{"id":4147,"date":"2015-12-01T10:24:31","date_gmt":"2015-12-01T10:24:31","guid":{"rendered":"http:\/\/www.oilnewskenya.com\/?p=4147"},"modified":"2017-01-26T11:21:39","modified_gmt":"2017-01-26T11:21:39","slug":"logistic-operations-begin-at-the-tarach-1-well-in-kenya-block-11a","status":"publish","type":"post","link":"https:\/\/www.oilnewskenya.com\/index.php\/logistic-operations-begin-at-the-tarach-1-well-in-kenya-block-11a\/","title":{"rendered":"Logistics Operations begin at the Tarach-1 well in Kenya Block 11A"},"content":{"rendered":"<p>Work towards the Tarach-1 well expected to spud at the end of the first quarter of 2016 has begun with the operating partner CEPSA having awarded drilling service contracts following the requisite tenders and logistics operations toward drilling have begun.<\/p>\n<p>In the meantime Block 11A venture partner has reported increased interest in farming into Kenya as drilling approaches and says it is in discussions with several interested international E&amp;P companies.<\/p>\n<p>The mean estimate of oil prospective unrisked resources for the prospect is 65 million barrels with the mean unrisked prospective resources of all prospects and leads in Block 11A totals 645 million barrels.<\/p>\n<p>The two partners had earlier said that contingent upon the results of Tarach-1, they might decide to drill a second exploratory well, the Egole-1 a four-way rollover closure onto a Northwest \u2013 Southeast trending fault plain with mean prospective resources of 101 million barrels of oil, to follow shortly thereafter.<\/p>\n<p>The <a href=\"http:\/\/ht.ly\/VjtBL\">prospect<\/a> is defined by four 2D seismic lines out of the 2014 survey. The structural trap is a 3-way dip closure against a north-south normal fault plane at 1,426 mMD (-954m TVDSS) and covering a surface area of 12 sq.km. The vertical closure is calculated at 220 meters at the P10 closing contour.<\/p>\n<p>The joint venture partners are currently in the second <a href=\"http:\/\/ht.ly\/Vjume\">phase<\/a> of exploration entered in September 2014 which require them to either acquire 3D seismic or proceed directly to drilling one exploration well during the additional two-year exploration period.<\/p>\n<p>ERHC holds a 35 percent interest in Block 11A while CEPSA has a 55 percent interest.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Work towards the Tarach-1 well expected to spud at the end of the first quarter of 2016 has begun with the operating partner CEPSA having awarded drilling service contracts following &hellip; <a href=\"https:\/\/www.oilnewskenya.com\/index.php\/logistic-operations-begin-at-the-tarach-1-well-in-kenya-block-11a\/\" class=\"more-link\">Read More<\/a><\/p>\n","protected":false},"author":24,"featured_media":4149,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[11],"tags":[261,431,433,494,3129,796,1252,1440,2214,3128],"class_list":["post-4147","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-top-news","tag-block-11a","tag-cepsa","tag-cepsa-kenya-limited","tag-compania-espanola-de-petroleos","tag-egole-1","tag-erhc","tag-kenya","tag-logistics","tag-s-a-u","tag-tarach-1","entry"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/12\/block-11A.jpg?fit=234%2C215&ssl=1","jetpack_shortlink":"https:\/\/wp.me\/p5JWkQ-14T","jetpack-related-posts":[{"id":4360,"url":"https:\/\/www.oilnewskenya.com\/index.php\/tarach-1-well-in-kenyas-block-11a-drilling-date-on-schedule-as-rig-mobilization-commences\/","url_meta":{"origin":4147,"position":0},"title":"Tarach 1 well in Kenya\u2019s Block 11A Drilling Date on schedule as Rig Mobilization Commences","author":"","date":"February 17, 2016","format":false,"excerpt":"The drilling rig for the Tarach 1 well in Block 11A has being mobilized to the drill site where concreting work and installation of conductors have already been completed as the JV partners Compa\u00f1\u00eda Espa\u00f1ola de Petr\u00f3leos, S.A.U.\u00a0 (CEPSA) operator* and ERHC work relentlessly toward a spud date near the\u2026","rel":"","context":"In \"Block 11A\"","block_context":{"text":"Block 11A","link":"https:\/\/www.oilnewskenya.com\/index.php\/tag\/block-11a\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/07\/kenya-block-11a-2.jpg?fit=300%2C258&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":4758,"url":"https:\/\/www.oilnewskenya.com\/index.php\/cepsa-erhc-disappointed-at-kenyas-block-11a-tarach-1-well-source\/","url_meta":{"origin":4147,"position":1},"title":"CEPSA, ERHC Disappointed at Kenya\u2019s Block 11A Tarach-1 well &#8211; Source","author":"","date":"June 15, 2016","format":false,"excerpt":"OilNews Kenya has learnt that the search for oil and gas at Tarach-1 in Kenya\u2019s Block 11A has not been successful and works are ongoing to plug the well according to a reliable source. The drilling that commenced on 14th April 2016 using the SMP 106 rig in the north\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/04\/Tarach-1-well-rig.png?fit=551%2C412&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/04\/Tarach-1-well-rig.png?fit=551%2C412&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/04\/Tarach-1-well-rig.png?fit=551%2C412&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":5116,"url":"https:\/\/www.oilnewskenya.com\/index.php\/cepsa-erhc-hit-dry-well-at-kenyas-block-11a-tarach-1\/","url_meta":{"origin":4147,"position":2},"title":"CEPSA, ERHC Hit Dry Well at Kenya\u2019s Block 11A Tarach-1","author":"","date":"September 1, 2016","format":false,"excerpt":"Earlier reports by OilNews Kenya that the Tarach-1 well in Block 11A was disappointing have now been confirmed with the commissioner for petroleum Martin Heya at the Ministry of Energy and Petroleum saying\u00a0the Spanish explorer Compania Espanola de Petroleos\u00a0 (CEPSA)was a dry well. According to the commissioner the block operator\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/04\/Tarach-1-well-rig.png?fit=551%2C412&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/04\/Tarach-1-well-rig.png?fit=551%2C412&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/04\/Tarach-1-well-rig.png?fit=551%2C412&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":3829,"url":"https:\/\/www.oilnewskenya.com\/index.php\/erhc-still-hopeful-first-well-kenyas-block-11a-march-2016\/","url_meta":{"origin":4147,"position":3},"title":"ERHC still hopeful of first well in Kenya\u2019s Block 11A by March 2016","author":"","date":"September 17, 2015","format":false,"excerpt":"Kenya\u2019s Block 11A joint venture partner ERHC says the contracting parties plan to spud the first well at the Tarach-1 prospect by the end of the first quarter of 2016 in its latest update. The Tarach-1 prospect located at the central part of the Tarach basin is a three-way structural\u2026","rel":"","context":"In \"Block 11A\"","block_context":{"text":"Block 11A","link":"https:\/\/www.oilnewskenya.com\/index.php\/tag\/block-11a\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/07\/kenya-block-11a-2.jpg?fit=300%2C258&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":2846,"url":"https:\/\/www.oilnewskenya.com\/index.php\/cepsa-erhc-identify-drilling-location-kenyas-block-11a\/","url_meta":{"origin":4147,"position":4},"title":"CEPSA, ERHC identify drilling location in Kenya\u2019s Block 11A","author":"","date":"April 23, 2015","format":false,"excerpt":"Spanish exploration company CEPSA and Houston based explorer ERHC have said that its exploration team has identified the Tarach-1 prospect as the drilling location for the first exploration well set to be drilled in March 2016 in an announcement by ERHC. This decision was based on interpretation of 1,086.6 kilometers\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/07\/kenya-block-11a-2.jpg?fit=300%2C258&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":4578,"url":"https:\/\/www.oilnewskenya.com\/index.php\/cepsa-erhc-commence-drilling-at-tarach-1-prospect-in-kenyas-block-11a\/","url_meta":{"origin":4147,"position":5},"title":"CEPSA, ERHC Commence Drilling At Tarach-1 Prospect in Kenya\u2019s Block 11A","author":"","date":"April 15, 2016","format":false,"excerpt":"The SMP drilling rig has spud at the wildcat Tarach-1 drilling prospect (situated in the central part of the Tarach basin) with the well expected to take 60 days to complete. The drilling which started at 6pm on Thursday in the north western most block in Kenya targets to drill\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/04\/Tarach-1-well-rig.png?fit=551%2C412&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/04\/Tarach-1-well-rig.png?fit=551%2C412&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/04\/Tarach-1-well-rig.png?fit=551%2C412&ssl=1&resize=525%2C300 1.5x"},"classes":[]}],"jetpack_sharing_enabled":true,"jetpack_likes_enabled":true,"_links":{"self":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/4147","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/comments?post=4147"}],"version-history":[{"count":2,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/4147\/revisions"}],"predecessor-version":[{"id":4150,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/4147\/revisions\/4150"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media\/4149"}],"wp:attachment":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media?parent=4147"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/categories?post=4147"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/tags?post=4147"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}