{"id":4134,"date":"2015-11-24T17:21:57","date_gmt":"2015-11-24T17:21:57","guid":{"rendered":"http:\/\/www.oilnewskenya.com\/?p=4134"},"modified":"2017-01-26T12:27:30","modified_gmt":"2017-01-26T12:27:30","slug":"swala-energy-prepares-for-drilling-of-kito-prospect-in-tanzania","status":"publish","type":"post","link":"https:\/\/www.oilnewskenya.com\/index.php\/swala-energy-prepares-for-drilling-of-kito-prospect-in-tanzania\/","title":{"rendered":"Swala Energy prepares for drilling of Kito Prospect in Tanzania"},"content":{"rendered":"<p>Swala Energy has started the process of looking for a drilling company for the Kito 1 Exploration Well in the Kilosa-Kilombero Block expected to spud in Early September 2016.<\/p>\n<p>According to details on the expression of interest by the explorer the EOI is also a rig survey to establish viable rigs to be included in the required tender process to take place in February 2016 with the kito prospect expected will reach about 1,200 metres in depth.<\/p>\n<p>The Kito prospect identified following 430km 2D seismic survey carried out in the Kilombero Basin in 2013 which suggested structural similarities between the Kilombero Basin and the Lokichar Basin in Kenya.<\/p>\n<p>The first line of the current seismic survey acquired in the Kilombero Basin, Line 101, extended along the strike of the main bounding fault with initial interpretation of these data suggest the presence of four new structured leads, each being 5 to 10km in length.<\/p>\n<p>At the northern end of Line 101, just beyond the Kito Prospect, the data showed that one of the identified reservoir horizons is rising, potentially indicating the presence of another structural closure.<\/p>\n<p>A second well (option) in the Pangani Block onshore Tanzania.<\/p>\n<p>Just recently Swala Energy announced it had awarded the Drill Support Team contract for the 2016 drilling campaign to the Tanzanian subsidiary of AWT International (Asia) Sdn Bhd, a Singapore-headquartered firm offering subsurface, subsea and surface facilities engineering services and contracting solutions to the oil and gas industry.<\/p>\n<p>Meanwhile Swala Energy has said it has repaid amounts owing under an Interim Loan Facility to Hayaat International Limited for an amount of USD 1.1 million including fees under the terms of the Loan Facility as announced on 1 June 2015.<\/p>\n<p>\u201cWe are once again grateful to Hayaat, a cornerstone investor in Swala, for their ongoing support and in particular having provided interim funding under the Loan Facility.\u201d Dr. David Mestres Ridge (Swala CEO) said.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Swala Energy has started the process of looking for a drilling company for the Kito 1 Exploration Well in the Kilosa-Kilombero Block expected to spud in Early September 2016. According &hellip; <a href=\"https:\/\/www.oilnewskenya.com\/index.php\/swala-energy-prepares-for-drilling-of-kito-prospect-in-tanzania\/\" class=\"more-link\">Read More<\/a><\/p>\n","protected":false},"author":24,"featured_media":1171,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[11],"tags":[3773,3281,1327,1337,1445,1967,2447],"class_list":["post-4134","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-top-news","tag-awt-international","tag-hayaat-international-limited","tag-kilosa-kilombero","tag-kito-prospect","tag-lokichar-basin","tag-pangani-block","tag-swala-energy","entry"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/06\/swala-energy.jpg?fit=606%2C441&ssl=1","jetpack_shortlink":"https:\/\/wp.me\/p5JWkQ-14G","jetpack-related-posts":[{"id":1970,"url":"https:\/\/www.oilnewskenya.com\/index.php\/tanzanias-kilombero-basin-seismic-shows-multiple-structures-similar-to-the-lokichar-basin\/","url_meta":{"origin":4134,"position":0},"title":"Tanzania&#8217;s Kilombero basin Seismic Shows Multiple Structures similar to the Lokichar basin","author":"Samuel Kamau Mbote","date":"October 29, 2014","format":false,"excerpt":"Swala Energy Limited has announce that the seismic survey being carried out in the Kilombero Basin by Swala Oil and Gas (Tanzania) Plc has provided the first evidence of multiple structures - a \u2018string of pearls\u2019- along the western basin boundary fault. The seismic survey which was planned after the\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"swala kilombero main fault","src":"https:\/\/i0.wp.com\/oilnewskenya.com\/wp-content\/uploads\/2014\/10\/swala-kilombero-main-fault.png?resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/oilnewskenya.com\/wp-content\/uploads\/2014\/10\/swala-kilombero-main-fault.png?resize=350%2C200 1x, https:\/\/i0.wp.com\/oilnewskenya.com\/wp-content\/uploads\/2014\/10\/swala-kilombero-main-fault.png?resize=525%2C300 1.5x"},"classes":[]},{"id":7053,"url":"https:\/\/www.oilnewskenya.com\/index.php\/swala-oil-gas-pushes-kito-1-well-drilling-2019\/","url_meta":{"origin":4134,"position":1},"title":"Swala Oil &#038; Gas Pushes Kito 1 Well Drilling to 2019","author":"","date":"June 12, 2018","format":false,"excerpt":"The drilling of the Kito 1 well in Tanzania\u2019s Kilosa Kilombero license will likely happen in 2019 following the signing of a Memorandum of Understanding between Swala Oil and Gas, the Tanzania Petroleum Development Corporation and the Tanzania Wildlife Management Authority that will ensure that the explorer receives, in a\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":4534,"url":"https:\/\/www.oilnewskenya.com\/index.php\/swala-energys-kito-prospect-on-schedule-for-drilling-in-3rd-quarter-2016\/","url_meta":{"origin":4134,"position":2},"title":"Swala Energy\u2019s Kito Prospect on Schedule for Drilling in 3rd Quarter 2016","author":"","date":"March 30, 2016","format":false,"excerpt":"Swala Energy and Tata Petrodyne\u00a0 have said all is set to drill at the Kilosa Kilombero license in Q3 2016 with the latest feasibility study showing the majority of roads and bridges are suitable to move a rig. According to Swala Energy two bridges are likely to be bypassed as\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/03\/Kito-propsect2D-image.png?fit=418%2C477&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":2248,"url":"https:\/\/www.oilnewskenya.com\/index.php\/swala-energy-completes-2014-seismic-programme-over-tanzanias-kilombero-basin\/","url_meta":{"origin":4134,"position":3},"title":"Swala Energy Completes 2014 Seismic Programme over Tanzania&#8217;s Kilombero Basin","author":"Samuel Kamau Mbote","date":"January 6, 2015","format":false,"excerpt":"Swala Energy Limited has announced that has successfully completed its 430km 2D seismic programme over the Kilombero Basin in central Tanzania. As the Company earlier announced in October 2014, initially the seismic programme identified a series of structural leads on the western margin of the basin with the geometry of\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/10\/kilosa-kilombero.png?fit=337%2C329&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":274,"url":"https:\/\/www.oilnewskenya.com\/index.php\/swala-energy-reports-optimism-in-its-tanzania-exploration\/","url_meta":{"origin":4134,"position":4},"title":"Swala Energy reports optimism in its Tanzania exploration","author":"Samuel Kamau Mbote","date":"December 17, 2013","format":false,"excerpt":"[twitter-follow screen_name='oilnewskenya'] Australian owned Swala Energy Limited has announced that RISC Operations Pty Ltd an independent petroleum advisory firm, have completed their review of the resource potential of the Kito \u00a0prospect in the Kilombero Basin, located within the Kilosa- Kilombero licence in southern \u00a0Tanzania. Swala has an indirect 32.5% interest\u2026","rel":"","context":"In &quot;New Discoveries&quot;","block_context":{"text":"New Discoveries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/new-discoveries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2013\/12\/kilombero.png?fit=427%2C322&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":7174,"url":"https:\/\/www.oilnewskenya.com\/index.php\/swala-lifts-force-majeure-kilosa-kilombero\/","url_meta":{"origin":4134,"position":5},"title":"Swala Lifts Force Majeure On Kilosa-Kilombero","author":"","date":"September 17, 2018","format":false,"excerpt":"Swala Oil & Gas (Tanzania) plc has lifted the Force Majeure over the Kilosa-Kilombero licence announced to the market on the 23rd April 2018. According to Swala the Company has collaborated closely with the Tanzania Petroleum Development Corporation since April towards attaining the necessary permits for drilling the Kito 1\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2018\/08\/Swala-Tanzania.png?fit=484%2C352&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]}],"jetpack_sharing_enabled":true,"jetpack_likes_enabled":true,"_links":{"self":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/4134","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/comments?post=4134"}],"version-history":[{"count":1,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/4134\/revisions"}],"predecessor-version":[{"id":4135,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/4134\/revisions\/4135"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media\/1171"}],"wp:attachment":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media?parent=4134"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/categories?post=4134"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/tags?post=4134"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}