{"id":4928,"date":"2014-12-04T12:26:58","date_gmt":"2014-12-04T12:26:58","guid":{"rendered":"http:\/\/www.oilnewskenya.com\/?p=4928"},"modified":"2016-08-03T12:33:28","modified_gmt":"2016-08-03T12:33:28","slug":"ormat-to-expand-olkaria-iii-geothermal-complex-in-kenya-by-24-mw","status":"publish","type":"post","link":"https:\/\/www.oilnewskenya.com\/index.php\/ormat-to-expand-olkaria-iii-geothermal-complex-in-kenya-by-24-mw\/","title":{"rendered":"Ormat to Expand Olkaria III Geothermal Complex in Kenya by 24 MW"},"content":{"rendered":"<p>Ormat Technologies has announced today its subsidiary has signed an amended and restated Power Purchase Agreement (\u201cPPA\u201d) with Kenya Power and Lighting Company Limited (KPLC), paving the way for the expansion of the Olkaria complex.<\/p>\n<p>Under the terms of the PPA, Ormat expects to increase the generating capacity of the complex by 24 MW, bringing the complex\u2019s total capacity to 134 MW. The fourth plant is expected to come on line in the second half of 2016 and to sell electricity under a 20 years PPA with KPLC.<\/p>\n<p>\u201cOrmat\u2019s Olkaria geothermal complex provides clean, reliable and firm power to over 200,000 Kenyan households, increasing the complex by an additional 24 MW will further benefit the Kenyan people. We see Kenya, with its progressive renewable energy policy, as an important market for us and where we will continue to explore additional projects\u201d, said Ormat CEO Isaac Angel. \u201cThe synergies that derive from adding units to the existing complex allow smaller plants to be a cost effective and provide the additional power that the country needs in record speeds\u201d.<\/p>\n<p>Fourth plant at complex to come on line in second half of 2016 and will bring its capacity to 134 MW<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Ormat Technologies has announced today its subsidiary has signed an amended and restated Power Purchase Agreement (\u201cPPA\u201d) with Kenya Power and Lighting Company Limited (KPLC), paving the way for the &hellip; <a href=\"https:\/\/www.oilnewskenya.com\/index.php\/ormat-to-expand-olkaria-iii-geothermal-complex-in-kenya-by-24-mw\/\" class=\"more-link\">Read More<\/a><\/p>\n","protected":false},"author":24,"featured_media":4930,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"Ormat to Expand Olkaria III Geothermal Complex in Kenya by 24 MW","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[4747],"tags":[990,1252,4751,4757,4753,4758],"class_list":["post-4928","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-geothermal","tag-geothermal","tag-kenya","tag-olkaria-iii","tag-ormat","tag-power-purchase-agreement","tag-power-purchase-agreement-ppa-with-kenya-power-and-lighting-company-limited","entry"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/08\/Olkaria-3.jpg.png?fit=592%2C393&ssl=1","jetpack_shortlink":"https:\/\/wp.me\/p5JWkQ-1hu","jetpack-related-posts":[{"id":4916,"url":"https:\/\/www.oilnewskenya.com\/index.php\/ormat-announces-commercial-operation-of-plant-4-in-olkaria-iii-in-kenya-expanding-complex-capacity-to-nearly-140-mw\/","url_meta":{"origin":4928,"position":0},"title":"Ormat Announces Commercial Operation of Plant 4 in Olkaria III in Kenya, Expanding Complex Capacity to Nearly 140 MW","author":"","date":"February 14, 2016","format":false,"excerpt":"Ormat Technologies has announced that it reached commercial operation of Plant 4 in the Olkaria III complex in Kenya, increasing the complex total generating capacity by 29 MW to 139 MW. Plant 4 will sell its electricity to Kenya Power and Lighting Company Limited (KPLC) under a 20-year PPA. In\u2026","rel":"","context":"In &quot;Geothermal&quot;","block_context":{"text":"Geothermal","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/renewables-2\/geothermal\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/08\/olkaria-plant-4.png?fit=505%2C320&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":5720,"url":"https:\/\/www.oilnewskenya.com\/index.php\/kengen-awards-mitsubishi-corporation-contract-to-construct-olkaria-v-geothermal-plant\/","url_meta":{"origin":4928,"position":1},"title":"KenGen Awards Mitsubishi Corporation Contract to Construct Olkaria V Geothermal Plant","author":"","date":"February 28, 2017","format":false,"excerpt":"Mitsubishi Corporation (MC), together with Mitsubishi Hitachi Power Systems Ltd. (MHPS) and H Young & Co. (E.A.) Ltd. (HY), has been awarded a full turnkey contract by Kenya Electricity Generating Company Ltd. for the construction of a geothermal power plant (Olkaria V) in Kenya. The installment will be the fifth\u2026","rel":"","context":"In &quot;Geothermal&quot;","block_context":{"text":"Geothermal","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/renewables-2\/geothermal\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/08\/olkaria-plant-4.png?fit=505%2C320&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":5896,"url":"https:\/\/www.oilnewskenya.com\/index.php\/president-uhuru-kenyatta-breaks-ground-for-olkaria-v-power-project\/","url_meta":{"origin":4928,"position":2},"title":"President Uhuru Kenyatta Breaks Ground For Olkaria V Power Project","author":"","date":"May 2, 2017","format":false,"excerpt":"President Uhuru Kenyatta last week\u00a0broke ground for the construction of the Olkaria V power project which will produce 158 MW of electricity. The President at the same time commissioned 14 wellhead units producing a total of 75 MW of electricity. The \u2018wellhead unit\u2019 is a unique technology developed by Kenyan\u2026","rel":"","context":"In &quot;Geothermal&quot;","block_context":{"text":"Geothermal","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/renewables-2\/geothermal\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2017\/05\/Uhuru-Olkaria-V.jpg?fit=960%2C766&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2017\/05\/Uhuru-Olkaria-V.jpg?fit=960%2C766&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2017\/05\/Uhuru-Olkaria-V.jpg?fit=960%2C766&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2017\/05\/Uhuru-Olkaria-V.jpg?fit=960%2C766&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":4971,"url":"https:\/\/www.oilnewskenya.com\/index.php\/kengen-commissions-the-entire-280mw-geothermal-project\/","url_meta":{"origin":4928,"position":3},"title":"KenGen commissions the entire 280MW geothermal project","author":"","date":"December 14, 2015","format":false,"excerpt":"The Kenya Electricity Generating Company (KenGen) on Thursday last week\u00a0inaugurated the 140MW Olkaria 1 power plant, the last phase of the\u00a0280 MW of Olkaria geothermal power the world\u2019s largest such power plant, a move that is expected to further stabilise the cost of electricity in the country. H.E President Paul\u2026","rel":"","context":"In &quot;Geothermal&quot;","block_context":{"text":"Geothermal","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/renewables-2\/geothermal\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/08\/Olkaria-II.jpg?fit=940%2C529&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/08\/Olkaria-II.jpg?fit=940%2C529&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/08\/Olkaria-II.jpg?fit=940%2C529&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/08\/Olkaria-II.jpg?fit=940%2C529&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":12610,"url":"https:\/\/www.oilnewskenya.com\/index.php\/toshiba-ess-kengen-conclude-mou-on-om-services-for-geothermal-power-plants\/","url_meta":{"origin":4928,"position":4},"title":"Toshiba ESS, KenGen Conclude MoU on O&#038;M Services for Geothermal Power Plants","author":"","date":"September 1, 2022","format":false,"excerpt":"Kenya Electricity Generating Company\u00a0 (KenGen) and Toshiba Energy Systems & Solutions Corporation (Toshiba ESS) concluded a memorandum of understanding (MOU). The MOU anticipates a partnership of Operation and Maintenance (O&M) services for geothermal power plants in developing countries including \u00a0East African countries through a combination of KenGen and Toshiba ESS\u2019s\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/07\/KenGen-Olkaria-VI.jpg?fit=1200%2C801&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/07\/KenGen-Olkaria-VI.jpg?fit=1200%2C801&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/07\/KenGen-Olkaria-VI.jpg?fit=1200%2C801&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/07\/KenGen-Olkaria-VI.jpg?fit=1200%2C801&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/07\/KenGen-Olkaria-VI.jpg?fit=1200%2C801&ssl=1&resize=1050%2C600 3x"},"classes":[]},{"id":4964,"url":"https:\/\/www.oilnewskenya.com\/index.php\/kengen-drilling-programme-records-unique-success\/","url_meta":{"origin":4928,"position":5},"title":"KenGen Drilling Programme Records Unique Success","author":"","date":"December 14, 2015","format":false,"excerpt":"KenGen has recorded significant steam finds in Olkaria, putting the company in a prime position to begin the next phase of capacity enhancement projects which are largely based on geothermal energy. A total of 375 megawatts (MW) is currently available for three planned projects with a total capacity of 350MW\u2026","rel":"","context":"In &quot;Geothermal&quot;","block_context":{"text":"Geothermal","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/renewables-2\/geothermal\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/08\/Menengai-Geothermal-Well.png?fit=529%2C395&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/08\/Menengai-Geothermal-Well.png?fit=529%2C395&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/08\/Menengai-Geothermal-Well.png?fit=529%2C395&ssl=1&resize=525%2C300 1.5x"},"classes":[]}],"jetpack_sharing_enabled":true,"jetpack_likes_enabled":true,"_links":{"self":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/4928","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/comments?post=4928"}],"version-history":[{"count":1,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/4928\/revisions"}],"predecessor-version":[{"id":4931,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/4928\/revisions\/4931"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media\/4930"}],"wp:attachment":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media?parent=4928"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/categories?post=4928"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/tags?post=4928"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}