{"id":4761,"date":"2016-06-16T14:36:29","date_gmt":"2016-06-16T14:36:29","guid":{"rendered":"http:\/\/www.oilnewskenya.com\/?p=4761"},"modified":"2017-01-25T07:33:18","modified_gmt":"2017-01-25T07:33:18","slug":"2d-seismic-commences-in-kenyas-block-2a-amid-tension","status":"publish","type":"post","link":"https:\/\/www.oilnewskenya.com\/index.php\/2d-seismic-commences-in-kenyas-block-2a-amid-tension\/","title":{"rendered":"2D Seismic Commences in Kenya\u2019s Block 2A Amid Tension"},"content":{"rendered":"<p>Simba Energy has announced that survey work on Block 2A commenced on Sunday June 12, 2016 as earlier <a href=\"http:\/\/ow.ly\/gg43301kiwv\">announced<\/a> and will be followed in the next ten days by the cutting of the seismic lines, in order that seismic data acquisition can occur.<\/p>\n<p>This follows days of opposition by the adjacent community in Wajir who feared that the exercise would lead to the destruction of the environment and displacement from fields the pastoralist communities grazes their animals for pasture.<\/p>\n<p>\u201cThe Company is also pleased to report that following Simba\u2019s Managing Director- Operations, Hassan Hassan\u2019s successful meetings with elders and community leaders in Wajir, Kenya, the parties have come to an understanding regarding allocation of work and services matters on Block 2A,\u201d the company CEO Punkaj Gupta said.<\/p>\n<p>The block operator and its partner Essel Group Middle East say they plan to complete the 2D Seismic Data Acquisition and Processing program in the next 60 days with a view to targeting final locations for drilling later in 2016.<\/p>\n<p>\u201cWe are pleased with the co-operation being extended to the Company by the local communities. We are keen to complete our work in the field in a respectful and thoughtful manner.\u201d adds Punkaj.<\/p>\n<p>The seismic exercise involves the acquiring and interpreting of up to 500 line kms of 2D seismic data which will also confirm depths and support the volume estimates necessary for a revised resource estimate and risk category for the concession\u2019s prospects and other secondary targeted structures.<\/p>\n<p>Already the company has completed an aerial\u00a0<a href=\"http:\/\/ow.ly\/wiA7300W7lp\">FTG<\/a>\u00a0(Full Tensor Gradiometry) survey analysis and interpretation by Bell Geospace in August 2014 as well as passive seismic data from 218 listening stations covered the Company\u2019s existing three leads<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Simba Energy has announced that survey work on Block 2A commenced on Sunday June 12, 2016 as earlier announced and will be followed in the next ten days by the &hellip; <a href=\"https:\/\/www.oilnewskenya.com\/index.php\/2d-seismic-commences-in-kenyas-block-2a-amid-tension\/\" class=\"more-link\">Read More<\/a><\/p>\n","protected":false},"author":24,"featured_media":1609,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[11],"tags":[26,227,273,3299,937,4578,1252,4553,4577,4353,2312,2695],"class_list":["post-4761","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-top-news","tag-2d-seismic","tag-bell-geospace","tag-block-2a","tag-essel-group","tag-full-tensor-gradiometry","tag-hassan-hassan","tag-kenya","tag-passive-seismic","tag-pastoralist","tag-punkaj-gupta","tag-simba-energy","tag-wajir","entry"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/08\/block-2a.png?fit=301%2C269&ssl=1","jetpack_shortlink":"https:\/\/wp.me\/p5JWkQ-1eN","jetpack-related-posts":[{"id":5093,"url":"https:\/\/www.oilnewskenya.com\/index.php\/seismic-acquisition-in-kenyas-block-2a-paralyzed-after-row-with-local-community\/","url_meta":{"origin":4761,"position":0},"title":"Seismic Acquisition in Kenya\u2019s Block 2A Paralyzed After Row With Local Community","author":"","date":"August 29, 2016","format":false,"excerpt":"Oil exploration in Wajir has been paralyzed for about a week after equipment being utilized in the ongoing 2D seismic acquisition was vandalized as the local community blamed Simba Energy of not honoring the MoU. According to the company country managing director James Jenkin members of the local committee have\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/08\/block-2a.png?fit=301%2C269&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":4518,"url":"https:\/\/www.oilnewskenya.com\/index.php\/2d-seismic-in-kenyas-block-2a-to-commence-in-may-2016\/","url_meta":{"origin":4761,"position":1},"title":"2D Seismic in Kenya\u2019s Block 2A To Commence in May 2016","author":"","date":"March 22, 2016","format":false,"excerpt":"Simba Energy has said that through its subsidiary Company Simba Africa Rift Limited together with its farm in partner Essel Group ME (EGME), have agreed that the 2D Seismic Data Acquisition and Processing program will cover approximately 500 line km of survey to commence in early May 2016. Simba says\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"wajir passive seismic","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/03\/wajir-passive-seismic-300x200.jpg?resize=350%2C200","width":350,"height":200},"classes":[]},{"id":5978,"url":"https:\/\/www.oilnewskenya.com\/index.php\/essel-engages-sproule-update-new-resource-estimate-block-2a-kenya\/","url_meta":{"origin":4761,"position":2},"title":"Essel Engages Sproule To Update New Resource Estimate On Block 2A, Kenya","author":"","date":"May 18, 2017","format":false,"excerpt":"Simba Essel Energy has announced that its partner \u2013\u00a0Essel Group Middle East (EGME)\u00a0has contracted the services of Sproule International Limited to complete 2D seismic interpretation services, a prospective resource estimate, and an updated NI 51-101 report for block 2A in Wajir,\u00a0Kenya. The scope of work involves an update of Sproule\u2019s\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/08\/block-2a.png?fit=301%2C269&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":6561,"url":"https:\/\/www.oilnewskenya.com\/index.php\/simba-essel-acquire-3d-seismic-kenyas-block-2a-ahead-drilling\/","url_meta":{"origin":4761,"position":3},"title":"Simba Essel to Acquire 3D Seismic in Kenya\u2019s Block 2A Ahead of Drilling","author":"","date":"November 22, 2017","format":false,"excerpt":"Simba Essel has announced that following a review of the Sproule report, (the 51-101 report) it now plans to proceed with a 3D seismic program covering approximately 160 square kilometers over its most promising area in early 2018 as OilNews Kenya had earlier reported. The 3D seismic is expected to\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2017\/11\/Block-2A-seismic.jpg?fit=1000%2C563&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2017\/11\/Block-2A-seismic.jpg?fit=1000%2C563&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2017\/11\/Block-2A-seismic.jpg?fit=1000%2C563&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2017\/11\/Block-2A-seismic.jpg?fit=1000%2C563&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":5595,"url":"https:\/\/www.oilnewskenya.com\/index.php\/simba-essel-group-middle-east-complete-2d-seismic-data-acquisition-on-block-2-a\/","url_meta":{"origin":4761,"position":4},"title":"Simba, Essel Group Middle East complete 2D seismic data acquisition on block 2-A","author":"","date":"December 16, 2016","format":false,"excerpt":"Simba Energy and\u00a0Essel Group Middle East\u00a0have announced that the 2D seismic acquisition program on Block 2A in Wajir, Kenya has been successfully completed by Africa Geophysical Services Ltd (AGS). The survey has acquired a total of 520 kilometres of 2D seismic data on the block lying within the Mandera basin.\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/08\/block-2a.png?fit=301%2C269&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":5757,"url":"https:\/\/www.oilnewskenya.com\/index.php\/kenyas-block-2a-seismic-results-expected-in-april\/","url_meta":{"origin":4761,"position":5},"title":"Kenya&#8217;s Block 2A seismic results expected in April","author":"","date":"March 14, 2017","format":false,"excerpt":"Following the completion of acquisition of 2D seismic in Block 2A earlier this month by Africa Geophysical Services Ltd Simba Energy says processing of lines is ongoing with the process expected to be finished in the next 30 days. The 2D seismic acquired a total of five hundred and twenty\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/08\/block-2a.png?fit=301%2C269&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]}],"jetpack_sharing_enabled":true,"jetpack_likes_enabled":true,"_links":{"self":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/4761","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/comments?post=4761"}],"version-history":[{"count":1,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/4761\/revisions"}],"predecessor-version":[{"id":4762,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/4761\/revisions\/4762"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media\/1609"}],"wp:attachment":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media?parent=4761"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/categories?post=4761"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/tags?post=4761"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}