{"id":4092,"date":"2015-11-17T06:05:04","date_gmt":"2015-11-17T06:05:04","guid":{"rendered":"http:\/\/www.oilnewskenya.com\/?p=4092"},"modified":"2017-01-26T12:36:44","modified_gmt":"2017-01-26T12:36:44","slug":"emesek-1-exploration-well-in-kenyas-north-turkana-basin-disappoints","status":"publish","type":"post","link":"https:\/\/www.oilnewskenya.com\/index.php\/emesek-1-exploration-well-in-kenyas-north-turkana-basin-disappoints\/","title":{"rendered":"Emesek-1 exploration well in Kenya\u2019s North Turkana basin Disappoints"},"content":{"rendered":"<p>The Emesek-1 exploration well also known as the Tausi prospect located in the North Turkana basin\u00a0in Block 13T failed to encounter any oil and will be plugged and abandoned.<\/p>\n<p><a href=\"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/10\/Elmesek-Tausi-2.png?ssl=1\"><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" class=\" size-full wp-image-3962 alignleft\" src=\"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/10\/Elmesek-Tausi-2.png?resize=360%2C352&#038;ssl=1\" alt=\"Elmesek Tausi 2\" width=\"360\" height=\"352\" srcset=\"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/10\/Elmesek-Tausi-2.png?w=360&amp;ssl=1 360w, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/10\/Elmesek-Tausi-2.png?resize=100%2C98&amp;ssl=1 100w, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/10\/Elmesek-Tausi-2.png?resize=300%2C293&amp;ssl=1 300w\" sizes=\"auto, (max-width: 360px) 100vw, 360px\" \/><\/a>The Emesek-1 well which was also the\u00a0North Turkana basin opener spud in mid-October drilled to a depth of 3000 meters did not encounter commercial hydrocarbons according to the joint venture partners in the Block Tullow Oil (operator), Africa Oil and Maersk Oil.<\/p>\n<p><em>\u201cThe Emesek-1 well was the first well to be drilled in the North Lokichar basin. While this wildcat well did not find commercial hydrocarbons, it provides valuable data as we assess the wider prospectivity of this basin,\u201d commented\u00a0Angus Mccoss, Exploration Director, Tullow Oil Plc.<\/em><\/p>\n<p>The North Turkana basin is immediately north of the South Lokichar producing trend and has a younger \u2018fill\u2019 than South Lokichar but also expected to share same Miocene sequence.<\/p>\n<p>Following completion of operations, the rig will move to the South Lokichar basin to drill the Etom-2 well in an undrilled fault block adjacent to the Etom oil discovery.<\/p>\n<p>The <a href=\"http:\/\/ht.ly\/UJSLv\">Etom-1 well<\/a> in Block 13T is the most northerly well drilled to date in the South Lokichar basin, 6.5 km north of the previous Agete-1 discovery. The well encountered approximately 10 metres of net oil pay, extending the proven oil basin significantly northwards.<\/p>\n<p>The Weatherford 804 rig drilled the Etom-1 well to a final depth of 2,000 metres.<\/p>\n<p>\u201cWe are quite pleased with the Etom discovery which extends the proven petroleum system to the northern portion of the Lokichar basin and derisks several large prospects in that area,\u201d Africa Oil CEO Keith Hill said in August 2014.<\/p>\n<p>The Marriot 46 drilling rig\u00a0will then move to drill the <a href=\"http:\/\/ht.ly\/UJSPW\">Cheptuket-1<\/a> exploration well in Block 12A and will test a basin bounding structural closure in the undrilled Kerio Valley Basin, in a similar structural setting to the successful Ngamia and Amosing discoveries.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Emesek-1 exploration well also known as the Tausi prospect located in the North Turkana basin\u00a0in Block 13T failed to encounter any oil and will be plugged and abandoned. The &hellip; <a href=\"https:\/\/www.oilnewskenya.com\/index.php\/emesek-1-exploration-well-in-kenyas-north-turkana-basin-disappoints\/\" class=\"more-link\">Read More<\/a><\/p>\n","protected":false},"author":24,"featured_media":4074,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[5,11],"tags":[70,264,266,3790,3792,3793,1299,3784,3795,1769,2490,2571,3794],"class_list":["post-4092","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-new-discoveries","category-top-news","tag-africa-oil","tag-block-12a","tag-block-13t","tag-cheptuket-1-well","tag-emesek-1","tag-etom-1-well","tag-kerio-valley-basin","tag-maersk-oil","tag-marriot-46-drilling-rig","tag-north-turkana-basin","tag-tausi-prospect","tag-tullow-oil","tag-weatherford-804-rig","entry"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/11\/Block-10BB-13T.png?fit=361%2C351&ssl=1","jetpack_shortlink":"https:\/\/wp.me\/p5JWkQ-140","jetpack-related-posts":[{"id":4157,"url":"https:\/\/www.oilnewskenya.com\/index.php\/tullow-oil-partners-plan-up-to-four-basin-openers-in-northern-kenya-next-year\/","url_meta":{"origin":4092,"position":0},"title":"Tullow Oil, Partners plan up to four basin openers in Northern Kenya next year","author":"","date":"December 2, 2015","format":false,"excerpt":"Block 10BB and 13T operator Tullow Oil together with JV partner\u00a0Maersk Oil and\u00a0Africa Oil will drill up to four new basin openers in the South Lokichar and the Turkana Lake Basin\u2019 in 2016 according to a\u00a0presentation by the latter to investors. Among prospects on the pipeline according to the Africa\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/11\/Block-10BB-13T.png?fit=361%2C351&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":2043,"url":"https:\/\/www.oilnewskenya.com\/index.php\/tullow-oil-africa-oil-receive-1-year-extension-in-block-10bb-13t\/","url_meta":{"origin":4092,"position":1},"title":"Tullow Oil, Africa Oil receive 1 year extension in block 10BB, 13T","author":"Samuel Kamau Mbote","date":"November 13, 2014","format":false,"excerpt":"The Kenyan government has approved extension of the exploration license in blocks 10BB and 13T by one year following delays in acquisition of 3D seismic. Following the approval exploration periods for block 10BB and 13T will expire in July 2017 and September 2017, respectively. This year the partners in both\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/06\/block-10bb.jpg?fit=598%2C746&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/06\/block-10bb.jpg?fit=598%2C746&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/06\/block-10bb.jpg?fit=598%2C746&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":3958,"url":"https:\/\/www.oilnewskenya.com\/index.php\/tullow-oil-block-kenyas-12a-basin-opener-drilling-pushed-to-q1-2016\/","url_meta":{"origin":4092,"position":2},"title":"Tullow Oil Pushes Kenya\u2019s Block 12A Basin Opener Drilling to Q1 2016","author":"","date":"October 29, 2015","format":false,"excerpt":"Block 12A basin opener Cheptuket exploration well earlier set to start drilling in October 2015 has been pushed forward to 2016 according to block operator Tullow Oil. The well which will test \u00a0test a basin bounding structural closure in the Kerio Valley Basin in a similar structural setting to the\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/03\/tullow-update.jpg?fit=456%2C600&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":4468,"url":"https:\/\/www.oilnewskenya.com\/index.php\/tullow-oil-hits-dry-well-in-cheptuket-well-in-block-12a-source\/","url_meta":{"origin":4092,"position":3},"title":"Tullow Oil Hits Dry Well in Cheptuket Well in Block 12A \u2013 Source","author":"","date":"March 11, 2016","format":false,"excerpt":"Three months after the drilling of the wildcat well in block 12A commenced OilNews Kenya has learnt from a source who chose to be anonymous that the well has since been completed with no significant hydrocarbon shows. The well which spud on December 28th 2015 by the PR Marriott Rig-46\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/07\/Mariott-Rig-with-watermark.jpg?fit=900%2C1200&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/07\/Mariott-Rig-with-watermark.jpg?fit=900%2C1200&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/07\/Mariott-Rig-with-watermark.jpg?fit=900%2C1200&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/07\/Mariott-Rig-with-watermark.jpg?fit=900%2C1200&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":2338,"url":"https:\/\/www.oilnewskenya.com\/index.php\/tullow-africa-oil-to-drill-up-to-6-basin-openers-in-northern-kenya-in-2015\/","url_meta":{"origin":4092,"position":4},"title":"Tullow, Africa Oil to drill up to 6 basin openers in Northern Kenya in 2015","author":"Samuel Kamau Mbote","date":"January 20, 2015","format":false,"excerpt":"\u00a0 Tullow Oil and Africa Oil say they plan to drill 6 basin openers in North Western Kenya\u2019s North Lokichar basin, Kerio basin as well as in North Turkana according to the latest presentation by Africa Oil. Of the six wells 4 of them are set to spud in Q1\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/01\/planned-wells-2015.png?fit=452%2C368&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":4272,"url":"https:\/\/www.oilnewskenya.com\/index.php\/cheptuket-1-well-in-kenyas-block-12a-on-course-to-complete-in-february\/","url_meta":{"origin":4092,"position":5},"title":"Cheptuket-1 Well in Kenya\u2019s Block 12A on course to complete in February","author":"","date":"January 20, 2016","format":false,"excerpt":"Block 12A basin opener Cheptuket well is still on its drilling schedule and is set to complete in February according to block operator Tullow Oil in its last update. The well that commenced drilling on 28th December 2014 by the PR Marriott Rig-46 is expected to test a basin bounding\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/07\/Mariott-Rig-with-watermark.jpg?fit=900%2C1200&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/07\/Mariott-Rig-with-watermark.jpg?fit=900%2C1200&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/07\/Mariott-Rig-with-watermark.jpg?fit=900%2C1200&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/07\/Mariott-Rig-with-watermark.jpg?fit=900%2C1200&ssl=1&resize=700%2C400 2x"},"classes":[]}],"jetpack_sharing_enabled":true,"jetpack_likes_enabled":true,"_links":{"self":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/4092","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/comments?post=4092"}],"version-history":[{"count":5,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/4092\/revisions"}],"predecessor-version":[{"id":4107,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/4092\/revisions\/4107"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media\/4074"}],"wp:attachment":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media?parent=4092"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/categories?post=4092"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/tags?post=4092"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}