{"id":4763,"date":"2016-06-17T20:10:15","date_gmt":"2016-06-17T20:10:15","guid":{"rendered":"http:\/\/www.oilnewskenya.com\/?p=4763"},"modified":"2017-01-25T07:32:27","modified_gmt":"2017-01-25T07:32:27","slug":"kenya-government-cautiously-optimistic-of-commencing-oil-exports-in-2017","status":"publish","type":"post","link":"https:\/\/www.oilnewskenya.com\/index.php\/kenya-government-cautiously-optimistic-of-commencing-oil-exports-in-2017\/","title":{"rendered":"Kenya Government \u2018Cautiously Optimistic\u2019 Of Commencing Oil Exports in 2017"},"content":{"rendered":"<p>The Government of Kenya \u00a0has said it remains cautiously optimistic of exporting crude oil from the lokichar basin by June 2017 having overcome the various challenges that remain including requisite infrastructure, storage and a new jetty according to chair Presidential Delivery unit head and deputy chief of staff in the office of the president Nzioka Waita.<\/p>\n<p><a href=\"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/06\/DSC0054.jpg?ssl=1\"><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" class=\" size-medium wp-image-4766 alignleft\" src=\"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/06\/DSC0054-300x199.jpg?resize=300%2C199&#038;ssl=1\" alt=\"_DSC0054\" width=\"300\" height=\"199\" srcset=\"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/06\/DSC0054.jpg?resize=300%2C199&amp;ssl=1 300w, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/06\/DSC0054.jpg?resize=100%2C66&amp;ssl=1 100w, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/06\/DSC0054.jpg?resize=768%2C510&amp;ssl=1 768w, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/06\/DSC0054.jpg?resize=1024%2C680&amp;ssl=1 1024w, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/06\/DSC0054.jpg?w=2340&amp;ssl=1 2340w, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/06\/DSC0054.jpg?w=3510&amp;ssl=1 3510w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a>According to Waita the process to upgrade the infrastructure is in top gear with contract awards to two contractors to be tasked with upgrading the Lodwar to Kitale road expected to be granted by end of June.<\/p>\n<p>\u201cCrude oil will be loaded on tanktainers at Lokichar by 06.2017 (initially 2000bbl\/day) Tanktainers trucked from Lokichar to Eldoret. Crude oil will be transported via rail to Mombasa for storage and offtake,\u201d says Waita.<\/p>\n<p>Works on the road will include paving as well as widening shoulders to allow road transport of the <a href=\"https:\/\/www.oilnewskenya.com\/south-lokichars-final-investment-decision-to-be-out-by-august-tullow-oil\/\">2000 barrels<\/a> of crude oil expected to be exported during the early oil phase and stored at the existing refinery at Changamwe till sufficient amounts for loading are achieved.<\/p>\n<p>\u201c&#8230; at peak production, we estimate fiscal revenues generated from oil to be about $9bn annually. To put that in context, $9bn is about 16 per cent of Kenya\u2019s 2013 GDP. It is enough to cover the cost of the Standard Gauge Railway line from Mombasa to Nairobi, \u201d Waita adds.<\/p>\n<p>On the jetty Waita says works are ongoing to facilitate the dock that was construed to handle only imports can now cater for exports.<\/p>\n<p>On road transport the deputy chief of staff added that the government had commitments for funding of an all-weather road from Lamu to Isiolo that will open up the north eastern frontier as well as allow security to be enhanced.<\/p>\n<p>Among the major challenges according to the government to date include the skill gap to handle the industry demands, completion of the petroleum master plan, road and railway improvement as well as ongoing review of the upstream tax regime.<\/p>\n<p>Others include the removal of fees by state agencies including the national environmental management authority (NEMA) and the National Construction Authority (NCA).<\/p>\n<p>\u201cWe are working with over 100 vocational to ensure we increase the human resource and bridge the skills gap as demanded by the industry.\u201d<\/p>\n<p>Among achievements highlighted by the government include the creation of a fully operational steering committee, enactment of the Energy and Petroleum Policy &amp; the Petroleum 2015 and Energy Bill 2015,<\/p>\n<p>Ongoing activities include evaluation of bids for the FEED &amp; ESIA, funding of pre-FID activities, joint development area agreements and project special purpose vehicle.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Government of Kenya \u00a0has said it remains cautiously optimistic of exporting crude oil from the lokichar basin by June 2017 having overcome the various challenges that remain including requisite &hellip; <a href=\"https:\/\/www.oilnewskenya.com\/index.php\/kenya-government-cautiously-optimistic-of-commencing-oil-exports-in-2017\/\" class=\"more-link\">Read More<\/a><\/p>\n","protected":false},"author":24,"featured_media":4764,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[11],"tags":[4581,4579,3234,4582,4064,4583,4584,1252,4590,1444,4580,1684,4587,1827,4589,4163,4162,4586,4585,2412,4588,3154],"class_list":["post-4763","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-top-news","tag-esia","tag-exports","tag-feed","tag-feed-esia","tag-fid","tag-funding-of-pre-fid-activities","tag-joint-development-area","tag-kenya","tag-kipevu-jetty","tag-lokichar","tag-national-construction-authority","tag-national-environmental-management-authority","tag-nzioka-waita","tag-oil","tag-presidential-delivery-unit-head","tag-rail","tag-road","tag-skills-gap","tag-special-purpose-vehicle","tag-storage","tag-tanktainers","tag-transport","entry"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/06\/Early-oil-concept.png?fit=332%2C386&ssl=1","jetpack_shortlink":"https:\/\/wp.me\/p5JWkQ-1eP","jetpack-related-posts":[{"id":6975,"url":"https:\/\/www.oilnewskenya.com\/index.php\/feed-contract-south-lokichar-awarded-may\/","url_meta":{"origin":4763,"position":0},"title":"FEED Contract for South Lokichar To Be Awarded by May","author":"","date":"April 25, 2018","format":false,"excerpt":"Tullow Oil has announced that the upstream baseline data collection for the environmental and social impact assessment (ESIA) has commenced and the front end engineering design (FEED) contract is expected to be awarded this month as the pre development phase for the South Lokichar fields proceeds. The pipeline ESIA work\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2018\/02\/Lokichar-Development-Concept.png?fit=642%2C474&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2018\/02\/Lokichar-Development-Concept.png?fit=642%2C474&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2018\/02\/Lokichar-Development-Concept.png?fit=642%2C474&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":6827,"url":"https:\/\/www.oilnewskenya.com\/index.php\/new-assessment-resources-south-lokichar-shows-25-lower-reported\/","url_meta":{"origin":4763,"position":1},"title":"New Assessment of Resources in South Lokichar Shows 25% lower Than Reported","author":"","date":"February 7, 2018","format":false,"excerpt":"A new full assessment of all the exploration and appraisal data, Tullow estimates that the South Lokichar basin contains the following recoverable resources 560mmbo 2C down from 766mmbo reported earlier by DeGolyer and MacNaughton Canada Limited (DMCL).The best 3C recoverable resources have also been downplayed to 1,230 mmbo from 1630mmbo\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/02\/KE-1316-Etuko-1-Marriott-PR46-Rig-2429-3.jpg?fit=512%2C768&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":6101,"url":"https:\/\/www.oilnewskenya.com\/index.php\/fid-uganda-albertine-project-start-feed-kenya-expected-end-2017\/","url_meta":{"origin":4763,"position":2},"title":"FID on Uganda Albertine Project, Start of FEED in Kenya expected by End of 2017","author":"","date":"June 28, 2017","format":false,"excerpt":"Partners in the Uganda Albertine Graben project namely Total E&P, CNOOC and Tullow Oil have said they expect the final investment decision on field development by the end of the year as earlier scheduled according to the latest trading statement and operational update by Tullow Oil. . This is based\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2017\/06\/court-hammer.jpg?fit=678%2C381&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2017\/06\/court-hammer.jpg?fit=678%2C381&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2017\/06\/court-hammer.jpg?fit=678%2C381&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":7549,"url":"https:\/\/www.oilnewskenya.com\/index.php\/agreements-over-land-title-water-supply-key-to-reaching-lokichar-fid-by-end-of-2019-tullow-oil\/","url_meta":{"origin":4763,"position":3},"title":"Agreements Over Land Title &#038; Water Supply Key to Reaching Lokichar FID By End of 2019 \u2013 Tullow Oil","author":"","date":"February 13, 2019","format":false,"excerpt":"KENYA Block 10BB and 13T operator Tullow Oil has listed concluding agreements over land title and water supply with the Government of Kenya as among the key tasks that the company is focused on in order to reach a Final Investment Decision by year end. According to the company in\u2026","rel":"","context":"In \"FID\"","block_context":{"text":"FID","link":"https:\/\/www.oilnewskenya.com\/index.php\/tag\/fid\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2019\/02\/Tullow-Oil.jpg?fit=713%2C476&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2019\/02\/Tullow-Oil.jpg?fit=713%2C476&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2019\/02\/Tullow-Oil.jpg?fit=713%2C476&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2019\/02\/Tullow-Oil.jpg?fit=713%2C476&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":6452,"url":"https:\/\/www.oilnewskenya.com\/index.php\/kenya-joint-venture-partners-sign-joint-development-study-agreement-crude-oil-pipeline\/","url_meta":{"origin":4763,"position":4},"title":"Kenya Joint Venture Partners Sign the Joint Development Study Agreement for the Crude Oil Pipeline","author":"","date":"October 24, 2017","format":false,"excerpt":"The Lokichar-Lamu crude oil pipeline today took a significant step forward following the signing of a Joint Development Study Agreement (JDA) between the Government of Kenya and Tullow Oil, Africa Oil and Maersk Oil (KJV Partners), to carry out a study for\u00a0the proposed 820 km crude oil pipeline. The joint\u00a0development\u00a0\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2017\/10\/Energy-CS-Charles-Keter-right-signing-the-Joint-Development-Study-Agreement-JDA-for-the-proposed-Lokichar-Lamu-crude-oil-pipeline.-Left-Martin-Mbogo-Country-Manager-Tullow-Oil.jpg?fit=844%2C680&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2017\/10\/Energy-CS-Charles-Keter-right-signing-the-Joint-Development-Study-Agreement-JDA-for-the-proposed-Lokichar-Lamu-crude-oil-pipeline.-Left-Martin-Mbogo-Country-Manager-Tullow-Oil.jpg?fit=844%2C680&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2017\/10\/Energy-CS-Charles-Keter-right-signing-the-Joint-Development-Study-Agreement-JDA-for-the-proposed-Lokichar-Lamu-crude-oil-pipeline.-Left-Martin-Mbogo-Country-Manager-Tullow-Oil.jpg?fit=844%2C680&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2017\/10\/Energy-CS-Charles-Keter-right-signing-the-Joint-Development-Study-Agreement-JDA-for-the-proposed-Lokichar-Lamu-crude-oil-pipeline.-Left-Martin-Mbogo-Country-Manager-Tullow-Oil.jpg?fit=844%2C680&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":5381,"url":"https:\/\/www.oilnewskenya.com\/index.php\/execution-of-jda-between-kenya-jv-partners-to-commence-by-year-end\/","url_meta":{"origin":4763,"position":5},"title":"Execution of JDA between Kenya, JV partners to Commence by Year-End","author":"","date":"November 9, 2016","format":false,"excerpt":"Tullow Oil has reported that it expects the Joint Development Agreement (JDA) setting out a structure for the Government of Kenya and the Kenya Joint Venture Partners (Maersk Oil, Africa Oil) to progress the development of the export pipeline to commence execution by year-end. According to the latest trading update\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/02\/KE-1316-Etuko-1-Marriott-PR46-Rig-2429-3.jpg?fit=512%2C768&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]}],"jetpack_sharing_enabled":true,"jetpack_likes_enabled":true,"_links":{"self":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/4763","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/comments?post=4763"}],"version-history":[{"count":4,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/4763\/revisions"}],"predecessor-version":[{"id":4769,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/4763\/revisions\/4769"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media\/4764"}],"wp:attachment":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media?parent=4763"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/categories?post=4763"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/tags?post=4763"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}