{"id":5116,"date":"2016-09-01T12:56:35","date_gmt":"2016-09-01T12:56:35","guid":{"rendered":"http:\/\/www.oilnewskenya.com\/?p=5116"},"modified":"2017-01-24T19:25:15","modified_gmt":"2017-01-24T19:25:15","slug":"cepsa-erhc-hit-dry-well-at-kenyas-block-11a-tarach-1","status":"publish","type":"post","link":"https:\/\/www.oilnewskenya.com\/index.php\/cepsa-erhc-hit-dry-well-at-kenyas-block-11a-tarach-1\/","title":{"rendered":"CEPSA, ERHC Hit Dry Well at Kenya\u2019s Block 11A Tarach-1"},"content":{"rendered":"<p>Earlier reports by OilNews Kenya that the Tarach-1 well in Block 11A was <a href=\"http:\/\/bit.ly\/2bBalkX\">disappointing<\/a> have now been confirmed with the commissioner for petroleum Martin Heya at the Ministry of Energy and Petroleum saying\u00a0the Spanish explorer Compania Espanola de Petroleos\u00a0 (CEPSA)was a dry well.<\/p>\n<p>According to the commissioner the block operator is yet to furnish the ministry with the technical details of the drilling although it has notified the government on the status of the well.<\/p>\n<p>&#8220;We are yet to get the technical details from CEPSA although we already have word that Tarach-1 was a dry well,&#8221; Heya told OilNews Kenya.<\/p>\n<p>Results from the Tarach-1 drilled in the north western most block in Kenya and which <a href=\"http:\/\/bit.ly\/2bV3IIJ\">commenced<\/a> drilling over five months ago are yet to be made public with the well already having been plugged.<\/p>\n<p>Tarach 1\u00a0was drilled from a 20-inch surface casing through intermediate casings down to 2,442 meters and set a seven-inch liner down to total depth (TD) of 3,000 meters with the Tarach-1 prospect\u2019s mean estimate of oil prospective unrisked resources earlier estimated at 66 million barrels.<\/p>\n<p>As per records on exploration and drilling <a href=\"http:\/\/bit.ly\/2ctctfJ\">expenses<\/a> filed by ERHC to the United States Securities And Exchange Commission the two partners used over $25 million of which the American explorer sank $4.5 million.<\/p>\n<p>Also in the interview the commissioner revealed that the block operator CEPSA\u00a0was considering undertaking new seismic in the block raising hope that the Spanish explorer was yet to exit the block.<\/p>\n<p>With this revelation it is expected that the two joint venture could be discussing a new arrangement that could allow further activity in the block as the earlier agreement only allowed a continued participation by CEPSA only in the case of a hydrocarbons find.<\/p>\n<p>CEPSA had also\u00a0planned second exploratory well , the Egole-1 a four-way rollover closure onto a Northwest \u2013 Southeast trending fault plain with mean prospective resources of 101 million barrels another of 13 drillable <a href=\"http:\/\/bit.ly\/2bTeJYw\">prospects<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Earlier reports by OilNews Kenya that the Tarach-1 well in Block 11A was disappointing have now been confirmed with the commissioner for petroleum Martin Heya at the Ministry of Energy &hellip; <a href=\"https:\/\/www.oilnewskenya.com\/index.php\/cepsa-erhc-hit-dry-well-at-kenyas-block-11a-tarach-1\/\" class=\"more-link\">Read More<\/a><\/p>\n","protected":false},"author":24,"featured_media":4579,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[11],"tags":[261,431,5092,494,4187,3129,796,3143,1589],"class_list":["post-5116","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-top-news","tag-block-11a","tag-cepsa","tag-commissioner-for-petroleum","tag-compania-espanola-de-petroleos","tag-dry-well","tag-egole-1","tag-erhc","tag-martin-heya","tag-ministry-of-energy-and-petroleum","entry"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/04\/Tarach-1-well-rig.png?fit=551%2C412&ssl=1","jetpack_shortlink":"https:\/\/wp.me\/p5JWkQ-1kw","jetpack-related-posts":[{"id":5809,"url":"https:\/\/www.oilnewskenya.com\/index.php\/tarach-1-well-now-classified-as-dry-cepsa\/","url_meta":{"origin":5116,"position":0},"title":"Tarach 1 Well Now classified as Dry &#8211; CEPSA","author":"","date":"March 27, 2017","format":false,"excerpt":"The Tarach 1 well drilled in April 2016 was dry as earlier reported by OilNews Kenya according to the latest SEC filing by joint venture partner ERHC. \u201cOperator analysis of the results if the Tarach-1 well shows that it did not encounter any reservoirs. The operator has therefore classified Tarach-1\u2026","rel":"","context":"In &quot;New Discoveries&quot;","block_context":{"text":"New Discoveries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/new-discoveries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/07\/kenya-block-11a-2.jpg?fit=300%2C258&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":5400,"url":"https:\/\/www.oilnewskenya.com\/index.php\/erhc-reports-oil-gas-shows-at-kenyas-tarach-1-well\/","url_meta":{"origin":5116,"position":1},"title":"ERHC Reports Oil &#038; Gas Shows At Kenya\u2019s Tarach-1 Well","author":"","date":"November 16, 2016","format":false,"excerpt":"American explorer ERHC has said it encountered significant oil shows and highly-elevated gas readings at the Tarach-1 well located in Block 11A indicating the presence of a working petroleum system with the strong possibility of significant hydrocarbon generation. According to the latest update from the oil explorer Tarach-1 well encountered\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/12\/block-11A.jpg?fit=234%2C215&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":6395,"url":"https:\/\/www.oilnewskenya.com\/index.php\/cepsa-withdraws-kenyas-block-11a\/","url_meta":{"origin":5116,"position":2},"title":"CEPSA Withdraws From Kenya\u2019s Block 11A","author":"","date":"October 11, 2017","format":false,"excerpt":"CEPSA Kenya Limited, an affiliate of Compa\u00f1\u00eda Espa\u00f1ola de Petr\u00f3leos, S.A.U. has withdrawn from Block 11A months after the unsuccessful drilling of Tarach 1 well OilNews Kenya has learnt. Confirming the exit principal secretary in the Ministry of Energy and Petroleum Andrew Kamau told OilNews Kenya that the Spanish explorer\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/07\/kenya-block-11a-2.jpg?fit=300%2C258&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":4758,"url":"https:\/\/www.oilnewskenya.com\/index.php\/cepsa-erhc-disappointed-at-kenyas-block-11a-tarach-1-well-source\/","url_meta":{"origin":5116,"position":3},"title":"CEPSA, ERHC Disappointed at Kenya\u2019s Block 11A Tarach-1 well &#8211; Source","author":"","date":"June 15, 2016","format":false,"excerpt":"OilNews Kenya has learnt that the search for oil and gas at Tarach-1 in Kenya\u2019s Block 11A has not been successful and works are ongoing to plug the well according to a reliable source. The drilling that commenced on 14th April 2016 using the SMP 106 rig in the north\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/04\/Tarach-1-well-rig.png?fit=551%2C412&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/04\/Tarach-1-well-rig.png?fit=551%2C412&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/04\/Tarach-1-well-rig.png?fit=551%2C412&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":5071,"url":"https:\/\/www.oilnewskenya.com\/index.php\/tarach-1-well-in-kenyas-block-11a-cost-cepsa-erhc-over-25m\/","url_meta":{"origin":5116,"position":4},"title":"Tarach-1 well in Kenya\u2019s Block 11A cost CEPSA, ERHC over $25M","author":"","date":"August 24, 2016","format":false,"excerpt":"The Tarach-1 well which commenced drilling on April 14th 2016 in Block 11A could have cost the two joint venture partners Compania Espanola de Petroleos (CEPSA) operator* and ERHC over $25 million going by exploration and drilling expenses filed by ERHC to the United States Securities And Exchange Commission. ERHC\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/04\/Tarach-1-well-rig.png?fit=551%2C412&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/04\/Tarach-1-well-rig.png?fit=551%2C412&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/04\/Tarach-1-well-rig.png?fit=551%2C412&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":2846,"url":"https:\/\/www.oilnewskenya.com\/index.php\/cepsa-erhc-identify-drilling-location-kenyas-block-11a\/","url_meta":{"origin":5116,"position":5},"title":"CEPSA, ERHC identify drilling location in Kenya\u2019s Block 11A","author":"","date":"April 23, 2015","format":false,"excerpt":"Spanish exploration company CEPSA and Houston based explorer ERHC have said that its exploration team has identified the Tarach-1 prospect as the drilling location for the first exploration well set to be drilled in March 2016 in an announcement by ERHC. This decision was based on interpretation of 1,086.6 kilometers\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/07\/kenya-block-11a-2.jpg?fit=300%2C258&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]}],"jetpack_sharing_enabled":true,"jetpack_likes_enabled":true,"_links":{"self":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/5116","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/comments?post=5116"}],"version-history":[{"count":3,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/5116\/revisions"}],"predecessor-version":[{"id":5399,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/5116\/revisions\/5399"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media\/4579"}],"wp:attachment":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media?parent=5116"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/categories?post=5116"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/tags?post=5116"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}