{"id":5087,"date":"2016-08-28T21:57:07","date_gmt":"2016-08-28T21:57:07","guid":{"rendered":"http:\/\/www.oilnewskenya.com\/?p=5087"},"modified":"2017-01-24T19:40:39","modified_gmt":"2017-01-24T19:40:39","slug":"ugandas-petrochemical-industrial-park-master-plan-to-be-complete-by-february-2017","status":"publish","type":"post","link":"https:\/\/www.oilnewskenya.com\/index.php\/ugandas-petrochemical-industrial-park-master-plan-to-be-complete-by-february-2017\/","title":{"rendered":"Uganda\u2019s Petrochemical Industrial Park Master Plan to be complete by February 2017"},"content":{"rendered":"<p>A master plan for the development of the petrochemical industrial park in Hoima, Uganda is expected to be completed by February 2017 according to the country\u2019s Prime Minister Dr. Ruhakana Rugunda.<\/p>\n<p>Speaking at the opening of the 6th joint sector review for the energy and mineral development sector Dr Ruhakana told participants that already the acquisition of 29.5km2 of land to accommodate a petrochemical-based industrial park has been completed.<\/p>\n<p>The park which will include a <a href=\"http:\/\/bit.ly\/1TXfqP8\">refinery<\/a>, a crude oil export hub, an international Airport, logistics systems, utilities, and other petrochemical industries will also have an integrated infrastructure corridor which will accommodate a pipeline, a highway, Power Transmission and ICT infrastructure cable systems is being planned, from the industrial park at Kabaale in Hoima to Kampala.<br \/>\nDr. Ruhakana added that the first phase for the refinery, of 30,000 barrels per day is expected to be in place by 2020\/2021. The refinery has South Korea \u2018s SK Engineering and Construction\u00a0as the lead developer after the preferred lead bidder RT Global resources\u00a0<a href=\"http:\/\/bit.ly\/2b2FH3P\">pulled out<\/a>.<\/p>\n<p>\u201cImplementation processes are on-going for the development of a 60,000 barrels per day petroleum refinery in a phased manner starting with 30,000 barrels per day, crude oil feeder pipelines from the oil fields to an oil hub near the refinery, a 1445km long, 24-inch diameter crude oil export <a href=\"http:\/\/bit.ly\/2bK627a\">pipeline<\/a>, and a 211 km long 12-inch diameter pipeline from the refinery to a storage terminal to be developed North-West of Kampala Capital city,\u201d he said.<\/p>\n<p>The prime minister has also called on the ministry of energy and minerals to expedite grant of Exploration Licences to new oil companies even as progress is being made to grant Production Licences to existing Oil Companies.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>A master plan for the development of the petrochemical industrial park in Hoima, Uganda is expected to be completed by February 2017 according to the country\u2019s Prime Minister Dr. Ruhakana &hellip; <a href=\"https:\/\/www.oilnewskenya.com\/index.php\/ugandas-petrochemical-industrial-park-master-plan-to-be-complete-by-february-2017\/\" class=\"more-link\">Read More<\/a><\/p>\n","protected":false},"author":24,"featured_media":549,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[11],"tags":[5035,5034,5040,5032,5030,5038,1238,5036,5031,1827,4961,2880,2042,5039,5033,2129,2412,2603,5037],"class_list":["post-5087","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-top-news","tag-an-international-airport","tag-crude-oil-export-hub","tag-dr-ruhakana-rugunda","tag-exploration-licences","tag-industrial-park","tag-kabaale","tag-kampala","tag-logistics-systems","tag-master-plan","tag-oil","tag-petrochemical","tag-petrochemical-industries","tag-pipeline","tag-prime-minister","tag-production-licenses","tag-refinery","tag-storage","tag-uganda","tag-utilities","entry"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/02\/refinery.jpg?fit=1120%2C1018&ssl=1","jetpack_shortlink":"https:\/\/wp.me\/p5JWkQ-1k3","jetpack-related-posts":[{"id":5491,"url":"https:\/\/www.oilnewskenya.com\/index.php\/sbc-presents-proposal-for-new-airport-near-uganda-oilfields\/","url_meta":{"origin":5087,"position":0},"title":"SBC presents proposal for new airport near Uganda Oilfields","author":"","date":"December 16, 2016","format":false,"excerpt":"SBC - a joint venture between UK company Colas and local company SBI Uganda - has formally presented its proposal for the Kabaale International Airport project to the Ministry of Works and Transport which is expected to offer immediate benefits in facilitating the movement of materials and manpower for the\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/12\/uganda-airport-masterplan.jpg?fit=500%2C273&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":5820,"url":"https:\/\/www.oilnewskenya.com\/index.php\/ugandas-oil-and-gas-industrial-park-master-plan-to-be-ready-by-june-2017\/","url_meta":{"origin":5087,"position":1},"title":"Uganda\u2019s Oil and Gas Industrial Park Master Plan to Be Ready By June 2017","author":"","date":"March 28, 2017","format":false,"excerpt":"The master plan for an Oil and Gas industrial park in Uganda being developed by SMEC International will now be ready by June 2017 according to Dickens Kamugisha from the Africa Institute for Energy Governance (AFIEGO). The master plan earlier expected to be completed by February 2017 has seen the\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/08\/uganda-with-flag.jpg?fit=400%2C400&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":5729,"url":"https:\/\/www.oilnewskenya.com\/index.php\/cargolux-eyes-uganda-and-mozambique-markets\/","url_meta":{"origin":5087,"position":2},"title":"Cargolux eyes Uganda and Mozambique Markets","author":"","date":"March 6, 2017","format":false,"excerpt":"Luxembourg based Cargo Haulier Cargolux Airlines has indicated it might be looking into tapping from the increased activity in the oil and gas sector in East Africa with focus on two countries Uganda and Mozambique. The two markets currently in the development phase expect extra cargo with Uganda already upgrading\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2017\/03\/cargolux.png?fit=1200%2C768&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2017\/03\/cargolux.png?fit=1200%2C768&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2017\/03\/cargolux.png?fit=1200%2C768&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2017\/03\/cargolux.png?fit=1200%2C768&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2017\/03\/cargolux.png?fit=1200%2C768&ssl=1&resize=1050%2C600 3x"},"classes":[]},{"id":7769,"url":"https:\/\/www.oilnewskenya.com\/index.php\/total-sa-suspends-investment-plans-in-the-east-africa-crude-oil-pipeline\/","url_meta":{"origin":5087,"position":3},"title":"Total SA Suspends Investment Plans in the East Africa Crude Oil Pipeline","author":"","date":"September 6, 2019","format":false,"excerpt":"Total SA has suspended plans to build the 1445 kilometer East Africa Crude Oil pipeline from Hoima (Uganda) to Tanga in Tanzania citing frustrations by the Uganda government in completion of the Tullow Oil deal sources say. The shelving of the $3.5 billion crude export project by the French Giant\u2026","rel":"","context":"In \"East Africa crude oil pipeline\"","block_context":{"text":"East Africa crude oil pipeline","link":"https:\/\/www.oilnewskenya.com\/index.php\/tag\/east-africa-crude-oil-pipeline\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2017\/11\/EACOP-route.jpg?fit=632%2C563&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2017\/11\/EACOP-route.jpg?fit=632%2C563&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2017\/11\/EACOP-route.jpg?fit=632%2C563&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":6714,"url":"https:\/\/www.oilnewskenya.com\/index.php\/ugandas-hotel-tourism-sector-set-expand-oil-development-kicks\/","url_meta":{"origin":5087,"position":4},"title":"Uganda\u2019s Hotel &#038; Tourism Sector Set to expand as Oil Development Phase kicks in","author":"","date":"January 22, 2018","format":false,"excerpt":"The hotel and tourism sector in western Uganda in particular is expected to see increased demand as work is set to commence on the development phase in the country\u2019s upstream sector. According to Petroleum Authority of Uganda in a presentation by director for technical support services Peninah Aheebwa PAU projects\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/02\/uganda-oil-001.jpg?fit=460%2C276&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":6802,"url":"https:\/\/www.oilnewskenya.com\/index.php\/express-shipping-logistics-eyes-ugandas-upstream-sector-new-kampala-office\/","url_meta":{"origin":5087,"position":5},"title":"Express Shipping and Logistics Eyes Uganda\u2019s Upstream Sector with New Kampala Office","author":"","date":"February 5, 2018","format":false,"excerpt":"Express Shipping and Logistics Eyes Uganda\u2019s Upstream Sector with New Kampala Office Kenya\u2019s Express Shipping and Logistics has expanded to Uganda with the opening of the Kampala branch office as the company eyes business from the multi-billion dollar upstream sector in the East African country. According to Express Shipping and\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2018\/02\/ESL-Uganda.jpg?fit=760%2C570&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2018\/02\/ESL-Uganda.jpg?fit=760%2C570&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2018\/02\/ESL-Uganda.jpg?fit=760%2C570&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2018\/02\/ESL-Uganda.jpg?fit=760%2C570&ssl=1&resize=700%2C400 2x"},"classes":[]}],"jetpack_sharing_enabled":true,"jetpack_likes_enabled":true,"_links":{"self":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/5087","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/comments?post=5087"}],"version-history":[{"count":1,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/5087\/revisions"}],"predecessor-version":[{"id":5088,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/5087\/revisions\/5088"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media\/549"}],"wp:attachment":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media?parent=5087"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/categories?post=5087"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/tags?post=5087"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}