{"id":4564,"date":"2016-04-12T16:28:03","date_gmt":"2016-04-12T16:28:03","guid":{"rendered":"http:\/\/www.oilnewskenya.com\/?p=4564"},"modified":"2017-01-25T10:21:47","modified_gmt":"2017-01-25T10:21:47","slug":"kenyas-annual-receipts-could-reach-3-billion-annually-once-oil-price-rebounds","status":"publish","type":"post","link":"https:\/\/www.oilnewskenya.com\/index.php\/kenyas-annual-receipts-could-reach-3-billion-annually-once-oil-price-rebounds\/","title":{"rendered":"Kenya\u2019s Annual Receipts Could Reach $3 Billion Annually Once Oil Price Rebounds"},"content":{"rendered":"<p>A discussion paper dubbed \u201cPotential Government Revenues from Turkana Oil\u201d released in April 2016 estimate that annual receipts to the Government of Kenya could range from $800 million to as much as $3 billion. The high earnings are at an estimated barrel price of $85 while the low estimates\u00a0 are at $45\/bbl.<\/p>\n<p>The amounts are estimates from the three sources of government revenue as per the production sharing system that include profit oil, a windfall tax imposed when oil is over USD50 per barrel, and the right to acquire an equity stake in the project.<\/p>\n<p><a href=\"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/04\/Governmet-Revenues-vs-Oil-Price.png?ssl=1\"><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" class=\" size-medium wp-image-4565 alignleft\" src=\"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/04\/Governmet-Revenues-vs-Oil-Price-300x205.png?resize=300%2C205&#038;ssl=1\" alt=\"Governmet Revenues vs Oil Price\" width=\"300\" height=\"205\" srcset=\"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/04\/Governmet-Revenues-vs-Oil-Price.png?resize=300%2C205&amp;ssl=1 300w, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/04\/Governmet-Revenues-vs-Oil-Price.png?resize=100%2C68&amp;ssl=1 100w, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/04\/Governmet-Revenues-vs-Oil-Price.png?w=548&amp;ssl=1 548w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a><\/p>\n<p>&#8220;Assuming that the project does move ahead, as the analysis above has shown, the oil price will have a profound impact on the volume of revenue flowing to national and subnational governments,&#8221; reads conclusions from the discussion paper.<\/p>\n<p>The discussion paper compiled by Cordaid, Timu, Kenya Civil Society Platform on Oil and Gas and Resources for Development Consulting says that the estimated 600 million barrels evacuation will be the greatest challenge with the remoteness of the discovery sites only favoring the pipeline as the only viable option.<\/p>\n<p>This pours cold water on attempts by the government to export oil by road and rail in order to speed up first oil exports and more of a short term measure.<\/p>\n<p>A feasibility study for routing Ugandan oil through Tanzania is currently underway while the engineering work required to generate firm estimates on overall costs, to devise specific plans for overcoming technical challenges, and to establish a per barrel tariff for both Ugandan and Turkana crude, has not yet begun.<\/p>\n<p><a href=\"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/04\/Block-10BB-13T-pipeline.png?ssl=1\"><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-4566 size-full\" src=\"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/04\/Block-10BB-13T-pipeline.png?resize=406%2C360&#038;ssl=1\" alt=\"Block 10BB 13T pipeline\" width=\"406\" height=\"360\" srcset=\"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/04\/Block-10BB-13T-pipeline.png?w=406&amp;ssl=1 406w, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/04\/Block-10BB-13T-pipeline.png?resize=100%2C89&amp;ssl=1 100w, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/04\/Block-10BB-13T-pipeline.png?resize=300%2C266&amp;ssl=1 300w\" sizes=\"auto, (max-width: 406px) 100vw, 406px\" \/><\/a><\/p>\n<p>The report backs up views by various pundits that first oil through pipeline transport could be around 2021 on the earliest with a final investment decision or project sanction sometime in 2017\/18 at the earliest and the minimum time to build the pipeline is three and a half years according to the Toyota Tsusho Pipeline Report.<\/p>\n<p>&#8220;The most important upcoming milestone for Turkana oil therefore is the final investment decision for both the upstream operations and the pipeline. Assuming a decision in 2017, the earliest possible date for first exports through the pipeline would be late 2021.&#8221;<\/p>\n<p>The paper further estimates that exploration costs through to the beginning of the development phase in 2017 will be $ 1.8 billion. Cost estimates for the development phase are at an average of $6\/barrel in Uganda as provided by Tullow Oil to investors in October 2015.<\/p>\n<p>The estimates in the Petroleum Master Plan (10% of development costs) are very high the paper laments. The originators of the paper also assumed 6% of development costs that results in an average operating cost of $7 per barrel in comparison with International Energy Agency data on large, onshore oil fields.<\/p>\n<p>Going by the Toyota Tsusho design the estimated transit fee for oil per barrel would be $15.20 and the corresponding tariff for crude originating in Turkana, according to the Toyota Tsusho Pipeline Report would be $10.70.<\/p>\n<p>The paper estimates on the overall cost correlate with Tullow\u2019s recent cost estimate of around $25 dollars per barrel for Turkana oil.<\/p>\n<p>\u201cA true breakeven price, however, would need to take into account the discount to Brent identified above as well as the profit oil allocation to the government,\u201d the paper cites.<\/p>\n<p>Back to production the paper estimates that during the first phase the peak will stand at 75,000 bopd which will surge to 150,000 bopd \u00a0during the second phase.<\/p>\n<p>The paper assumes that State participation from the production sharing terms for Block 10BB and 13T at 20% and 22.5% respectively.<\/p>\n<p>&#8220;Capacity building should be a priority, both at both national and regional levels and within and outside of government (including for civil society and local communities), as the Turkana oil projects move from discovery towards development and eventual production,&#8221; \u00a0the paper recommends.<\/p>\n<p>&#8220;A key aim of the report is to deal with expectations around future revenues, present a profile of likely revenues, track costs and more critically the timelines. While there are limits to analysis based exclusively on public domain information, it also points to the need for increased transparency and accountability in the oil and gas sector in Kenya,&#8221; concludes\u00a0Kenya Civil Society Platform on Oil and Gas\u00a0Coordinator<em>\u00a0<\/em>Charles Wanguhu.<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>A discussion paper dubbed \u201cPotential Government Revenues from Turkana Oil\u201d released in April 2016 estimate that annual receipts to the Government of Kenya could range from $800 million to as &hellip; <a href=\"https:\/\/www.oilnewskenya.com\/index.php\/kenyas-annual-receipts-could-reach-3-billion-annually-once-oil-price-rebounds\/\" class=\"more-link\">Read More<\/a><\/p>\n","protected":false},"author":24,"featured_media":4567,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[7,11],"tags":[259,266,439,4323,3183,1160,1258,1881,3205,4327,4325,4324,4326,4328,2571,2589],"class_list":["post-4564","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-oil-politics","category-top-news","tag-block-10bb","tag-block-13t","tag-charles-wanguhu","tag-cordaid","tag-final-investment-decision","tag-international-energy-agency","tag-kenya-civil-society-platform-on-oil-and-gas","tag-oil-price","tag-petroleum-master-plan","tag-potential-government-revenues-from-turkana-oil","tag-resources-for-development-consulting","tag-timu","tag-toyota-tsusho","tag-toyota-tsusho-pipeline-report","tag-tullow-oil","tag-turkana-oil","entry"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/04\/Turkana-Oil-Discussion-Paper.png?fit=396%2C561&ssl=1","jetpack_shortlink":"https:\/\/wp.me\/p5JWkQ-1bC","jetpack-related-posts":[{"id":477,"url":"https:\/\/www.oilnewskenya.com\/index.php\/kenya-government-to-invite-bids-for-sh255-billion-crude-oil-pipeline\/","url_meta":{"origin":4564,"position":0},"title":"Kenya Government to Invite Bids for Sh255 Billion Crude Oil Pipeline","author":"Samuel Kamau Mbote","date":"February 9, 2014","format":false,"excerpt":"Kenya is set to invite international bids for the design and\u00a0construction\u00a0of a\u00a0crude oil\u00a0pipeline linking the oil fields in Turkana and the Port of Lamu. In the first\u00a0acknowledgement\u00a0by a government official, Energy Secretary Davis Chirchir said the country\u2019s oil resources have attained commercial thresholds and that it was time the country\u2026","rel":"","context":"In &quot;News by others&quot;","block_context":{"text":"News by others","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/news-by-others\/"},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":2161,"url":"https:\/\/www.oilnewskenya.com\/index.php\/dfid-kenya-to-support-engagement-of-communities-oil-companies-and-ngos-in-turkana-kenya\/","url_meta":{"origin":4564,"position":1},"title":"DFID-Kenya to support engagement of communities, oil companies and NGOs in Turkana, Kenya","author":"Samuel Kamau Mbote","date":"December 11, 2014","format":false,"excerpt":"The UK\u2019s Department for International Development (DFID-Kenya) has said it is committed to Turkana County Government that it will support engagement of communities, with oil companies and NGOs, for local development of areas affected by oil explorations. Speaking during the signing of the framework, Head of DFID Kenya, Lisa Phillips\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":1096,"url":"https:\/\/www.oilnewskenya.com\/index.php\/oil-exploration-contributes-kshs-8-2b-for-kenyan-economy-creates-3000-jobs-tullow-oil\/","url_meta":{"origin":4564,"position":2},"title":"Oil Exploration contributes Kshs 8.2b for Kenyan Economy, Creates 3000 jobs &#8211; Tullow Oil","author":"Samuel Kamau Mbote","date":"May 28, 2014","format":false,"excerpt":"[twitter-follow screen_name='oilnewskenya'] Businesses across Kenya last year made Kshs 8.2 billion in revenues from supplying services to Tullow Kenya and contractors carrying out oil exploration in the country, a report released today by the firm says. Kshs 4.1 billion came from supplying Tullow Kenya directly, representing an increase of nearly\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/05\/tullow-report.jpg?fit=605%2C624&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/05\/tullow-report.jpg?fit=605%2C624&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/05\/tullow-report.jpg?fit=605%2C624&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":3190,"url":"https:\/\/www.oilnewskenya.com\/index.php\/kenya-uganda-commence-production-mid-2020-tullow-oil\/","url_meta":{"origin":4564,"position":3},"title":"Kenya, Uganda to commence oil production in mid 2020 \u2013 Tullow Oil","author":"","date":"July 30, 2015","format":false,"excerpt":"Kenya and Uganda could start producing oil three and a half years after project sanction expected by the end of 2016 according to the latest half year results by the company. According to the report the company expects to have drilled 200 to 300 wells in phases in Kenya almost\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/02\/oil-and-gas-jobs.jpg?fit=700%2C466&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/02\/oil-and-gas-jobs.jpg?fit=700%2C466&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/02\/oil-and-gas-jobs.jpg?fit=700%2C466&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/02\/oil-and-gas-jobs.jpg?fit=700%2C466&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":5324,"url":"https:\/\/www.oilnewskenya.com\/index.php\/oped-early-oil-pilot-scheme-eopsan-enabler-not-a-replacement-for-the-full-field-development\/","url_meta":{"origin":4564,"position":4},"title":"OpEd: Early Oil Pilot scheme (EOPS)an enabler, not a replacement for the Full Field Development","author":"","date":"October 21, 2016","format":false,"excerpt":"by Andrew Kamau, PS Department of Petroleum; Ministry of Energy & Petroleum The last four years have been the most remarkable period in Kenya\u2019s Oil and Gas industry since exploration began in the country in the early forties.\u00a0 During this period, over 45 Oil and Gas exploration wells have been\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/10\/IMG_5326.jpg?fit=1200%2C800&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/10\/IMG_5326.jpg?fit=1200%2C800&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/10\/IMG_5326.jpg?fit=1200%2C800&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/10\/IMG_5326.jpg?fit=1200%2C800&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/10\/IMG_5326.jpg?fit=1200%2C800&ssl=1&resize=1050%2C600 3x"},"classes":[]},{"id":506,"url":"https:\/\/www.oilnewskenya.com\/index.php\/kenya-to-exploit-oil-before-uganda\/","url_meta":{"origin":4564,"position":5},"title":"Kenya to exploit oil before Uganda","author":"Samuel Kamau Mbote","date":"February 14, 2014","format":false,"excerpt":"[twitter-follow screen_name='oilnewskenya'] Kenya will start oil production before its neighbour Uganda according to Tullow Oil discovered having announced its first oil discovery six years after its western neighbour. Tullow Oil together with its partner Africa oil say that talks are on course with the Kenyan government for it to start\u2026","rel":"","context":"In &quot;Oil Politics&quot;","block_context":{"text":"Oil Politics","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/oil-politics\/"},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]}],"jetpack_sharing_enabled":true,"jetpack_likes_enabled":true,"_links":{"self":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/4564","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/comments?post=4564"}],"version-history":[{"count":3,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/4564\/revisions"}],"predecessor-version":[{"id":4571,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/4564\/revisions\/4571"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media\/4567"}],"wp:attachment":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media?parent=4564"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/categories?post=4564"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/tags?post=4564"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}