Management Authority that will ensure that the explorer receives, in a\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]}],"jetpack_sharing_enabled":true,"jetpack_likes_enabled":true,"_links":{"self":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/5153","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/comments?post=5153"}],"version-history":[{"count":2,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/5153\/revisions"}],"predecessor-version":[{"id":5156,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/5153\/revisions\/5156"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media\/4536"}],"wp:attachment":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media?parent=5153"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/categories?post=5153"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/tags?post=5153"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}