{"id":5026,"date":"2016-08-08T13:40:29","date_gmt":"2016-08-08T13:40:29","guid":{"rendered":"http:\/\/www.oilnewskenya.com\/?p=5026"},"modified":"2017-01-24T20:23:20","modified_gmt":"2017-01-24T20:23:20","slug":"flexible-software-licensing-model-offers-new-opportunities-for-smaller-engineering-companies","status":"publish","type":"post","link":"https:\/\/www.oilnewskenya.com\/index.php\/flexible-software-licensing-model-offers-new-opportunities-for-smaller-engineering-companies\/","title":{"rendered":"Flexible software licensing model offers new opportunities for smaller engineering companies"},"content":{"rendered":"<p>As the industry comes to terms with the \u201clower for longer\u201d oil price situation, a number of smaller Engineering, Procurement and Construction (EPC) contractors are emerging with specialism-focused offerings, or regionally-focused offerings for Oil &amp; Gas facility owners and operators. By identifying innovative new practices to manage costs during periods of low activity with the ability to rapidly scale up operations during peak periods, smaller engineering firms are now able to either compete with or work alongside much larger contractors.<\/p>\n<p>To do this, smaller engineering companies must have access to enterprise technology and that has previously proven cost prohibitive. Conventional software licensing arrangements with a variety of initial and annual agreements, rentals, renewal dates and restrictions on product use that do not fit the changing business needs of smaller EPC contractors who need the ability to continually tailor licensing costs to business peaks and troughs.<\/p>\n<p>Project Design Group Ltd (PDG),\u00a0a multi-discipline engineering and project management consultancy, has addressed this issue by taking advantage of a flexible software licensing model being offered by AVEVA that provides usage-based access to AVEVA\u2019s full Integrated Engineering and Design suite, including engineering data management, 2D drawing and 3D modelling tools.\u00a0This allows PDG to tightly control its licensing costs and still get maximum value from AVEVA\u2019s software.<\/p>\n<p>\u201cHistorically, enterprise technology has always aided the larger, more established organizations.\u201d\u00a0Andrew Rhodes, Managing Director at Project Design Group Ltd explained. \u201cWithout a flexible licensing model, it would be difficult for PDG to access specialist engineering and design software due to the initial investment required.\u201d<\/p>\n<p>A flexible licensing model also enables a company to \u201ccherry pick\u201d the applications that are required for a specific project. Tools that are not being used can effectively be \u2018shelved\u2019 until required. This means the license is always optimized for what is actually being used.<\/p>\n<p>AVEVA now provides flexible licensing for its full suite of Integrated Engineering &amp; Design tools, including market-leading technologies such as AVEVA Everything3D (AVEVA E3D). Instead of fixed licenses, clients buy \u2018tokens\u2019 for their planned software licensing and \u2018spend\u2019 them exactly as their needs dictate.<\/p>\n<p>By introducing innovations such as\u00a0flexible software licensing the industry is responding to the need to optimize operations during the downturn in the oil &amp; gas market. This is creating opportunities for smaller specialist firms to emerge and gain ground with EPC companies such as PDG competing for major engineering projects against much larger businesses. The lines between traditional tier 1 and tier 2 contractors are blurring and the result of increased competition is likely to drive down the cost of complex oil &amp; gas projects.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>As the industry comes to terms with the \u201clower for longer\u201d oil price situation, a number of smaller Engineering, Procurement and Construction (EPC) contractors are emerging with specialism-focused offerings, or &hellip; <a href=\"https:\/\/www.oilnewskenya.com\/index.php\/flexible-software-licensing-model-offers-new-opportunities-for-smaller-engineering-companies\/\" class=\"more-link\">Read More<\/a><\/p>\n","protected":false},"author":24,"featured_media":5028,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[11],"tags":[4955,4959,4958,3093,3721,764,4954,4962,4963,4965,955,1130,4956,1827,4961,3286,4964,4960],"class_list":["post-5026","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-top-news","tag-aveva","tag-aveva-e3d","tag-aveva-everything3d","tag-contractors","tag-design","tag-engineering","tag-epc","tag-epc-contractor","tag-epc-epcm","tag-flexible-license","tag-gas","tag-infrastructure","tag-integrated-engineering","tag-oil","tag-petrochemical","tag-procurement","tag-project-design-group","tag-software","entry"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/08\/epc-contractors.jpg?fit=528%2C348&ssl=1","jetpack_shortlink":"https:\/\/wp.me\/p5JWkQ-1j4","jetpack-related-posts":[{"id":8296,"url":"https:\/\/www.oilnewskenya.com\/index.php\/algeria-sonatrach-pttep-pvep-maire-tecnimont-sign-contract-for-the-creation-of-a-2nd-oil-treatment-train-at-bir-sebaa\/","url_meta":{"origin":5026,"position":0},"title":"ALGERIA: SONATRACH, PTTEP, PVEP &#038; MAIRE Tecnimont Sign Contract For The Creation of a 2nd Oil Treatment Train at Bir Sebaa","author":"","date":"June 9, 2020","format":false,"excerpt":"The Bir Sebaa Group, made up of SONATRACH and its two partners PTTEP and PVEP, on the one hand, and the Italian company specialized in Engineering Mayor Tecnimont, on the other hand, signed, on June 08, 2020, an Engineering contract, Procurement & Construction (EPC) for the construction of a second\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/06\/Bir-Sebaa-field.png?fit=346%2C280&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":12604,"url":"https:\/\/www.oilnewskenya.com\/index.php\/senegal-mauritania-cimc-raffles-deliveres-the-first-feedepc-project-to-bp\/","url_meta":{"origin":5026,"position":1},"title":"SENEGAL\/ MAURITANIA: CIMC Raffles Deliveres the First FEED+EPC Project to BP","author":"","date":"July 6, 2022","format":false,"excerpt":"The GTA Hub QU jack-up accommodation platform designed and built by CIMC Raffles for BP, an international energy giant, was delivered at its construction site in Yantai with 4 million man-hours without injury. The BP's GTA project is with the best aggregative indicator among its peers on the Mauritania and\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/08\/Great-Turtle-Ahmeyim-Project-central-hub.jpg?fit=912%2C565&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/08\/Great-Turtle-Ahmeyim-Project-central-hub.jpg?fit=912%2C565&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/08\/Great-Turtle-Ahmeyim-Project-central-hub.jpg?fit=912%2C565&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/08\/Great-Turtle-Ahmeyim-Project-central-hub.jpg?fit=912%2C565&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":8538,"url":"https:\/\/www.oilnewskenya.com\/index.php\/egypt-technipfmc-signs-a-major-contract-for-a-new-hydrocracking-complex\/","url_meta":{"origin":5026,"position":2},"title":"EGYPT: TechnipFMC Signs a Major Contract For a New Hydrocracking Complex","author":"","date":"July 8, 2020","format":false,"excerpt":"TechnipFMC has signed a major Engineering, Procurement, and Construction (EPC) contract with Assiut National Oil Processing Company (ANOPC) for the construction of a new Hydrocracking Complex for the Assiut refinery in Egypt. This EPC contract covers new process units such as a Vacuum Distillation Unit, a Diesel Hydrocracking Unit, a\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/07\/TechnipFMC_0.png?fit=1200%2C848&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/07\/TechnipFMC_0.png?fit=1200%2C848&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/07\/TechnipFMC_0.png?fit=1200%2C848&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/07\/TechnipFMC_0.png?fit=1200%2C848&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/07\/TechnipFMC_0.png?fit=1200%2C848&ssl=1&resize=1050%2C600 3x"},"classes":[]},{"id":10654,"url":"https:\/\/www.oilnewskenya.com\/index.php\/uganda-local-and-foreign-contractors-eye-tilenga-project-deals\/","url_meta":{"origin":5026,"position":3},"title":"UGANDA: Local and Foreign Contractors Eye Tilenga Project Deals","author":"","date":"July 29, 2021","format":false,"excerpt":"Dozens of companies from Uganda and internationally attended the Total E&P Uganda Supplier Development dialogue virtual workshop held today under the theme \"Enhancing Awareness and Participation in Upcoming Opportunities in the Tilenga project\". The workshop targeting suppliers interested in the Tilenga project and East Africa crude oil pipeline informed participants\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/07\/UGANDA-TILENGA-PROJECT-DEVELOPMENT-STAGE-EAST-AFRICA-CRUDE-OIL-PIPELINE-EACOP-OUTLOOK-2021-%E2%80%93-2025.jpg?fit=408%2C519&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":10831,"url":"https:\/\/www.oilnewskenya.com\/index.php\/libya-petrofac-secures-epcc-contract-for-the-erawin-field-development-project\/","url_meta":{"origin":5026,"position":4},"title":"LIBYA: Petrofac Secures EPCC Contract  for the Erawin Field Development Project","author":"","date":"September 3, 2021","format":false,"excerpt":"Petrofac has secured a contract valued at over US$100 million with Zallaf Libya Oil & Gas Exploration and Production Company, to deliver their Erawin Field Development Project Phase 1 Early Production Facilities. The Engineering, Procurement, Construction and Commissioning (EPCC) scope of work encompasses surface equipment, including well pads and flowlines\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/09\/Zallaf-Oil-Gas.jpg?fit=575%2C353&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/09\/Zallaf-Oil-Gas.jpg?fit=575%2C353&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/09\/Zallaf-Oil-Gas.jpg?fit=575%2C353&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":12567,"url":"https:\/\/www.oilnewskenya.com\/index.php\/angola-saipem-awarded-3-new-epc-contracts-worth-around-900m\/","url_meta":{"origin":5026,"position":5},"title":"ANGOLA: Saipem Awarded 3 New EPC Contracts  Worth around $900M","author":"","date":"August 13, 2022","format":false,"excerpt":"Saipem has been awarded three new contracts (one onshore and two offshore) by the New Gas Consortium composed by two wholly owned subsidiaries of Azule Energy (Eni Angola Exploration B.V. and BP Exploration (Angola) Limited), Sonangol P&P, Chevron, TotalEnergies, for the Engineering, Procurement and Construction (EPC) activities relevant to the\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/08\/Azule-Energy.png?fit=750%2C421&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/08\/Azule-Energy.png?fit=750%2C421&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/08\/Azule-Energy.png?fit=750%2C421&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/08\/Azule-Energy.png?fit=750%2C421&ssl=1&resize=700%2C400 2x"},"classes":[]}],"jetpack_sharing_enabled":true,"jetpack_likes_enabled":true,"_links":{"self":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/5026","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/comments?post=5026"}],"version-history":[{"count":1,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/5026\/revisions"}],"predecessor-version":[{"id":5027,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/5026\/revisions\/5027"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media\/5028"}],"wp:attachment":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media?parent=5026"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/categories?post=5026"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/tags?post=5026"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}