{"id":5093,"date":"2016-08-29T10:39:07","date_gmt":"2016-08-29T10:39:07","guid":{"rendered":"http:\/\/www.oilnewskenya.com\/?p=5093"},"modified":"2017-01-24T19:36:48","modified_gmt":"2017-01-24T19:36:48","slug":"seismic-acquisition-in-kenyas-block-2a-paralyzed-after-row-with-local-community","status":"publish","type":"post","link":"https:\/\/www.oilnewskenya.com\/index.php\/seismic-acquisition-in-kenyas-block-2a-paralyzed-after-row-with-local-community\/","title":{"rendered":"Seismic Acquisition in Kenya\u2019s Block 2A Paralyzed After Row With Local Community"},"content":{"rendered":"<p>Oil exploration in Wajir has been paralyzed for about a week after equipment being utilized in the ongoing 2D seismic acquisition was vandalized as the local community blamed Simba Energy of not honoring the MoU.<\/p>\n<p>According to the company country managing director James Jenkin members of the local committee have incited the community misleading them on the effect of the ongoing seismic exercise.<\/p>\n<p>\u201cWe are here and we just want to work, we have abided by rules and regulations set by the local and national government. Individuals have been misled on our workings on the ground and how this will destroy their lives,\u201d says Jenkins.<\/p>\n<p>A member of the committee has however accused the company of not honoring the MoU it signed with the community saying the company must abide or pack and leave.<\/p>\n<p>According to another member the company has contributed to the area with jobs as well as income and those opposed to its activities are not honest.<\/p>\n<p>2D seismic which <a href=\"http:\/\/bit.ly\/2bkUX78\">commenced<\/a> in June started on a rocky start following days of opposition by the adjacent community in Wajir who feared that the exercise would lead to the destruction of the environment and displacement from fields the pastoralist communities grazes their animals for pasture.<\/p>\n<p>The seismic exercise involves the acquiring and interpreting of up to 500 line kms of 2D seismic data which will also confirm depths and support the volume estimates necessary for a revised resource estimate and risk category for the concession\u2019s prospects and other secondary targeted structures.<\/p>\n<p>Just last week Essel Group Middle East a joint venture partner in Kenya\u2019s Block 2A <a href=\"http:\/\/bit.ly\/2c2Jafr\">announced<\/a> it had entered into a definitive agreement to acquire a new skid mounted drilling rig as it prepares to <a href=\"http:\/\/bit.ly\/2bQGrW6\">drill<\/a>\u00a0in the license in Q4 2016.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Oil exploration in Wajir has been paralyzed for about a week after equipment being utilized in the ongoing 2D seismic acquisition was vandalized as the local community blamed Simba Energy &hellip; <a href=\"https:\/\/www.oilnewskenya.com\/index.php\/seismic-acquisition-in-kenyas-block-2a-paralyzed-after-row-with-local-community\/\" class=\"more-link\">Read More<\/a><\/p>\n","protected":false},"author":24,"featured_media":1609,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[11],"tags":[26,274,775,3301,837,5047,1252,1827,4577,2312,2695],"class_list":["post-5093","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-top-news","tag-2d-seismic","tag-block-2b","tag-environment","tag-essel-group-middle-east","tag-exploration","tag-james-jenkin","tag-kenya","tag-oil","tag-pastoralist","tag-simba-energy","tag-wajir","entry"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/08\/block-2a.png?fit=301%2C269&ssl=1","jetpack_shortlink":"https:\/\/wp.me\/p5JWkQ-1k9","jetpack-related-posts":[{"id":4518,"url":"https:\/\/www.oilnewskenya.com\/index.php\/2d-seismic-in-kenyas-block-2a-to-commence-in-may-2016\/","url_meta":{"origin":5093,"position":0},"title":"2D Seismic in Kenya\u2019s Block 2A To Commence in May 2016","author":"","date":"March 22, 2016","format":false,"excerpt":"Simba Energy has said that through its subsidiary Company Simba Africa Rift Limited together with its farm in partner Essel Group ME (EGME), have agreed that the 2D Seismic Data Acquisition and Processing program will cover approximately 500 line km of survey to commence in early May 2016. Simba says\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"wajir passive seismic","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/03\/wajir-passive-seismic-300x200.jpg?resize=350%2C200","width":350,"height":200},"classes":[]},{"id":4761,"url":"https:\/\/www.oilnewskenya.com\/index.php\/2d-seismic-commences-in-kenyas-block-2a-amid-tension\/","url_meta":{"origin":5093,"position":1},"title":"2D Seismic Commences in Kenya\u2019s Block 2A Amid Tension","author":"","date":"June 16, 2016","format":false,"excerpt":"Simba Energy has announced that survey work on Block 2A commenced on Sunday June 12, 2016 as earlier announced and will be followed in the next ten days by the cutting of the seismic lines, in order that seismic data acquisition can occur. This follows days of opposition by the\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/08\/block-2a.png?fit=301%2C269&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":5757,"url":"https:\/\/www.oilnewskenya.com\/index.php\/kenyas-block-2a-seismic-results-expected-in-april\/","url_meta":{"origin":5093,"position":2},"title":"Kenya&#8217;s Block 2A seismic results expected in April","author":"","date":"March 14, 2017","format":false,"excerpt":"Following the completion of acquisition of 2D seismic in Block 2A earlier this month by Africa Geophysical Services Ltd Simba Energy says processing of lines is ongoing with the process expected to be finished in the next 30 days. The 2D seismic acquired a total of five hundred and twenty\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/08\/block-2a.png?fit=301%2C269&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":4844,"url":"https:\/\/www.oilnewskenya.com\/index.php\/simba-energy-to-drill-well-in-kenyas-block-2a-in-q4-2016\/","url_meta":{"origin":5093,"position":3},"title":"Simba Energy to drill well in Kenya&#8217;s Block 2A in Q4 2016","author":"","date":"July 18, 2016","format":false,"excerpt":"Canadian oil and gas explorer Simba Energy has said it expects to commence drilling operations in Kenya\u2019s Block 2A (Wajir County) situated in the Anza and Mandera basin in the next quarter after completing and interpreting ongoing 500+km 2-D seismic. According to the explorer the current 2D seismic is expected\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/07\/Block-2A.png?fit=505%2C611&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":5595,"url":"https:\/\/www.oilnewskenya.com\/index.php\/simba-essel-group-middle-east-complete-2d-seismic-data-acquisition-on-block-2-a\/","url_meta":{"origin":5093,"position":4},"title":"Simba, Essel Group Middle East complete 2D seismic data acquisition on block 2-A","author":"","date":"December 16, 2016","format":false,"excerpt":"Simba Energy and\u00a0Essel Group Middle East\u00a0have announced that the 2D seismic acquisition program on Block 2A in Wajir, Kenya has been successfully completed by Africa Geophysical Services Ltd (AGS). The survey has acquired a total of 520 kilometres of 2D seismic data on the block lying within the Mandera basin.\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/08\/block-2a.png?fit=301%2C269&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":4737,"url":"https:\/\/www.oilnewskenya.com\/index.php\/simba-energy-to-commence-2d-seismic-in-kenyas-block-2a-in-a-fortnight\/","url_meta":{"origin":5093,"position":5},"title":"Simba Energy to Commence 2D seismic in Kenya\u2019s Block 2A in a fortnight","author":"","date":"June 5, 2016","format":false,"excerpt":"Kenya\u2019s Block 2A operator Simba Energy has said it will commence the shooting of lines of 2D seismic in the next 7-12 days having already completed the necessary preparations. According to new Chief Executive Officer of Essel Group ME and Simba Energy Punkaj Gupta the seismic will usher the commencement\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/08\/block-2a.png?fit=301%2C269&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]}],"jetpack_sharing_enabled":true,"jetpack_likes_enabled":true,"_links":{"self":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/5093","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/comments?post=5093"}],"version-history":[{"count":3,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/5093\/revisions"}],"predecessor-version":[{"id":5609,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/5093\/revisions\/5609"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media\/1609"}],"wp:attachment":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media?parent=5093"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/categories?post=5093"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/tags?post=5093"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}