{"id":4951,"date":"2014-09-29T13:41:43","date_gmt":"2014-09-29T13:41:43","guid":{"rendered":"http:\/\/www.oilnewskenya.com\/?p=4951"},"modified":"2016-08-03T13:45:35","modified_gmt":"2016-08-03T13:45:35","slug":"toshiba-concludes-mou-with-ethiopian-electric-power-on-geothermal-power-generation","status":"publish","type":"post","link":"https:\/\/www.oilnewskenya.com\/index.php\/toshiba-concludes-mou-with-ethiopian-electric-power-on-geothermal-power-generation\/","title":{"rendered":"Toshiba concludes MoU with Ethiopian Electric Power on geothermal power generation"},"content":{"rendered":"<p>Toshiba Corporation has announced that the company has concluded a memorandum of understanding (MOU) with Ethiopian Electric Power on a comprehensive partnership in geothermal power that will see the parties collaborate in power generation projects and personnel development.<\/p>\n<p>Ethiopian Electric Power (EEP), a publicly owned utility, engages in the development of geothermal resources and the construction of power plants. Through the partnership with EEP, Toshiba will draw on its long-standing experience and expertise in geothermal systems to contribute to projects in Ethiopia. More specifically, the company will develop and manufacture major equipment, create operation and management guidelines, cooperate in personnel development, and start a waste heat utilization business.<\/p>\n<p>Ethiopia is geothermal rich, with resources estimated at equivalent to 6,000 megawatts. However, this potential has yet to be explored and developed, and over 90 percent of the country\u2019s electricity is from hydropower sources. Looking to the future, Ethiopia plans to increase its current installed generating capacity of 2,268 megawatts to 37,000 megawatts by 2037, and the development of geothermal power will play a significant role in reaching that target.<\/p>\n<p>Toshiba commands the world\u2019s largest market share for geothermal equipment with 24% of total installed capacity*. The company delivered Japan\u2019s first geothermal turbine and generator, with a capacity of 20 megawatts, to the Matsukawa Geothermal Power Plant in Iwate in 1966. Since then, Toshiba has delivered 52 geothermal turbines and generators with a total installed capacity of approx. 2,800 megawatts to North America, Southeast Asia, Iceland and elsewhere around the world.<\/p>\n<p>Toshiba will continue to promote various forms of renewable energy generation in the global market, including geothermal, wind, hydro and photovoltaic energy, to contribute to a reliable supply of renewable energy worldwide.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Toshiba Corporation has announced that the company has concluded a memorandum of understanding (MOU) with Ethiopian Electric Power on a comprehensive partnership in geothermal power that will see the parties &hellip; <a href=\"https:\/\/www.oilnewskenya.com\/index.php\/toshiba-concludes-mou-with-ethiopian-electric-power-on-geothermal-power-generation\/\" class=\"more-link\">Read More<\/a><\/p>\n","protected":false},"author":24,"featured_media":4952,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"Toshiba concludes MoU with Ethiopian Electric Power on geothermal power generation","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[4747],"tags":[809,4793,990,4787],"class_list":["post-4951","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-geothermal","tag-ethiopia","tag-ethiopian-electric-power","tag-geothermal","tag-toshiba-corporation","entry"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/08\/Toshiba-EEP_MOU.png?fit=519%2C332&ssl=1","jetpack_shortlink":"https:\/\/wp.me\/p5JWkQ-1hR","jetpack-related-posts":[{"id":8034,"url":"https:\/\/www.oilnewskenya.com\/index.php\/toshiba-wins-order-in-ethiopia-for-small-scale-geothermal-power-generation-system-for-wellhead\/","url_meta":{"origin":4951,"position":0},"title":"Toshiba Wins Order in Ethiopia for Small Scale Geothermal Power Generation System for Wellhead","author":"","date":"March 3, 2020","format":false,"excerpt":"Toshiba Energy Systems & Solutions Corporation (Toshiba ESS)\u00a0 has announced that the company, Toyota Tsusho Corporation and Turkish engineering company Egesim Energy Electro-Mechanic Construction Contracting Co., Ltd. have received an order of engineering, procurement and construction for Aluto Langano Geothermal Wellhead Power System in central Ethiopia, which is developed by\u2026","rel":"","context":"In &quot;Geothermal&quot;","block_context":{"text":"Geothermal","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/renewables-2\/geothermal\/"},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":4948,"url":"https:\/\/www.oilnewskenya.com\/index.php\/toshiba-concludes-mou-with-tgdc-for-geothermal-power-generation-business-in-tanzania\/","url_meta":{"origin":4951,"position":1},"title":"Toshiba Concludes MoU with TGDC for Geothermal Power Generation Business in Tanzania","author":"","date":"December 8, 2015","format":false,"excerpt":"Toshiba Corporation has announced that the company has concluded a memorandum of understanding (MOU) with Tanzania Geothermal Development Company Limited (TGDC) for comprehensive collaboration in the geothermal power generation business. This is TGDC\u2019s first MOU with a Japanese company. TGDC and Toshiba will collaborate to promote a geothermal power generation\u2026","rel":"","context":"In &quot;Geothermal&quot;","block_context":{"text":"Geothermal","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/renewables-2\/geothermal\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/08\/Toshiba-TGDC.png?fit=541%2C397&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/08\/Toshiba-TGDC.png?fit=541%2C397&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/08\/Toshiba-TGDC.png?fit=541%2C397&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":12610,"url":"https:\/\/www.oilnewskenya.com\/index.php\/toshiba-ess-kengen-conclude-mou-on-om-services-for-geothermal-power-plants\/","url_meta":{"origin":4951,"position":2},"title":"Toshiba ESS, KenGen Conclude MoU on O&#038;M Services for Geothermal Power Plants","author":"","date":"September 1, 2022","format":false,"excerpt":"Kenya Electricity Generating Company\u00a0 (KenGen) and Toshiba Energy Systems & Solutions Corporation (Toshiba ESS) concluded a memorandum of understanding (MOU). The MOU anticipates a partnership of Operation and Maintenance (O&M) services for geothermal power plants in developing countries including \u00a0East African countries through a combination of KenGen and Toshiba ESS\u2019s\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/07\/KenGen-Olkaria-VI.jpg?fit=1200%2C801&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/07\/KenGen-Olkaria-VI.jpg?fit=1200%2C801&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/07\/KenGen-Olkaria-VI.jpg?fit=1200%2C801&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/07\/KenGen-Olkaria-VI.jpg?fit=1200%2C801&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/07\/KenGen-Olkaria-VI.jpg?fit=1200%2C801&ssl=1&resize=1050%2C600 3x"},"classes":[]},{"id":11131,"url":"https:\/\/www.oilnewskenya.com\/index.php\/ethiopia-kengen-completes-eeps-deepest-geothermal-well\/","url_meta":{"origin":4951,"position":3},"title":"Ethiopia KenGen Completes EEP&#8217;s Deepest Geothermal Well","author":"","date":"November 12, 2021","format":false,"excerpt":"Kenya Electricity Generating Company (KenGen) has announced the completion of a 3,000-meter geothermal well in Ethiopia, which exceeded the target of 2,750 meters. This is the second of eight wells it has been commissioned to drill by Ethiopian Electric Power Company (EEP) the state-owned electricity producer as Ethiopia seeks to\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/11\/KenGen-drilling-Aluto-Langano.jpeg?fit=800%2C599&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/11\/KenGen-drilling-Aluto-Langano.jpeg?fit=800%2C599&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/11\/KenGen-drilling-Aluto-Langano.jpeg?fit=800%2C599&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/11\/KenGen-drilling-Aluto-Langano.jpeg?fit=800%2C599&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":12230,"url":"https:\/\/www.oilnewskenya.com\/index.php\/ethiopia-kengen-completes-drilling-the-seventh-geothermal-well-at-the-aluto-langano-geothermal-field\/","url_meta":{"origin":4951,"position":4},"title":"ETHIOPIA: KenGen Completes Drilling the Seventh Geothermal Well at the Aluto-Langano Geothermal field","author":"","date":"April 30, 2022","format":false,"excerpt":"Kenya Electricity Generating Company PLC (KenGen) has completed drilling of the seventh geothermal well in Ethiopia further bolstering the company\u2019s renewable energy footprint in the Horn of Africa. This latest announcement is from the Aluto-Langano geothermal site where KenGen is implementing a drilling consultancy project for the state-owned Ethiopian Electric\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/09\/Geothermal-OW-923.png?fit=631%2C344&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/09\/Geothermal-OW-923.png?fit=631%2C344&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/09\/Geothermal-OW-923.png?fit=631%2C344&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":11239,"url":"https:\/\/www.oilnewskenya.com\/index.php\/djibouti-kengen-commences-multi-well-drilling-campaign\/","url_meta":{"origin":4951,"position":5},"title":"DJIBOUTI: KenGen Commences Multi-well Drilling Campaign","author":"","date":"November 25, 2021","format":false,"excerpt":"Kenya Electricity Generating Company (KenGen) PLC has commenced drilling of the first of three geothermal wells in Djibouti setting in motion a Ksh.0.7 billion contract signed in February this year. The drilling of the first well is expected to take about two months to complete as KenGen seeks to export\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/11\/KenGen-Djibouti.jpg?fit=720%2C540&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/11\/KenGen-Djibouti.jpg?fit=720%2C540&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/11\/KenGen-Djibouti.jpg?fit=720%2C540&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/11\/KenGen-Djibouti.jpg?fit=720%2C540&ssl=1&resize=700%2C400 2x"},"classes":[]}],"jetpack_sharing_enabled":true,"jetpack_likes_enabled":true,"_links":{"self":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/4951","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/comments?post=4951"}],"version-history":[{"count":1,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/4951\/revisions"}],"predecessor-version":[{"id":4953,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/4951\/revisions\/4953"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media\/4952"}],"wp:attachment":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media?parent=4951"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/categories?post=4951"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/tags?post=4951"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}