{"id":4345,"date":"2016-02-13T14:15:58","date_gmt":"2016-02-13T14:15:58","guid":{"rendered":"http:\/\/www.oilnewskenya.com\/?p=4345"},"modified":"2017-01-26T09:15:40","modified_gmt":"2017-01-26T09:15:40","slug":"tanzania-petroleum-development-corporation-to-invest-in-1-9-billion-fertilizer-plant","status":"publish","type":"post","link":"https:\/\/www.oilnewskenya.com\/index.php\/tanzania-petroleum-development-corporation-to-invest-in-1-9-billion-fertilizer-plant\/","title":{"rendered":"Tanzania Petroleum Development Corporation to Invest in $1.9 Billion Fertilizer Plant"},"content":{"rendered":"<p>The Tanzania Petroleum Development Corporation has announced that it will invest in a fertilizer plant to be set Kilwa division Lindi district German investors Ferostaal Industrial Project GmbH at a cost of $1.9 billion.<\/p>\n<p>TPDC says it is the government\u2019s plan to support companies investments in the extractive sector with the plant expected to produce 3850 tonnes of fertilizer daily.<\/p>\n<p><a href=\"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/02\/TPDC-Wellington-Hudson.jpg?ssl=1\"><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" class=\" size-medium wp-image-4346 alignleft\" src=\"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/02\/TPDC-Wellington-Hudson-300x198.jpg?resize=300%2C198&#038;ssl=1\" alt=\"TPDC Wellington Hudson\" width=\"300\" height=\"198\" srcset=\"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/02\/TPDC-Wellington-Hudson.jpg?w=300&amp;ssl=1 300w, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/02\/TPDC-Wellington-Hudson.jpg?resize=100%2C66&amp;ssl=1 100w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a>According to TPDC Director for Production, Processing, Transport and delivery of natural gas \u00a0Dr. Wellington Hudson who met representatives from Kilwa, Lindi \u00a0the joint venture will utilize 104 million cubic feet daily and will produce two types of fertilizer namely ammonia and urea.<\/p>\n<p>TPDC through its managing director Dr. James Mataragio adds that the plant will provide 5000 direct jobs as well as opportunities for players in the building and construction industries who will provide the needed raw materials.<\/p>\n<p>The project is also expected to increase earnings for the corporation through consumption of natural gas while at the same time provide opportunities to better sectors such as health, aviation, sea ports among others.<\/p>\n<p>They were both speaking at a familiarization and community awareness tour in Kilwa that saw representatives including the area members of parliament, district commissioners and heads of various committees including security attend with the aim of ironing issues related to the project.<\/p>\n<p>Since the discovery of natural gas in Tanzania the economy has witnessed tremendous growth with 70% of power generation coming from gas which is currently serving 37 industries in Dar es Sallam according to TPDC.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Tanzania Petroleum Development Corporation has announced that it will invest in a fertilizer plant to be set Kilwa division Lindi district German investors Ferostaal Industrial Project GmbH at a &hellip; <a href=\"https:\/\/www.oilnewskenya.com\/index.php\/tanzania-petroleum-development-corporation-to-invest-in-1-9-billion-fertilizer-plant\/\" class=\"more-link\">Read More<\/a><\/p>\n","protected":false},"author":24,"featured_media":4349,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[11],"tags":[730,4066,4067,1415,1696,2472,2543],"class_list":["post-4345","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-top-news","tag-electricity","tag-ferostaal-industrial-project-gmbh","tag-fertlizer","tag-lindi","tag-natural-gas","tag-tanzania-petroleum-development-corporation","tag-tpdc","entry"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/02\/Ferostaal-2.jpg?fit=978%2C314&ssl=1","jetpack_shortlink":"https:\/\/wp.me\/p5JWkQ-185","jetpack-related-posts":[{"id":4211,"url":"https:\/\/www.oilnewskenya.com\/index.php\/tanzania-settles-on-lng-facility-location\/","url_meta":{"origin":4345,"position":0},"title":"Tanzania settles on LNG facility location","author":"","date":"January 4, 2016","format":false,"excerpt":"Tanzania will build its LNG facility in Lindi with the Tanzania Petroleum Development Corporation having acquired the title deed for a 2,071Ha parcel of land. According to TPDC the land location was reached in agreement with international oil companies with interest on the project all of whom have discovered gas\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/05\/LNG.jpg?fit=660%2C435&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/05\/LNG.jpg?fit=660%2C435&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/05\/LNG.jpg?fit=660%2C435&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":4308,"url":"https:\/\/www.oilnewskenya.com\/index.php\/tpdc-commences-land-compensation-process-for-lng-facility-land\/","url_meta":{"origin":4345,"position":1},"title":"TPDC commences land compensation Process for LNG Facility Land","author":"","date":"January 29, 2016","format":false,"excerpt":"The Tanzania Petroleum Development Corporation has commenced the process to authenticate title deeds held by plot no.1 Kitalu A land owners in Likong\u2019o, Lindi municipality the site for the construction of LNG facility. This follows an earlier announcement by TPDC that it had acquired\u00a0 the land intended to be used\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/03\/lng1.jpg?fit=660%2C435&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/03\/lng1.jpg?fit=660%2C435&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/03\/lng1.jpg?fit=660%2C435&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":5889,"url":"https:\/\/www.oilnewskenya.com\/index.php\/tpdc-to-carry-out-feasibility-study-on-regional-natural-gas-distribution\/","url_meta":{"origin":4345,"position":2},"title":"TPDC To Carry out Feasibility Study on Regional Natural Gas Distribution","author":"","date":"April 25, 2017","format":false,"excerpt":"The Tanzania Petroleum Development Corporation\u00a0has said it intends to run a feasibility study of the construction of the infrastructure as well as conducting studies of the natural gas markets and then developing regional infrastructure, mini-LNG and CNG in the fiscal year 2017\/18. In a public notice TPDC says this study\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/09\/mnazi-bay-gas.jpg?fit=750%2C665&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/09\/mnazi-bay-gas.jpg?fit=750%2C665&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/09\/mnazi-bay-gas.jpg?fit=750%2C665&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/09\/mnazi-bay-gas.jpg?fit=750%2C665&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":3884,"url":"https:\/\/www.oilnewskenya.com\/index.php\/tanzania-president-set-to-launch-gas-processing-facility-and-pipeline-at-mtwara\/","url_meta":{"origin":4345,"position":3},"title":"Tanzania President set to launch Gas Processing Facility and Pipeline at Mtwara","author":"","date":"October 6, 2015","format":false,"excerpt":"Tanzania President Jakaya Kikwete is this week expected to launch gas processing facility and pipeline from Mtwara through Songo songo to Dar es Salaam according to Tanzania Petroleum Development Corporation (TPDC) managing director Dr. James Mataragio. According to Mataragio construction works are already complete with pumping of gas already ongoing\u2026","rel":"","context":"In &quot;Profile&quot;","block_context":{"text":"Profile","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/profile\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/02\/Songo-Songo-Orca-exploration.png?fit=302%2C417&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":4783,"url":"https:\/\/www.oilnewskenya.com\/index.php\/aminex-receives-one-year-extension-for-ruvuma-psa\/","url_meta":{"origin":4345,"position":4},"title":"Aminex Receives One Year Extension For Tanzania&#8217;s Ruvuma PSA","author":"","date":"June 27, 2016","format":false,"excerpt":"Aminex has announced that it has received a one-year extension for the Mtwara Licence of the Ruvuma Production Sharing Agreement after completing discussions with the Tanzanian Petroleum Development Corporation (TPDC) with the license due to expire late December 2016. TPDC is processing the extension for Ministerial approval and signature. Furthermore,\u2026","rel":"","context":"In \"Aminex\"","block_context":{"text":"Aminex","link":"https:\/\/www.oilnewskenya.com\/index.php\/tag\/aminex\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/09\/ntorya-appraisal-area.jpg?fit=401%2C450&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":11704,"url":"https:\/\/www.oilnewskenya.com\/index.php\/tanzania-tpdc-hires-baker-botts-to-advise-on-30-billion-lng-project\/","url_meta":{"origin":4345,"position":5},"title":"TANZANIA: TPDC Hires Baker Botts to Advise on $30 Billion LNG Project","author":"","date":"January 26, 2022","format":false,"excerpt":"Baker Botts (UK) L.L.P has confirmed press reports that it has been hired by the Tanzania Petroleum Development Corporation (TPDC), the national oil company of Tanzania, as the Transaction Adviser to the Government Negotiation Team and TPDC regarding the development of a liquefied natural gas project. The project involves development\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2013\/12\/06dec_tanzania_468map.gif?fit=468%2C476&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]}],"jetpack_sharing_enabled":true,"jetpack_likes_enabled":true,"_links":{"self":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/4345","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/comments?post=4345"}],"version-history":[{"count":1,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/4345\/revisions"}],"predecessor-version":[{"id":4350,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/4345\/revisions\/4350"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media\/4349"}],"wp:attachment":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media?parent=4345"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/categories?post=4345"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/tags?post=4345"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}