{"id":4527,"date":"2016-03-29T08:03:49","date_gmt":"2016-03-29T08:03:49","guid":{"rendered":"http:\/\/www.oilnewskenya.com\/?p=4527"},"modified":"2017-01-25T10:44:40","modified_gmt":"2017-01-25T10:44:40","slug":"tanzanias-gas-demand-to-outstrip-supply-by-2018","status":"publish","type":"post","link":"https:\/\/www.oilnewskenya.com\/index.php\/tanzanias-gas-demand-to-outstrip-supply-by-2018\/","title":{"rendered":"Tanzania\u2019s Gas Demand To Outstrip Supply by 2018"},"content":{"rendered":"<p>Tanzania is expected to surpass its current supply in the next two years with the current demand being 80mmscf\/d mainly from existing power plants as the country continues to experience chronic power shortages according to Wentworth Resources.<\/p>\n<p>Next year the demand is expected to surge to 120mmscf\/d with the new buyers mainly being industrial users.<\/p>\n<p>Currently Tanzania has two gas processing facilities the Gas Processing plant at Madimba capacity of up to 210mmscf\/d and Songo Songo gas processing facility with capacity of up to 140mmscf\/d supplied by a 36 inch gas line and 16 inch gas line respectively.<\/p>\n<p><a href=\"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/03\/Tanzania-Gas-Fields-and-Infrastructure.png?ssl=1\"><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" class=\"alignleft wp-image-4528 size-full\" src=\"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/03\/Tanzania-Gas-Fields-and-Infrastructure.png?resize=451%2C557&#038;ssl=1\" alt=\"Tanzania Gas Fields and Infrastructure\" width=\"451\" height=\"557\" srcset=\"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/03\/Tanzania-Gas-Fields-and-Infrastructure.png?w=451&amp;ssl=1 451w, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/03\/Tanzania-Gas-Fields-and-Infrastructure.png?resize=81%2C100&amp;ssl=1 81w, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/03\/Tanzania-Gas-Fields-and-Infrastructure.png?resize=243%2C300&amp;ssl=1 243w\" sizes=\"auto, (max-width: 451px) 100vw, 451px\" \/><\/a>Mnazi Bay JV consisting of Maurel et Prom (Operator), Wentworth Resources and TPDC is currently the only supplier of gas in Tanzania into new pipeline with the gas sales agreement signed in September 2014 being to supply up to 130mmscf\/d although production volumes are expected to reach 70-80mmscf\/d by end Q1 2016 and remain in this levels until 2017.<\/p>\n<p>Gas from Mnazi Bay is currently being used to fire the Kinyerezi-1 power generation plant with a 150 MW production capacity.<\/p>\n<p>The capacity of the Songas processing plant was increased further to 105MMScfd,\u00a035MMSCfd above design capacity and 15MMscfd on top of\u00a0designed capacity. Songas\u2019 facilities are now at their physical limits and cannot increase throughput any further without a significant investment.<\/p>\n<p>Gas from the Songo Songo gas field is processed on the island at Songas&#8217; processing facility to remove water and other hydrocarbon condensates. It is then transported through a 225 kilometre pipeline to Dar es Salaam where it is used in Songas\u2019 Ubungo Power Plant (\u201cUPP\u201d), the largest gas-fired power station in East Africa.<\/p>\n<p>Songas\u2019 power plant is located in Ubungo and uses six aero-derivative gas fired turbines that generate 180MW of electricity or approximately 25% of Tanzania\u2019s current electricity demand.\u00a0This electricity is supplied to the national electricity grid and distributed to end users by TANESCO.<\/p>\n<p>The current total electricity production from gas fired power stations is at 595MW broken down as Ubungo I Thermal Power Station 100MW, Ubungo II Thermal Power Station 120MW, Tegeta Thermal Power Station 45MW, Mtwara Thermal Power Station 18MW, Songas Thermal Power Station 180MW \u00a0and Kinyerezi I Thermal Power Station 150MW.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Tanzania is expected to surpass its current supply in the next two years with the current demand being 80mmscf\/d mainly from existing power plants as the country continues to experience &hellip; <a href=\"https:\/\/www.oilnewskenya.com\/index.php\/tanzanias-gas-demand-to-outstrip-supply-by-2018\/\" class=\"more-link\">Read More<\/a><\/p>\n","protected":false},"author":24,"featured_media":4529,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[11],"tags":[730,3217,961,4254,1534,1608,4252,1696,2065,4253,2463,2466,4251,4248,2543,4249,4250,2719],"class_list":["post-4527","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-top-news","tag-electricity","tag-gas-processing-plant","tag-gas-sales-agreement","tag-kinyerezi-i-thermal-power-station","tag-maurel-et-prom","tag-mnazi-bay","tag-mtwara-thermal-power-station","tag-natural-gas","tag-power","tag-songas-thermal-power-station","tag-tanesco","tag-tanzania","tag-tegeta-thermal-power-station","tag-thermal-electricity","tag-tpdc","tag-ubungo-i-thermal-power-station","tag-ubungo-ii-thermal-power-station","tag-wentworth-resources","entry"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/03\/Kinyerezi-Gas-Receiving-Station.png?fit=455%2C217&ssl=1","jetpack_shortlink":"https:\/\/wp.me\/p5JWkQ-1b1","jetpack-related-posts":[{"id":5440,"url":"https:\/\/www.oilnewskenya.com\/index.php\/mnazi-bay-jv-partners-see-sales-decline-following-symbion-power-plant-closure\/","url_meta":{"origin":4527,"position":0},"title":"Mnazi Bay JV Partners See Sales Decline following Symbion Power Plant Closure","author":"","date":"November 29, 2016","format":false,"excerpt":"Mnazi Bay joint venture partners have seen a decline in gas sales as the average gross daily gas production for the third quarter was 34 MMscf\/d down from 51 MMscf\/d during Q2 2016 the suspension of operations at the Symbion gas-fired power plant as a result of a dispute with\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/11\/symbion-power-plant.png?fit=710%2C294&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/11\/symbion-power-plant.png?fit=710%2C294&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/11\/symbion-power-plant.png?fit=710%2C294&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/11\/symbion-power-plant.png?fit=710%2C294&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":330,"url":"https:\/\/www.oilnewskenya.com\/index.php\/factfile-songo-songo-gas-development-and-power-generation-project-tanzania\/","url_meta":{"origin":4527,"position":1},"title":"Factfile: Songo Songo Gas Development and Power-Generation Project, Tanzania","author":"Samuel Kamau Mbote","date":"January 6, 2014","format":false,"excerpt":"The Songo Songo gas field is located on and offshore Songo Songo island, about 15km from the Tanzanian mainland and 200km south of the commercial capital, Dar es Salaam. The project serves two onshore and three offshore natural gas wells at the island, the gas from the wells being piped\u2026","rel":"","context":"In &quot;Elsewhere in Africa&quot;","block_context":{"text":"Elsewhere in Africa","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/elsewhere-in-africa\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/01\/1-songo-songo.jpg?fit=400%2C300&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":5725,"url":"https:\/\/www.oilnewskenya.com\/index.php\/wentworth-resources-reports-increased-gas-sales-in-tanzania\/","url_meta":{"origin":4527,"position":2},"title":"Wentworth Resources Reports Increased Gas Sales in Tanzania","author":"","date":"February 28, 2017","format":false,"excerpt":"Wentworth Resources in its latest update and Q4 2016 Financial Statements\u00a0has reported that the Mnazi Bay field achieved average gross daily gas production during the fourth quarter of 39.4 MMscf\/d up from 34.3 MMscf\/d during Q3 2016 due to less downtime experienced at the gas fired power generation facilities, Ubungo-II\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/05\/Wentworth-Resources.png?fit=375%2C286&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":4251,"url":"https:\/\/www.oilnewskenya.com\/index.php\/mnazi-bay-production-volume-to-reach-70-mmscfday-q1-2016\/","url_meta":{"origin":4527,"position":3},"title":"Mnazi Bay Production Volume To Reach 70 MMscf\/day in Q1 2016","author":"","date":"January 14, 2016","format":false,"excerpt":"Gas deliveries to the new transnational pipeline and directly to a power plant in Mtwara averaged 55 MMscf\/d production \u00a0during the month of December 2015 up from 46 MMscf\/d in November. To date, growing gas demand from the power sector has been impacted by delays experienced in commissioning the new\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/01\/Mnazi-Bay-Concession.png?fit=448%2C554&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":1547,"url":"https:\/\/www.oilnewskenya.com\/index.php\/wentworth-anticipates-its-first-gas-delivery-from-tanzania-to-be-q1-2015\/","url_meta":{"origin":4527,"position":4},"title":"Wentworth anticipates its first gas delivery from Tanzania to be in Q1 2015","author":"Samuel Kamau Mbote","date":"August 4, 2014","format":false,"excerpt":"Wentworth resources which has interest in the Mnazi Bay concession expects its first gas delivery in the first quarter of 2015 according to a presentation made in June to investors. Wentworth says the delivery will be under take or pay agreement with delivery point adjacent to existing facilities. The delivery\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/08\/songo-songo2.png?fit=465%2C546&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":4044,"url":"https:\/\/www.oilnewskenya.com\/index.php\/tanzania-mnazi-bay-production-volume-at-33-mmscfday-in-october\/","url_meta":{"origin":4527,"position":5},"title":"Tanzania Mnazi Bay Production Volume at 33 mmscf\/day in October","author":"","date":"November 4, 2015","format":false,"excerpt":"Production volumes to the new transnational pipeline in October to production facilities at Madimba, the Mtwara to Dar es Salaam pipeline and the Kinyerezi Gas Receiving Facility stood at 33 mmscf\/day. This is from three of the five existing gas wells at Mnazi Bay that have been successfully brought on-stream\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/11\/Production-operations-at-Mnazi-Bay-MB-3-development-well.png?fit=850%2C477&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/11\/Production-operations-at-Mnazi-Bay-MB-3-development-well.png?fit=850%2C477&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/11\/Production-operations-at-Mnazi-Bay-MB-3-development-well.png?fit=850%2C477&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/11\/Production-operations-at-Mnazi-Bay-MB-3-development-well.png?fit=850%2C477&ssl=1&resize=700%2C400 2x"},"classes":[]}],"jetpack_sharing_enabled":true,"jetpack_likes_enabled":true,"_links":{"self":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/4527","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/comments?post=4527"}],"version-history":[{"count":1,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/4527\/revisions"}],"predecessor-version":[{"id":4530,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/4527\/revisions\/4530"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media\/4529"}],"wp:attachment":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media?parent=4527"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/categories?post=4527"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/tags?post=4527"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}