{"id":4948,"date":"2015-12-08T13:35:15","date_gmt":"2015-12-08T13:35:15","guid":{"rendered":"http:\/\/www.oilnewskenya.com\/?p=4948"},"modified":"2017-01-26T11:06:25","modified_gmt":"2017-01-26T11:06:25","slug":"toshiba-concludes-mou-with-tgdc-for-geothermal-power-generation-business-in-tanzania","status":"publish","type":"post","link":"https:\/\/www.oilnewskenya.com\/index.php\/toshiba-concludes-mou-with-tgdc-for-geothermal-power-generation-business-in-tanzania\/","title":{"rendered":"Toshiba Concludes MoU with TGDC for Geothermal Power Generation Business in Tanzania"},"content":{"rendered":"<p>Toshiba Corporation has announced that the company has concluded a memorandum of understanding (MOU) with Tanzania Geothermal Development Company Limited (TGDC) for comprehensive collaboration in the geothermal power generation business.<\/p>\n<p>This is TGDC\u2019s first MOU with a Japanese company. TGDC and Toshiba will collaborate to promote a geothermal power generation business and human resource development in Tanzania.<\/p>\n<p>TGDC, a subsidiary of Tanzania Electric Supply Company, is the sole organization with geothermal exploitation rights in Tanzania, and its business scope ranges from the development of geothermal resources to the construction of power plants.<\/p>\n<p>Drawing on the expertise built up through decades of experience, Toshiba will contribute to geothermal power generation in Tanzania, including the development and provision of major equipment, creation of guidelines for plant operation and management, and personnel training.<\/p>\n<p>Tanzania has the third largest geothermal resources in Africa, following Kenya and Ethiopia-over 5,000 megawatts (MW). At present, however, approximately 97%*\u00a0of Tanzania\u2019s electricity supply relies on hydro and fossils fuels, and geothermal resources are far from fully tapped. Tanzania has a plan to rapidly<br \/>\nincrease its total power generation capacity from the current 1,577 MW to 10,000 MW by 2025, raising expectations for geothermal generation.<\/p>\n<p>Since Toshiba delivered Japan\u2019s first geothermal steam turbine-generator with a power output of 20 MW to the Matsukawa Geothermal Power Station in Iwate Prefecture in 1966, it has provided 52 geothermal turbine-generators around the world, including North America, Southeast Asia and Kenya.<\/p>\n<p>Their total power generation capacity is approximately 3,400 MW, commanding the world\u2019s biggest share in geothermal electricity generation at 26%. In Africa, concerned, Toshiba delivered four geothermal turbines to Kenya in 2014.<\/p>\n<p>Toshiba will continue to promote marketing activities throughout the world to contribute to stable electricity supply from various renewable energy sources, including geothermal, hydraulic and solar photovoltaic generation.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Toshiba Corporation has announced that the company has concluded a memorandum of understanding (MOU) with Tanzania Geothermal Development Company Limited (TGDC) for comprehensive collaboration in the geothermal power generation business. &hellip; <a href=\"https:\/\/www.oilnewskenya.com\/index.php\/toshiba-concludes-mou-with-tgdc-for-geothermal-power-generation-business-in-tanzania\/\" class=\"more-link\">Read More<\/a><\/p>\n","protected":false},"author":24,"featured_media":4949,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"Toshiba Concludes MoU with TGDC for Geothermal Power Generation Business in Tanzania","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[4747],"tags":[809,990,4790,4792,4791,1252,2466,4788,4789,4787],"class_list":["post-4948","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-geothermal","tag-ethiopia","tag-geothermal","tag-geothermal-power-generation-business","tag-geothermal-turbines","tag-human-resource-development","tag-kenya","tag-tanzania","tag-tanzania-geothermal-development-company-limited","tag-tgdc","tag-toshiba-corporation","entry"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/08\/Toshiba-TGDC.png?fit=541%2C397&ssl=1","jetpack_shortlink":"https:\/\/wp.me\/p5JWkQ-1hO","jetpack-related-posts":[{"id":12610,"url":"https:\/\/www.oilnewskenya.com\/index.php\/toshiba-ess-kengen-conclude-mou-on-om-services-for-geothermal-power-plants\/","url_meta":{"origin":4948,"position":0},"title":"Toshiba ESS, KenGen Conclude MoU on O&#038;M Services for Geothermal Power Plants","author":"","date":"September 1, 2022","format":false,"excerpt":"Kenya Electricity Generating Company\u00a0 (KenGen) and Toshiba Energy Systems & Solutions Corporation (Toshiba ESS) concluded a memorandum of understanding (MOU). The MOU anticipates a partnership of Operation and Maintenance (O&M) services for geothermal power plants in developing countries including \u00a0East African countries through a combination of KenGen and Toshiba ESS\u2019s\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/07\/KenGen-Olkaria-VI.jpg?fit=1200%2C801&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/07\/KenGen-Olkaria-VI.jpg?fit=1200%2C801&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/07\/KenGen-Olkaria-VI.jpg?fit=1200%2C801&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/07\/KenGen-Olkaria-VI.jpg?fit=1200%2C801&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/07\/KenGen-Olkaria-VI.jpg?fit=1200%2C801&ssl=1&resize=1050%2C600 3x"},"classes":[]},{"id":4951,"url":"https:\/\/www.oilnewskenya.com\/index.php\/toshiba-concludes-mou-with-ethiopian-electric-power-on-geothermal-power-generation\/","url_meta":{"origin":4948,"position":1},"title":"Toshiba concludes MoU with Ethiopian Electric Power on geothermal power generation","author":"","date":"September 29, 2014","format":false,"excerpt":"Toshiba Corporation has announced that the company has concluded a memorandum of understanding (MOU) with Ethiopian Electric Power on a comprehensive partnership in geothermal power that will see the parties collaborate in power generation projects and personnel development. Ethiopian Electric Power (EEP), a publicly owned utility, engages in the development\u2026","rel":"","context":"In &quot;Geothermal&quot;","block_context":{"text":"Geothermal","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/renewables-2\/geothermal\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/08\/Toshiba-EEP_MOU.png?fit=519%2C332&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":8034,"url":"https:\/\/www.oilnewskenya.com\/index.php\/toshiba-wins-order-in-ethiopia-for-small-scale-geothermal-power-generation-system-for-wellhead\/","url_meta":{"origin":4948,"position":2},"title":"Toshiba Wins Order in Ethiopia for Small Scale Geothermal Power Generation System for Wellhead","author":"","date":"March 3, 2020","format":false,"excerpt":"Toshiba Energy Systems & Solutions Corporation (Toshiba ESS)\u00a0 has announced that the company, Toyota Tsusho Corporation and Turkish engineering company Egesim Energy Electro-Mechanic Construction Contracting Co., Ltd. have received an order of engineering, procurement and construction for Aluto Langano Geothermal Wellhead Power System in central Ethiopia, which is developed by\u2026","rel":"","context":"In &quot;Geothermal&quot;","block_context":{"text":"Geothermal","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/renewables-2\/geothermal\/"},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":9042,"url":"https:\/\/www.oilnewskenya.com\/index.php\/east-african-countries-submit-17-expressions-of-interest-for-the-6th-grmf-application-round\/","url_meta":{"origin":4948,"position":3},"title":"East African Countries Submit 17 Expressions of Interest for the 6th GRMF Application Round","author":"","date":"September 2, 2020","format":false,"excerpt":"The AUC has acknowledged that on 29 July 2020 seventeen (17) Expressions of Interest (EoI)\u00a0for the Geothermal Risk Mitigation Facility\u2019s 6th Application Round were received on time and were accepted for bid opening, which took place on 3rd August 2020. According to the AUC the seventeen EoI consisted of ten\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/09\/Geothermal-OW-923.png?fit=631%2C344&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/09\/Geothermal-OW-923.png?fit=631%2C344&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/09\/Geothermal-OW-923.png?fit=631%2C344&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":5082,"url":"https:\/\/www.oilnewskenya.com\/index.php\/gdc-national-oil-to-offer-joint-oil-and-gas-drilling-services\/","url_meta":{"origin":4948,"position":4},"title":"GDC, National Oil to offer joint oil and gas drilling services","author":"","date":"August 25, 2016","format":false,"excerpt":"The Geothermal Development Company (GDC) and National Oil Corporation of Kenya have entered into an agreement to offer joint oil and gas drilling services in Kenya and the region the first of its kind partnership that will see the two state agencies jointly bid and undertake drilling activities by leveraging\u2026","rel":"","context":"In &quot;Geothermal&quot;","block_context":{"text":"Geothermal","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/renewables-2\/geothermal\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/08\/GDC-NOCK-MOU.jpg?fit=402%2C300&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":12196,"url":"https:\/\/www.oilnewskenya.com\/index.php\/kenya-kengen-completes-construction-of-olkaria-i-unit-6-geothermal-power-plant\/","url_meta":{"origin":4948,"position":5},"title":"KENYA: KenGen Completes Construction of Olkaria I Unit 6 Geothermal Power Plant","author":"","date":"April 1, 2022","format":false,"excerpt":"Kenya Electricity Generating Company (KenGen) has completed the construction of the 83MW Olkaria I, Additional Unit (AU) 6 Geothermal Power Plant, setting in motion activities to add it to the national power grid. This milestone follows a successful delivery of full steam to the power plant, setting in motion technical\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/04\/Olkaria.jpg?fit=1200%2C494&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/04\/Olkaria.jpg?fit=1200%2C494&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/04\/Olkaria.jpg?fit=1200%2C494&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/04\/Olkaria.jpg?fit=1200%2C494&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/04\/Olkaria.jpg?fit=1200%2C494&ssl=1&resize=1050%2C600 3x"},"classes":[]}],"jetpack_sharing_enabled":true,"jetpack_likes_enabled":true,"_links":{"self":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/4948","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/comments?post=4948"}],"version-history":[{"count":1,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/4948\/revisions"}],"predecessor-version":[{"id":4950,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/4948\/revisions\/4950"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media\/4949"}],"wp:attachment":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media?parent=4948"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/categories?post=4948"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/tags?post=4948"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}