{"id":477,"date":"2014-02-09T11:13:21","date_gmt":"2014-02-09T11:13:21","guid":{"rendered":"http:\/\/oilnewskenya.com\/?p=477"},"modified":"2015-11-02T14:09:24","modified_gmt":"2015-11-02T14:09:24","slug":"kenya-government-to-invite-bids-for-sh255-billion-crude-oil-pipeline","status":"publish","type":"post","link":"https:\/\/www.oilnewskenya.com\/index.php\/kenya-government-to-invite-bids-for-sh255-billion-crude-oil-pipeline\/","title":{"rendered":"Kenya Government to Invite Bids for Sh255 Billion Crude Oil Pipeline"},"content":{"rendered":"<p>Kenya is set to invite international bids for the design and\u00a0construction\u00a0of a\u00a0crude oil\u00a0pipeline linking the oil fields in Turkana and the Port of Lamu.<\/p>\n<p>In the first\u00a0acknowledgement\u00a0by a government official, Energy Secretary Davis Chirchir said the country\u2019s oil resources have attained commercial thresholds and that it was time the country started preparing infrastructure ahead of commercial production, hopefully in\u00a0three years.<\/p>\n<p>\u201cWe already have commercial quantities (600 million barrels per day) out of seven wells. We are, therefore, moving ahead with plans to begin production,\u201d Mr Chirchir told the Sunday Nation in an interview.<\/p>\n<p>\u201cWe will soon call for expressions of interest in\u00a0the project. We are looking at<\/p>\n<p>prospective\u00a0investors to submit\u00a0engineering, procurement and\u00a0construction\u00a0(EPC) models as well as their financing arrangements,\u201d he said.<\/p>\n<p>The plans by the ministry of Energy and Petroleum got a boost after Uganda signed a memorandum of understanding with Britain\u2019s Tullow Oil, France\u2019s Total and China\u2019s CNOOC last week in a significant step towards launching oil production in the country.<\/p>\n<p>The Kenya\u00a0pipeline is expected to cost about $3 billion (Sh255 billion) and would be laid along the Lamu Port-South Sudan-Ethiopia Transport (Lapsset) corridor from Lamu to Turkana. It will be linked to the Uganda oil fields and later extended to South Sudan and Ethiopia.<\/p>\n<p>An elaborate development plan prepared by the Energy ministry shows that production is likely to begin during the 2016\/7\u00a0financial year.<\/p>\n<p>The pipeline is in the pre-development phase, and its export capacity and length will be determined from the design proposals to be forwarded by the pipelineengineering\u00a0construction\u00a0firms.<\/p>\n<p>But government officials have ruled out any chance of the existing prospectors building the line.<\/p>\n<p>\u201cWith commercial reserves, Tullow may need to reduce its interest and allow other players to develop the pipeline,\u201d said an official at the Energy ministry.<\/p>\n<p>Construction\u00a0was expected to begin by the end of 2013 once feasibility studies contracted to ILF Consulting Engineers, a German-Austrian company, have been completed.<\/p>\n<p>This could mean South Sudan\u2019s expectation of transporting its oil through the pipeline could become a reality if\u00a0construction\u00a0begins immediately.<\/p>\n<p>However, energy sector experts who have welcomed the developments would prefer a private sector-driven deal with government approval to ensure speedyconstruction.<\/p>\n<p>\u201cWe understand the final investment decision on the pipeline will be made at the end of 2015. When infrastructure is committed by oil production companies, it moves very fast as it is part of monetising investments returns,\u201d said an analyst who declined to be named because he is involved in\u00a0the project\u00a0as a consultant for the government.<\/p>\n<p>\u201cThe design of the pipeline will detail the maximum and minimum capacity for the line. It will also include pumping stations,\u201d he added.<\/p>\n<p>As most of Kenyan and Ugandan crude is waxy, there are two exceptions: a heatedcrude oil\u00a0line or a line with in-built flow improvers. All seven successful wells are found in one field, and each new field within the basin will require a gathering station to\u00a0connect\u00a0several scattered wells to a common point. Pre-treatment points are also needed to clean up the crude and flow improvers, according to sector analysts.<\/p>\n<p>As to why a pipeline for crude rather than for finished products, the government may be seeking to reduce costs. In some places the practice is that the initial infrastructure is built and owned by the government.<\/p>\n<p>\u201cCrude oil\u00a0is faster to market over white products. It costs about $5 billion (Sh425 billion) to build a refinery and a similar amount for a pipeline from Lamu to Juba,\u201d the analyst said.<\/p>\n<p>Uganda has agreed to build a pipeline that would run to the yet-to-be-built Indian Ocean port at Lamu which is expected to become an export terminal for crude from Uganda, Kenya and other regional states.<\/p>\n<p>Toyota\u2019s\u00a0construction\u00a0subsidiary, Toyota Tsusho Corporation, is among firms that have drawn up preliminary designs for\u00a0the project, with several components in addition to the pipeline.<\/p>\n<p>In mid-January Tullow Oil said it was discussing an export pipeline with the Kenyan government following the discovery of commercially viable oil\u00a0deposits.<\/p>\n<p>The oil explorer then said the the northern Kenyan sites could eventually lead to production levels in excess of 1 billion barrels of oil.\u00a0The company\u00a0said it expects the Kenyan government to sanction\u00a0the project\u00a0by 2016 at the latest.<\/p>\n<p>\u201cGiven the significant volumes discovered, Tullow and partners have agreed with the Government of Kenya to commence development studies [for an oil pipeline],\u201dthe company\u00a0said while announcing new finds at Amosing 1 and Ewoi 1 wells, the seventh successful discovery in a campaign that has yielded a 100 per cent success rate.\u00a0The company\u00a0said it expects the Kenyan government to sanction\u00a0the projectby 2016 at the latest.<\/p>\n<p>In the case of Uganda, which has an estimated 3 billion barrels of\u00a0crude oil, building pipelines and a refinery, and based on flow rates for oil fields, developing Uganda\u2019s oil fields and building infrastructure would cost between $15 billion and $22 billion.<\/p>\n<p>Story By Daily Nation<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Kenya is set to invite international bids for the design and\u00a0construction\u00a0of a\u00a0crude oil\u00a0pipeline linking the oil fields in Turkana and the Port of Lamu. In the first\u00a0acknowledgement\u00a0by a government official, &hellip; <a href=\"https:\/\/www.oilnewskenya.com\/index.php\/kenya-government-to-invite-bids-for-sh255-billion-crude-oil-pipeline\/\" class=\"more-link\">Read More<\/a><\/p>\n","protected":false},"author":2,"featured_media":303,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":false,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[6],"tags":[538,1123,1252,1376,2042,2571,2589,2607],"class_list":["post-477","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news-by-others","tag-crude-oil","tag-indian-ocean","tag-kenya","tag-lamu","tag-pipeline","tag-tullow-oil","tag-turkana-oil","tag-uganda-oil","entry"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2013\/12\/pipeline.jpg?fit=301%2C167&ssl=1","jetpack_shortlink":"https:\/\/wp.me\/p5JWkQ-7H","jetpack-related-posts":[{"id":1299,"url":"https:\/\/www.oilnewskenya.com\/index.php\/east-african-countries-advertise-bid-for-lead-consultant-for-crude-oil-pipeline\/","url_meta":{"origin":477,"position":0},"title":"East African countries advertise bid for lead consultant for crude oil pipeline","author":"Samuel Kamau Mbote","date":"June 25, 2014","format":false,"excerpt":"[twitter-follow screen_name='oilnewskenya'] Kenya and Uganda have advertised for a lead consultant that will oversee the feasibility study and initial design for the construction of a 1300 kilometer pipeline from Uganda to Lamu Kenya to facilitate the production and export of oil in both countries. Speaking during the Oil and Energy\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":6702,"url":"https:\/\/www.oilnewskenya.com\/index.php\/kenya-starts-search-design-contractor-2-billion-crude-oil-pipeline\/","url_meta":{"origin":477,"position":1},"title":"Kenya starts Search for Design Contractor for its $2 billion Crude Oil Pipeline","author":"","date":"January 18, 2018","format":false,"excerpt":"The Ministry of Energy and Petroleum has invited eight bids from firms hoping to undertake the Front End Engineering Design (FEED) for the planned 892 kilometer crude oil pipeline between South Lokichar oil fields in Turkana and Lamu port. According to principal secretary in charge of the state department on\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/10\/Kenya-Uganda-pipeline-design-1.jpg?fit=900%2C610&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/10\/Kenya-Uganda-pipeline-design-1.jpg?fit=900%2C610&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/10\/Kenya-Uganda-pipeline-design-1.jpg?fit=900%2C610&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/10\/Kenya-Uganda-pipeline-design-1.jpg?fit=900%2C610&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":2931,"url":"https:\/\/www.oilnewskenya.com\/index.php\/search-east-africas-crude-oil-pipeline-builder-start-6-months\/","url_meta":{"origin":477,"position":2},"title":"Search for East Africa\u2019s Crude Oil Pipeline Builder to start in 6 Months","author":"","date":"May 18, 2015","format":false,"excerpt":"The search for the builder for the 1300km pipeline running from Uganda\u2019s Hoima region through Lokichar in Turkana all the way to the Kenyan coast will commence in six months according to Ministry of Energy and Petroleum principal secretary Joseph Njoroge. This follows the completion of the feasibility studies by\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"Crude Oil Pipeline Map","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/05\/Crude-Oil-Pipeline-Map.png?resize=350%2C200","width":350,"height":200},"classes":[]},{"id":7808,"url":"https:\/\/www.oilnewskenya.com\/index.php\/project-oil-kenya-to-target-an-initial-production-of-72000bopd\/","url_meta":{"origin":477,"position":3},"title":"PROJECT OIL KENYA TO TARGET AN INITIAL PRODUCTION OF 72,000BOPD","author":"","date":"October 30, 2019","format":false,"excerpt":"The Project Oil Kenya will target 72,000bopd to produce oil from the Ngamia, Amosing and Twiga fields with an estimated resource of 226mmbo (2c gross) during the foundation stage putting the estimated income by the country clearer compared to the 60,000 to 80,000bopd earlier reported The state department for Petroleun\u2026","rel":"","context":"In \"FID\"","block_context":{"text":"FID","link":"https:\/\/www.oilnewskenya.com\/index.php\/tag\/fid\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2019\/10\/South-Lokichar-Development-Phases.png?fit=309%2C365&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":3221,"url":"https:\/\/www.oilnewskenya.com\/index.php\/kenya-uganda-agree-crude-oil-pipeline-route\/","url_meta":{"origin":477,"position":4},"title":"Kenya, Uganda agree on crude oil pipeline route","author":"","date":"August 9, 2015","format":false,"excerpt":"The governments of Kenya and Uganda have announced that they have agreed on the route to be taken by the crude oil pipeline that will transport oil from the Albertine and Lokichar basins. The announcement comes as Kenya\u2019s president Uhuru Kenyatta continues his visit in Uganda where he has signed\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/05\/Crude-Oil-Pipeline-Map.png?fit=456%2C551&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":6452,"url":"https:\/\/www.oilnewskenya.com\/index.php\/kenya-joint-venture-partners-sign-joint-development-study-agreement-crude-oil-pipeline\/","url_meta":{"origin":477,"position":5},"title":"Kenya Joint Venture Partners Sign the Joint Development Study Agreement for the Crude Oil Pipeline","author":"","date":"October 24, 2017","format":false,"excerpt":"The Lokichar-Lamu crude oil pipeline today took a significant step forward following the signing of a Joint Development Study Agreement (JDA) between the Government of Kenya and Tullow Oil, Africa Oil and Maersk Oil (KJV Partners), to carry out a study for\u00a0the proposed 820 km crude oil pipeline. The joint\u00a0development\u00a0\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2017\/10\/Energy-CS-Charles-Keter-right-signing-the-Joint-Development-Study-Agreement-JDA-for-the-proposed-Lokichar-Lamu-crude-oil-pipeline.-Left-Martin-Mbogo-Country-Manager-Tullow-Oil.jpg?fit=844%2C680&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2017\/10\/Energy-CS-Charles-Keter-right-signing-the-Joint-Development-Study-Agreement-JDA-for-the-proposed-Lokichar-Lamu-crude-oil-pipeline.-Left-Martin-Mbogo-Country-Manager-Tullow-Oil.jpg?fit=844%2C680&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2017\/10\/Energy-CS-Charles-Keter-right-signing-the-Joint-Development-Study-Agreement-JDA-for-the-proposed-Lokichar-Lamu-crude-oil-pipeline.-Left-Martin-Mbogo-Country-Manager-Tullow-Oil.jpg?fit=844%2C680&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2017\/10\/Energy-CS-Charles-Keter-right-signing-the-Joint-Development-Study-Agreement-JDA-for-the-proposed-Lokichar-Lamu-crude-oil-pipeline.-Left-Martin-Mbogo-Country-Manager-Tullow-Oil.jpg?fit=844%2C680&ssl=1&resize=700%2C400 2x"},"classes":[]}],"jetpack_sharing_enabled":true,"jetpack_likes_enabled":true,"_links":{"self":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/477","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/comments?post=477"}],"version-history":[{"count":1,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/477\/revisions"}],"predecessor-version":[{"id":3989,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/477\/revisions\/3989"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media\/303"}],"wp:attachment":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media?parent=477"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/categories?post=477"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/tags?post=477"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}